Project:
Client: Consultant:
Testing & Commissioning of Electrical Equipment in progress Civil clearance for Bath Tub Installation in Chalets Approved (A) 672 25
Pretesting of panels in progress. Doors & Windows Installation are delaying Handed Over
Exp. Date to
Installation of Wiring Devices & Light Fixture in Palace & Chalets.
Complete
Isolator Installation & termination for equipment in progress Sub-Con.
Grills & Diffuser Installation in palace in progress parallel with civil. Submitted
Approved
Handed Over
Exp. Date to
Complete
Remarks
Prepared by: Mehsan Muhmmed Project Manager Mohanned Hanna Date: 30/Dec/99 Reviewed by: Operations Director
Doc. No.
HBOARD Rev.: 0
Date:
ment
Current Scope Value 52,051,338.96 Planned Claim upto this month 49,354,913.84
Exp. Re-measured Qty Actual Claim (EV) upto this month 44,408,504.47
fety Environment
Man-Hours Man-Hours Man-Hours
First Aid Case Major Injuries Medical Case
Worked without LTI without LTA
51,440 51,440 51,440 3 0 5
11,380,000 11,380,000 11,380,000 39 0 36
11,431,440 11,431,440 11,431,440 42 0 41
1,000,000.00 1,000,000.00
As-Built T&C Procedure O&M Manual Training Manual Warranties Spare Parts
457 15 21
17 15 0
0 14 0
Name:
Operations Director Date:
Signature:
Doc. No.:
Rev.:
Date:
Client:
Consultant:
Main Contractor:
In house Sub Contractor:
INDEX
1 1 Executive Project Summary
2 2 Schedule
§ Program
§ Progress
2 3 Engineering
§ Shop Drawings
§ Technical Queries (TQ/ SCR/ RFI )
3 4 Procurement
§ Material Submittals
§ Material Purchase Orders
4.1 § Logs
4.1 § Long Lead Tracking
4 5 QA/QC Status
§ Material Inspection
§ Installation Inspection
§ Non-conformance Report
5 6 Construction
§ Progress Accomplished This Month (Major Activities only)
§ One Month Look Ahead Plan (Major Activities only)
§ Site Photos
6 7 Commercial
7.1 § Payment Application Detail
7.2 § Scope Management Matrix (VO)
7.3 § Sub-contractor
7.4 § 7.4-Back Chargs detail
7 8 HSE - Report
§ HSE Report
§ PPE Update
8 9 Earned Value Management
§ Budget / Cost Comparison
§ ETC - Estimate to Complete + EAC -Estimate At Completion
9 10 Resources
§ Man-hours
§ STB Update
§ Histogram
### 11 Accounts
### 12 Store
### 13 Areas of Concern
### 14 Close-out
EXECUTIVE PROJECT SUMMARY - R67-M1-15
Project Name
Project Overview
The project is a palace on a beautiful site to the north of Qatar. The project consist of Palace, 6 No of Chalets
Kitchen and Garage, Service Yard, Horse Stable, Covered Traces and External Works.
1:Progress/Schedule:
MEP Over all progress is 94.95% as of 31-Mar-16 against planned progress of 100.00%
Over all progress Engineering - 100.00%, Procurement - 100.00%, Construction - 98.37% and T&C - 24%.
The Following is a List the major works that are under progress on site.
2- Engineering Progress:
Shop drawing progress: planned submission & approval 100 % & actual submission .100.00% Approved 100.00
3- Procurement
4- QA/QC:
Construction Progress:
6- Commercial
7- HSE
No Safety Issues
Estimate at Completion for the project is QAR 49,996,901.70 & the total budget is QAR 43,319,658.90 (Variance
2,054,437.26 (3.95%).
9- Resources:
Staff 10
Manpower 155
10- Accounts
11- Store :
Delivery of Emergency Lights, Wiring Devices Shortage, Civil Clearance for Bath tub Installation in Chalets and D
MEP work progres..
13- Close-out
MEP
. The project consist of Palace, 6 No of Chalets, Main Gate, Service Gate, Staff Quarter, Main
es and External Works.
