PROJECT BRIEFER

DAVAO CITY BYPASS ROAD


PROJECT BACKGROUND/ DESCRIPTION

• Riverbeds excavation
• Installation of Gabions protection works
• Construction of concrete Manhole Cover
• Construction of Curb and Gutter
• Construction of concrete Sidewalk

PROJECT IMPACT
• The project will alleviate the volume of traffic along Daang Maharlika Road, especially in Malagamot to
Panacan area.
• This project will also enhance the flow of people, goods and delivery of basic social services thereby
increasing the socio-economic activities in the area and increase production and trade volume of agri-marine
products not only within Davao City but also with the province of Davao del Norte and Davao del Sur.
• This project shall reduce travel time contributing to substantial savings for motorists and provide
convenience to the traveling public.

PROJECT IMPLEMENTATION PLAN

ALLOCATION
FUNDING PHYSICAL TARGETS/ STATUS AS OF
(MILLION
YEAR SCOPE OF WORK September 15, 2021
PESOS)
• Riverbeds excavation
• Installation of Gabions
protection works
• Construction of concrete
CY 2017 Manhole Cover 220,000 40.899%
Infra Projects • Construction of Curb and
Gutter
• Construction of concrete
Sidewalk
TOTAL FUND RELEASED
ADDITIONAL FUNDING REQUIREMENT
TOTAL PROJECT COST
CONTRACTUAL DATA

21L0-0050: Construction of Drainage Structure-Bypass Road at Malagamot Road - Jct. Mudiang Road, Phase
II, Davao City
Location: Davao City
Region: Region XI
Allocation: Php 220,000,000.00
Funding Source: DPWH 2021 Infra Projects
Implementing Office: DPWH – Regional Office XI
Contractor: Monolithic Construction and Concrete Products, Incorporated
Original Contract Amount: Php 77,859,946.99
Revised Contract Amount:
Start Date: March 28, 2021
Original Completion Date: November 26, 2021
Revised Completion Date: March 18, 2021
Actual Completion Date:
PICTURES
Contract Amount Completion Date Status as
Project
Funding Start of %
Name of Project Description / Allocation Contractor
Source Original Revised Date Original Revised Actual September Accomp.
Scope of Work
15, 2021
21L0-0050: Construction 220,000,000.00 CY 2021 77,859,946.99 Monolithic Construction March November March 18, 40.899
INFRA
of Drainage Structure- PROJECTS and Concrete Products, 28, 2021 26, 2021 2021 Suspended
Bypass Road at Incorporated
Malagamot Road - Jct.
Mudiang Road, Phase II,
Davao City