Project PROPOSED PUMP ROOM

Location
Client
Subject Foundation Design (Design Strips) Foundation
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 19

Assumed Soil Bearing Capacity (qa) = 120KPa

“The contractor and/or the owner must verify the assumed soil bearing capacity at their own expense by hiring
a company that specializes in soil testing. In the event that the actual qa is different from the assumed value,
the designer must be informed immediately form him to redesign the foundations based on the soil test result.”

Using Bowles Formula for Calculating Subgrade Modulus (k) :

k = 40 qa 3
k = 40 (120) 3
k = 14,400.00KN/m3

Concrete Slab Design - Punching Shear Data


Point GlobalX GlobalY Location Perimeter Depth Status Ratio
m m mm mm
1 1.00000 4.50000 Corner 1784.000 184.000 OK 0.559460
2 5.00000 4.50000 Corner 1784.000 184.000 OK 0.552954
3 1.00000 2.00000 Corner 1884.000 184.000 OK 0.728378
4 5.00000 2.00000 Corner 1884.000 184.000 OK 0.727082

Slab Properties - Solid Slabs


Slab Type MatProp Thickness Ortho
mm
F1 Footing MAT1 275.000 No
F2 Footing MAT1 275.000 No

1
Project PROPOSED PUMP ROOM
Location
Client
Subject Foundation Design (Design Strips) Foundation
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 19

ACI 318-08 Concrete Strip Design

Geometric Properties Material Properties

Combination = Overall Envelope Concrete Comp. Strength = 21 N/mm2


Strip Label = CSA1 Concrete Modulus = 21538.11 N/mm2
Length = 1.3 m Longitudinal Rebar Yield = 275.79032 N/mm2
Distance to Top Rebar Center = 83 mm
Distance to Bot Rebar Center = 83 mm

2
Project PROPOSED PUMP ROOM
Location
Client
Subject Foundation Design (Design Strips) Foundation
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 19

3
Project PROPOSED PUMP ROOM
Location
Client
Subject Foundation Design (Design Strips) Foundation
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 19

ACI 318-08 Concrete Strip Design

Geometric Properties Material Properties

Combination = Overall Envelope Concrete Comp. Strength = 21 N/mm2


Strip Label = CSA2 Concrete Modulus = 21538.11 N/mm2
Length = 1.3 m Longitudinal Rebar Yield = 275.79032 N/mm2
Distance to Top Rebar Center = 83 mm
Distance to Bot Rebar Center = 83 mm

4
Project PROPOSED PUMP ROOM
Location
Client
Subject Foundation Design (Design Strips) Foundation
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 19

5
Project PROPOSED PUMP ROOM
Location
Client
Subject Foundation Design (Design Strips) Foundation
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 19

ACI 318-08 Concrete Strip Design

Geometric Properties Material Properties

Combination = Overall Envelope Concrete Comp. Strength = 21 N/mm2


Strip Label = CSA3 Concrete Modulus = 21538.11 N/mm2
Length = 1.4 m Longitudinal Rebar Yield = 275.79032 N/mm2
Distance to Top Rebar Center = 83 mm
Distance to Bot Rebar Center = 83 mm

6
Project PROPOSED PUMP ROOM
Location
Client
Subject Foundation Design (Design Strips) Foundation
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 19

7
Project PROPOSED PUMP ROOM
Location
Client
Subject Foundation Design (Design Strips) Foundation
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 19

ACI 318-08 Concrete Strip Design

Geometric Properties Material Properties

Combination = Overall Envelope Concrete Comp. Strength = 21 N/mm2


Strip Label = CSA4 Concrete Modulus = 21538.11 N/mm2
Length = 1.4 m Longitudinal Rebar Yield = 275.79032 N/mm2
Distance to Top Rebar Center = 83 mm
Distance to Bot Rebar Center = 83 mm

8
Project PROPOSED PUMP ROOM
Location
Client
Subject Foundation Design (Design Strips) Foundation
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 19

9
Project PROPOSED PUMP ROOM
Location
Client
Subject Foundation Design (Design Strips) Foundation
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 19

ACI 318-08 Concrete Strip Design

Geometric Properties Material Properties

Combination = Overall Envelope Concrete Comp. Strength = 21 N/mm2


Strip Label = CSB1 Concrete Modulus = 21538.11 N/mm2
Length = 1.4 m Longitudinal Rebar Yield = 275.79032 N/mm2
Distance to Top Rebar Center = 99 mm
Distance to Bot Rebar Center = 99 mm

10
Project PROPOSED PUMP ROOM
Location
Client
Subject Foundation Design (Design Strips) Foundation
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 19

11
Project PROPOSED PUMP ROOM
Location
Client
Subject Foundation Design (Design Strips) Foundation
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 19

ACI 318-08 Concrete Strip Design

Geometric Properties Material Properties

Combination = Overall Envelope Concrete Comp. Strength = 21 N/mm2


Strip Label = CSB2 Concrete Modulus = 21538.11 N/mm2
Length = 1.4 m Longitudinal Rebar Yield = 275.79032 N/mm2
Distance to Top Rebar Center = 99 mm
Distance to Bot Rebar Center = 99 mm

12
Project PROPOSED PUMP ROOM
Location
Client
Subject Foundation Design (Design Strips) Foundation
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 19

13
Project PROPOSED PUMP ROOM
Location
Client
Subject Foundation Design (Design Strips) Foundation
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 19

ACI 318-08 Concrete Strip Design

Geometric Properties Material Properties

Combination = Overall Envelope Concrete Comp. Strength = 21 N/mm2


Strip Label = CSB3 Concrete Modulus = 21538.11 N/mm2
Length = 1.3 m Longitudinal Rebar Yield = 275.79032 N/mm2
Distance to Top Rebar Center = 99 mm
Distance to Bot Rebar Center = 99 mm

14
Project PROPOSED PUMP ROOM
Location
Client
Subject Foundation Design (Design Strips) Foundation
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 19

15
Project PROPOSED PUMP ROOM
Location
Client
Subject Foundation Design (Design Strips) Foundation
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 19

ACI 318-08 Concrete Strip Design

Geometric Properties Material Properties

Combination = Overall Envelope Concrete Comp. Strength = 21 N/mm2


Strip Label = CSB4 Concrete Modulus = 21538.11 N/mm2
Length = 1.3 m Longitudinal Rebar Yield = 275.79032 N/mm2
Distance to Top Rebar Center = 99 mm
Distance to Bot Rebar Center = 99 mm

16
Project PROPOSED PUMP ROOM
Location
Client
Subject Roof Slab Design (Design Strips) Slab
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 13

17
Project PROPOSED PUMP ROOM
Location
Client
Subject Roof Slab Design (Design Strips) Slab
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 13

18
Project PROPOSED PUMP ROOM
Location
Client
Subject Roof Slab Design (Design Strips) Slab
Calculated
Checked by Date Ref. No. No. of Page(s)
by
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 13