00%.
on site.
m in progress
nt in progress
in progress
progress
-1.12%
-1.82%
-1.54%
-1.23%
-1.57%
-1.18%
-4.57%
-2.23%
-0.87%
-0.43%
-1.63%
Variance
-76.00%
he total budget is QAR 43,319,658.90 (Variance QAR -6,677,242.80). The overall gross profit is
.
earance for Bath tub Installation in Chalets and Doors & Windows Installation are delying the
Doc. No.: REE/OPR/05.1
R67-M1-15 - Monthly Project Report
Rev.: 0
SCHEDULE Date: 30-Dec-99
Project Overview
Program Details
Program Detail Rev Status Start Date Plan Completion Date Projected Completion Date
Progress Details
Variance
Month Progress Type Plan Actual
Total Engineering Procurement Construction
Physical
Forecast Mar-16 100.00%
Financial
Remarks
Doc. No.: REE/OPR/05.2
R6-M1-15 - Monthly Project Report
Rev.: 0
ENGINEERING Date: 30-Dec-99
As of: 30-Dec-99
Shop Drawings
Submitted
No. of Total Under Balance to
Description (On This Approved Rejected Remarks
Drawings Submitted Review Submit
Month)
HVAC 39 0 39 39 0 0 0
Plumbing 97 0 97 97 0 0 0
Fire Fighting 34 0 34 34 0 0 0
Builders work 25 0 25 25 0 0 0
Coordination 42 0 42 42 0 0 0
BMS 35 0 35 35 0 0 0
External 52 0 52 52 0 0 0
Mechanical 0 0 0
Electrical 0 0 0
Total 0 0 0
Open TQ's
Mechanical
Electrical
----------------------- -------------------- .
Project In charge Project Manager .
Doc.
No.:
Rev.: 0
Date.:
As of: 30-Dec-99
Material Submittal
Planned
No. of Submission Actual Balance to
Description Approved Rejected Under Review
Submittal (On This Submitted Submit
Month)
HVAC 23 0 23 23 0 0 0
Plumbing 31 0 31 31 0 0 0
Fire Fighting 25 0 25 25 0 0 0
Electrical 29 0 29 29 0 0 0
Plan PO to be issued
No. of PO MR Released This Actual - PO issued
This Month Remaining
Description upto Last Month month This Month
POs This Month
(Up to Jan-16) (Feb-16) (Feb-16)
(Feb-16)
HVAC 23 0 0 0 0
Plumbing 31 0 0 0 0
Fire Fighting 25 0 0 0 0
Electrical 29 0 0 0 0
Others 1 0 0 0 0
Total 109 0 0 0 0
----------------------- -------------------- .
Project In charge Project Manager .
Doc. No.: REE/OPR/05.3
R67-M1-15 - Monthly Project Report
Rev.: 0
PROCUREMENT Date.: 30-Dec-99
30-Dec-99
Doc. No.: REE/OPR/05.3.2
R67-M1-15 - Monthly Project Report
Rev.: 0
PROCUREMENT Date: 30-Dec-99
Long Lead Material Track Sheet (Delivery Period more than 8 Weeks)
Material Delivery
PO release Material Installation
S.No Item Description Required at Site Approval MR Date Remarks
Date Deliver Confirm by Inspection @ Site
Status Actual
Period Sup
1 Air Handling Units (AHU's) 01-Nov-15 Approved 14-Sep-15 17-Sep-15 60 81 83 Done Done Delivered
2 Air Terminals 10-Sep-15 Approved 25-Aug-15 01-Sep-15 50 75 121 Done In Progress Delivered
6 Water Filters 10-Sep-15 Approved 23-May-15 30-Jul-15 90 112 120 Done Done Delivered
7 Water Heaters 10-Sep-15 Approved 23-May-15 24-May-15 90 112 145 Done Done Delivered
10 Hot Water Circulation Pumps 10-Sep-15 Approved 17-May-15 19-May-15 100 115 105 Done Done Delivered
12 Oil/Grease Intercepter 03-Oct-15 Approved 02-Jun-15 03-Jun-15 90 90 104 Done Done Delivered
13 FM 200 System 10-Nov-15 Approved 04-Jul-15 08-Jul-15 90 90 125 Done Done Delivered
14 Foam Fire Supression System 10-Nov-15 Approved 04-Jul-15 08-Jul-15 90 90 125 Done Done Delivered
15 Fire Hose Reel & Cabinet 01-Sep-15 Approved 04-Jul-15 08-Jul-15 90 90 115 Done Done Delivered
16 Firefighting Pump 15-Oct-15 Approved 04-Jul-15 08-Jul-15 120 120 160 Done Done Delivered
17 Aerosol Fire Supression System 10-Nov-15 Approved 04-Jul-15 08-Jul-15 90 90 115 Done Done Delivered
21 CBS Equipment 14-Nov-15 Approved 24-Aug-15 25-Aug-15 80 80 138 Done In Progress Delivered
----------------------- -------------------- .
