Professional Documents
Culture Documents
Quality Warrantee
Name of product Inclinometer casing (FC Type)
1. ACE INSTRUMENT CO., LTD. holds the full responsibility of our products regardless of purchasing
places and how you get it. The product passed a rigorous test and was under the quality
management by top engineers.
2. If any defects of manufacturing are found or any breakdown happens within 3 years from purchasing
date, we guarantee repair, adjustment and verification at no cost. But, when you ask repair,
adjustment and verification, ACE INSTRUMENT CO., LTD. is not responsible for shipping and
handling fees. In case the quality warrantee date has expired, or any breakdown owing to
carelessness has happened and other operations such as dealing with zero point are needed,
services would be provided at a minimum cost.
3. But, in the case the purpose of use is changed, incorrect installation, the use of components for
manufacturing and installation, and repair of other firms take place, ACE INSTRUMENT CO., LTD is
not liable to Quality warrantee.
■ Product calibration
This product is not a measuring instrument subject to calibration regulated by laws and regulations
on weighing and measurement, and because there is no national standard and verification standard,
it is impossible to calibrate at an authorized test and calibration institution delegated by the country.
Therefore, we inform you that it has been calibrated according to the inspection standards and
calibration procedures established by our company.
Contents
The type of compensation
Inspection Exchange
1. Introduction ·················································································· 2
1-1 Introduction ·················································································· 2
1-2 Features ············································································· 2
1-3 Specification ·················································································· 3
2. Installation ·················································································· 4
2-1 Precautions for installation ······················································· 4
2-2 How to install ············································································ 5
2-3 Grout mixes ······································································ 5
3. Cautions ···················································································· 7
-1
1. Introduction
1-1 Description
FC type inclinometer casing is cut 3m and it is packed 18pcs in a carton box.
It is advantages to install in shallow depth less than 20m.
It is suitable to apply at embedded into concrete, installed in borehole surrounded by rock,
installed in field which has displacement is expected, installed in area acting small
deformation and distributed load.
The extruded casing has four grooves at equal intervals of 90° inside, and is connected by a
sleeve provided and then finished with riveting and taping.
The extruded casing is a highly reliable product with a torsion angle of less than 0.5˚/3m
and a rigidity of 250kg or more that is not damaged and secures flexibility.
[ FC Casing ]
1-2 Features
■ High precision and high quality extruded casing
■ The less than 0.5˚/3m of spiral
■ Lower price
■ Easy and quick installation
-2
1. Introduction
1-3 Specification
Model FC-64 FC-70 FC-85
ID, OD Φ53.6×Φ60.6xΦ64㎜ Φ58×Φ66xΦ70㎜ Φ70.2×Φ80.8xΦ85㎜
Groove depth 57mm 62mm 76.4mm
Thickness 4.0mm (Average)
Weight 2.2㎏/3m 2.6㎏/3m 3.3㎏/3m
Spiral Less than 0.5˚/3m
Casing Cutting length 3,000mm
Load test More than 250㎏·f
Collapse
10Bar
strength
Operating
-20~60℃
temperature
Material High impact ABS resin
Material High impact ABS resin
Sleeve Dimensions Φ70x180mm Φ80x180mm Φ95x180mm
Weight 150g 240g 305g
Material High impact ABS resin
End cap Dimensions Φ69x63mm Φ75x70mm Φ90x63mm
Weight 55g 70g 75h
-3
2. Installation
② When connecting the FC casing, be sure to perform riveting and apply silicone to the
sleeve, casing contact, and riveting location for waterproofing.
Also, use OPP tape to prevent the casing from loosening.
③ When inserting the FC casing into the borehole, be sure to use a chain vise to secure the
lower casing and then connect it to complete the work without dropping the casing in the
middle of installation.
-4
2. Installation
2-2 Installation
① When drilling is completed, assemble the FC casing inside the steel casing for drilling
and start the casing installation.
② Close the bottom of the first casing with a casing cap, close the gap with silicone, and
fix it with OPP tape.
③ After inserting the first casing into the borehole, firmly fix the 50cm section of the upper
end with a chain vise and fix it over the support of the drilling machine.
④ Fasten the sleeve to the top of the first casing. Also, fasten the second casing to the
sleeve.
After riveting (4 places) at the riveting location, waterproof the rivet location and sleeve
joint with silicone.
⑤ When the silicone application is completed, use OPP tape to wrap the connection
several times to fix it once again, and at the same time prevent the silicone from being
swept away.
⑥ Repeat the above method to connect all the casings of the planned depth and insert
them into the borehole.
⑦ After making the inclinometer casing contact the bottom of the borehole, lower the tremie
pipe between the inclinometer casing and the borehole to the bottom, and spray cement
grout to fill the gap between the borehole and the inclinometer casing.
Filling the cement grout causes the inclinometer casing to rise due to buoyancy.
In this case, the inclinometer casing must be filled with water to reach the floor.
⑧ After inserting the top cap on the upper part of the inclinometer casing, remove the steel
casing for drilling.
⑨ After removing the steel casing for drilling, add enough cement grout between the
borehole of the ground and the inclinometer casing.
⑩ After cutting the inclinometer casing to an appropriate height from the ground (about
20~30cm), put on a protective cover and finish the installation.
-5
2. Installation
-6
3. Cautions
■ If the depth of installation of the casing is very deep or the size of the displacement is
expected to be very large, install a telescopic section in the middle of the casing to
absorb the displacement through the expansion of the casing to prevent damage to the
casing and sensor.
■ If the ABS casing is exposed to direct sunlight or in a hot place for a long time,
deformation or internal twisting of the casing may occur. Therefore, be sure to put it in
the packaging box and transport it in a packaged state before installation.
In addition, for long-term storage at the construction site, it must be stored in a packaged
state in a wide and flat place without sunlight.
■ When installing the casing, to maintain the strength of the joint and seal it, if possible, use
a pop rivet and ABS solvent bond to put it, apply silicone to the surface, and then wrap
the sealing tape.
-7
4. General instruments installation and operation tips
6. The use of protection tube for signal cable 13. Auto Data Acquisition System requires UPS
In the case of laying under the ground, dams, vulnerable In South Korea, relatively temporary blackout (0.5 seconds)
foundation, concrete structures can have a big displacement, is frequent. So overloading owing to simultaneous uses of
a source of signal cable disconnection. In the case of ground equipment and accumulated power cables on sites are likely
construction, given the construction condition, heavy to cause ordinary and temporary blackouts, leading to
equipment operation and frequent moving construction can be computer Down and errors of built-in software.
a source of disconnection or sensor damage. Therefore, Therefore, When Auto Data Acquisition System is operated;
caution should be taken for the protection of sensors and UPS(Uninterruptable Power Supply) must be used to minimize
signal cables. And minimize the dangerous factors by using dangerous factors.
new construction pipe for drainage system.
14. Caution for the choice of VW output unit
7. Installation of Amplifier with sensors generating mV Manufactures of VW sensors and output units usually cover
600~3,200Hz (360~10,240 10 Hz or 1666∼312 μsec) for
3 2
Engineering measuring machine generating electronic signal
has a 200-300 m transmission distance. In the case Junction possible measurement range. And they design sensors taking
Box and Terminal Box have a long distance from the into consideration the purpose of sensors, durability, and
measuring machine, an amplifier should be installed in precision. Therefore, when Mode for unit choice of output unit
proportion of measurement distance to prevent drop of voltage within this range is changed, you must select sophisticated
for sensor transmission. output unit-making measurement possible.
-8
- 19
-8