Project In charge Project Manager .
Doc. No.:
Rev.: 0
Date:
As of:
Material Inspection
HVAC
Plumbing 30 30 0 0
Fire Fighting
Electrical 27 27 0 0
Total 57 57 0 0
Installation Inspection
HVAC
Fire Fighting
External 29 11 18
Internal 0 0 0
Total 29 11 18
----------------------- -------------------- .
Project In charge Project Manager .
Open NCR Details:
Sl
Description Status
NO.
It has been noticed that installations of HVAC duct and pipes supports
are done with an unapproved anchot bolt (unifix) in Chalets, Main
Kitchen and Garage Building (Photos attached for your reference. You
are hereby instructed to immediately stop the fixation of the mentioned
1 Open
works using the unacceptable material and replace it with the approved
(Hilti) material. The contractor will bear all the contractual
consequences in case he continue the works without the approved
material and the contractual clauses will be applied in this case.
It was noticed that contractor is using rejected material for water supply
system instead of approved materials "MUELLER" You are hreby
2 Open
instructed to replaced executed works with approved materials you are
immediate corrective action is required.
It was noticed that the contractor proceed the work (Floor Concrete) In
4 Palace G.F. (Part # 03) Before inspection of Electrical works (Floor Open
conduits)
UPVC piping infront of Staff Quarter have already concreted without the
7 approved installation inspection and without rectifying the slope which is Open
not accepted
With reference NCR 21, 29, & 31 Contractor is proceeding with works
related to external Drainage drainage woithput approved work
8 Open
inspectio0nrequest for manhole & Sewage Networks for External
Drainage.
Backwash UPVC pipe line and water supply HDPE for pump room were
10 Open
backfilled and concreted before the time of inspection
----------------------- -------------------- .
Project In charge Project Manager .
Copper tape for lightening protection is casted in concrete prior to our
inspection for installation (photo attached).
12 Open
Earth wire has been used for connection between two copper tape
lenghts (phot attached).
The contractor has backfilled and concreted the area where the
Underground HDPE pipes was installed before the inspection time and
15 Open
without visual installation checking, please find the attached photos for
reference.
----------------------- -------------------- .
Project In charge Project Manager .
Doc. No.:
Rev.: 0
Date:
Not Approved Under Execution 2,696,425.12 Not Approved, Under Execution 2,696,425.12
Additonal QTY -
Previous Current
February-16 March-16
Monthly 1,254,600.00 154,913.84
Plan
Camulative 49,200,000.00 49,354,913.84
----------------------- -------------------- .
Doc. No.
Rev.:
Date:
EOT- (Submitted) -
Domestic Claim -
QAR 52,051,338.96
Current Forecast
March-16 April-16
154,913.84 2,696,425.12
49,354,913.84 52,051,338.96
3,416,480.82
44,408,504.47
----------------------- -------------------- .
3,261,566.98
-4,946,409.37
----------------------- -------------------- .
Payment Application Details
Application No Application Month Gross Application Amount Certified Amount Back Charges
----------------------- -------------------- .
Doc. No.
Rev.:
Date:
Outstanding Amount
1,938,041.27
5,202,842.39
7,538,395.71
4,025,524.13
12,499,872.78
1,790,807.59
3,109,661.79
36,105,145.66
----------------------- -------------------- .
R67-M1-15 - Monthly Project Re
COMMERCIAL
Scope Management Matrix
VO.2 Rev.01 Additional Swimming Pool Filling Line, Pumps & Backwash system. 103,099.38 43,354.36 12,569.81
VO.3 Rev.01 Additional VAV System & Related BMS Items 12,847.20 7,208.76 5,647.90
VO.5 Additional Shoower Grating, Pipe Workd & Floor Drain 48,399.32 5,052.58 2,780.76
VO.6 Additional External Containment for ELV Cables 145,281.07 291,410.16 26,221.03
VO.7 Additional DBs, SMDBs With Feeder Cable & Cable Containment 225,897.68 58,994.43 44,129.64
Variation orders that already agreed by UCC - Work already executed at site 2,696,425.123
Variation orders that still under review by Client and work not yet executed 0.00
Progress Engineering Manpower Material Long Lead Items Progress Inspection Claim by MEP (%)
Plan 12 5 19 5 100.00%
Actual 12 3 19 5 95.00%
Variance 0 -2 0 0 -5.00%
Remarks
Progress Engineering Manpower Material Long Lead Items Progress Inspection Claim by MEP (%)
Plan 32 7 2 1 100.00%
Actual 32 5 2 1 88.00%
Variance 0 -2 0 0 -12.00%
Remarks
Progress Engineering Manpower Material Long Lead Items Progress Inspection Claim by MEP (%)
Remarks
Progress Engineering Manpower Material Long Lead Items Progress Inspection Claim by MEP (%)
Progress Engineering Manpower Material Long Lead Items Progress Inspection Claim by MEP (%)
Plan 100.00%
Actual 100.00%
Variance 0.00%
SubCon Name: URUK Constructions Trade & Services WLL Scope: Installation Of Duct With Insulation
Progress Engineering Manpower Material Long Lead Items Progress Inspection Claim by MEP (%)
Plan 100.00%
Actual 100.00%
Variance 0.00%
Remarks Scope of work already Completed and this subcontractor already demobilized from site
Progress Engineering Manpower Material Long Lead Items Progress Inspection Claim by MEP (%)
Plan 100.00%
Actual 100.00%
Variance 0.00%
Remarks Scope of work already Completed and this subcontractor already demobilized from site
Progress Engineering Manpower Material Long Lead Items Progress Inspection Claim by MEP (%)
Plan 100.00%
Actual 100.00%
Variance 0.00%
Progress Engineering Manpower Material Long Lead Items Progress Inspection Claim by MEP (%)
Remarks Already Contromat pepole demobilized from site and if any rework REE only doing
Sub Contractor- 10 Status
SubCon Name: Raymond Nahra For Electrical & Mechnical Works Scope: Installation of DX AHUl's & FAHU's Copper Pipes
Progress Engineering Manpower Material Long Lead Items Progress Inspection Claim by MEP (%)
Remarks
40,000.00 40,000.00
Progress Engineering Manpower Material Long Lead Items Progress Inspection Claim by MEP (%)
Remarks
Progress Engineering Manpower Material Long Lead Items Progress Inspection Claim by MEP (%)
Plan
Remarks
Progress Engineering Manpower Material Long Lead Items Progress Inspection Claim by MEP (%)
Plan
Remarks
Sub Contractor- 14 Status
SubCon Name: Mohammad Aurangjeb Ansari Scope: 6 Months Extendable Rental For 3 Ton
Progress Engineering Manpower Material Long Lead Items Progress Inspection Claim by MEP (%)
Remarks
Doc. No.
R67-M1-15 - Monthly Project Report
Rev.:
COMMERICAL Date:
----------------------- -------------------- .
Commercial Manager Project Manager .
Doc. No.:
R67-M1-15 - Monthly Project Report
HSE & PPE
Rev.:
Date:
HSE Report
Major Injuries - - -
Medical Case 36 5 41
Occupational Illness
Incident Reports Near Miss Unsafe Act. Unsafe Condition Damage Report
This Month 0 1 1 0
Last Month 1 18 7 1
Induction / Training HSE Induction In house Training Tool Box Talks Tool Box Topics
PPE
Safety
Helmet Jacket Cover Gloves Goggles
Shoes
Available In Store 20 14 23 0 0 8
New Requirement 0 0 0 0 0 0
Remarks
----------------------- -------------------- .
Project In charge Project Manager .
Doc. No.
R67-M1-15 - Monthly Project Report
Rev.:
Cost Control Date:
Fire Fighting
3,359,591.00 3,259,443.53 30,000.00 3,289,443.53
Plumbing
Material Cost
Electrical 15,040,630.00 15,086,145.88 200,000.00 15,286,145.88
HVAC
Fire Fighting
6,180,000.00
Plumbing 14,217,600.26 514,800.00 14,732,400.26
Manpower
Electrical
Note:
01. As of Our Record for the material recieved at site up to 31-Mar-16 26,163,189.28
Actual Material Cost as per Finance Report up to 31-Mar-16 26,667,132.00
Difference (503,942.72)
Doc. No.:
Rev.:
Date:
Resources
FF 0 3 -3 - 780 780 0
Additional Requirement
STB Type No of Units @ Site STB Issued to Worker STB Available @ Store
If any
Ducting 5 0 10 0
Plumbing 0 0 0 0
Electrical + BMS 5 0 15 0
Remarks
Plan
Actual - Conducted
Date:
- -
Doc. No.:
R67-M1-15 - Monthly Project Report
STORE
Rev.:
Date:
STOCK VALUE
Stock Pervious Month (February - 2016) Stock This Month (March - 2016)
Electrical- MV/ LV
609,142.71 - 76,899.73 686,042.44 332,685.41 - 79,813.57 412,498.98
Electrical- ELV
Date:
Areas of Concern
Suggested Action
S.# Concern Impact
Action Action By Date
Delivery of Emergency lights for staircase in Palace, chalets & Follow up with UCC
1 Delay in Installation & Handing Over Mr. Mohannad Hanna Weekly
Ancillary buildings
2 Delivery of wiring devices Delaying the MEP Final Fixture Installation Follow up with UCC Mr. Mohannad Hanna Daily
3 Civil clearance for Bath Tub Installation in Chalets Delay the installation in Chalet Follow up with UCC Mr. Mohannad Hanna Daily
Delay the MEP Air Balancing Testing & Follow up with UCC
4 Doors & Windows Installation are delaying Mr. Mohannad Hanna Daily
Commissioning
10
Doc. No.:
Rev.:
Date:
Total 64 37 27
Inspection
Material
Code - A 25 13 12
Total
Red Line Drw
Submitted
Approved
Approved 0 0 0
Handed Over
Total 15 1 4 2 8
Submitted 15 2
T&C Procedure
1 4 8
Approved 14 1 3 2 8
Procedure Execution 10 1 3 2 4
T&C Accepted by The Engineer 2 0 0 2 0
Exp. Date to Complete the T&C
Total Received
Punch List
Work Completed
Total 21 4 4 6 7
O&M Manual
Submitted 0 0 0 0 0
Approved 0 0 0 0 0
Handed Over 0 0 0 0 0
Exp. Date to Complete
Total
Submitted
Training
Approved
Conducted
Total
Submitted
Warranties
Approved
Handed Over
Total
Submitted
Spare Parts
Approved
Handed Over
TABLE OF CONTENTS
Project Overview
§ Project
§ Program
§ Progress
§ Progress S - Cuve
§ Loo Ahead Program
Engineering
Procurement
QA/QC Status
Resources
§ Man-hours
§ Tools & Plants
Sub-Con. Status
HSE - Report
Commercial
§ Contract Value Detail
§ Claim Detail & S- Curve
§ Budget - Cost Comparison
§ Completion Cost Forecast
§ Petty Cash Report
§ Correspondence Detail
§ Scope Management Matrix
Area of Concerns
Progress Photograph
Lesson Learned
Admin Report
Project Overview
Project Details
Project:
Client:
Designer:
MEP Designer:
Consultant:
Main Contractor:
MEP Contractor:
1
2
In House Sub-Con:
3
4
Program Detail
Progress Detail
Variance
Month Plan Actual
Month Plan Actual
Total EL HVAC
Pervious
Current
Forecast
Progress- S Curve
HSE - Report
Original Contract BOQ Adjustment Scope Deletion (c) Additional Qty (d) Variation Order
(a) (b) Submitted Rejected (e)
From Client / Eng. From Main Con. From Sub. Con From Client / Eng. From
Total Received
Response Req.
Responded
Open
Area of Concerns
Lesson Learned
Admin Report
Last Month This Month
Expire / Due Received Still to Received Expire / Due Received Still to
Iqama
ATM
Insurance Card
Gate Pass
Exit / Pass /
Leave Dues
xxx
January - 2014
OF CONTENTS
ect Overview
Variance
HVAC FF PL
Remarks
Material Installation Remarks
Inspection @ Site
Plants
Plants Description Required Period Qty
Scope
Claim Certified as of
Inspection Remarks :
Scope
Claim Certified as of
Inspection Remarks :
Total
Damage Report
1,234,556
PL EL App. VO
ETC - Estimate to TCPI - To Complete
Complete Performance Index
Current Status
Remarks
Claim Certification
Recommendation
Recommendation
n Department