MIA Wash Bay & UG Warehouse Drainage

(Project Overview – Civil & Earthwork)

February 18th, 2024

Prepared by, Acknowledged by, Approved by,

Wandri Anggen / M. Ikhsan Yudistiro D. S / Galuh A. / Ardhiansyah F.S. P Danang S. Atmojo Fachmi Muchsin Hariadhi Anjar Kusuma
MMS Civil & Structural Engineer MMS Earthwork Engineer MMS Project Engineer MMS Project Manager HLO Dept. Head

MERDEKA MINING
MERDEKA MINING SERVICE |TUJUH
SERVIS BUKITPROJECT
TUJUH BUKIT PROJECT  2020
| 2023
Project Overview
Perimeter Drainage at MIA Wash Bay & UG Warehouse
Background
01 Run Off surrounding “MIA Wash Bay” & “UG Warehouse” directly flood the slope & became uncontrolled during heavy rain
02 Long Term uncontrolled Run Off on Slope could defect its stability
03 Perimeter Drainage required to control & divert Run Off to Drop Chute

Uncontrolled Run-Off Finding


Watershed Pattern

2
MERDEKA MINING SERVIS  TUJUH BUKIT PROJECT  2023
Project Overview
Perimeter Drainage at MIA Wash Bay & UG Warehouse
Proposed Design & Scope of Works
01 Manual Soil Cut, Rebar & Formwork Fabrication, Concrete Works
02 Open Drainage; Reinforced Concrete: M6 – 150 1 Layer, Concrete Grade f’c 15 Mpa, HDPE Pipe Drainage DN 450 with Pipe Stopper
03 Box Control 1.5 x 1.5 x 1.0 m, Reinforced Concrete: M8 – 150 1 Layer, Concrete Grade f’c 20 MPa

Cost Estimation $ 28,539.598


Duration 21 Days

3
MERDEKA MINING SERVIS  TUJUH BUKIT PROJECT  2023
Project Overview
Perimeter Drainage at MIA Wash Bay & UG Warehouse
Proposed Design

4
MERDEKA MINING SERVIS  TUJUH BUKIT PROJECT  2023
Project Overview
Perimeter Drainage at MIA Wash Bay & UG Warehouse
Pre-Construction Administration & Permit
01 Join Inspection with PIC of the area related to Existing Condition, Drainage Plan, & Safety Issues 01 Risk Assessment
02 Close Issues before Perimeter Drainage Construction started, eg: relocate Materials / Equipment, 02 Job Safety Environmental Analysis (JSEA)
Repair Existing Grading, Pipe / Cable Modification (if any) 03 Work Permit: Manual Soil Cut
03 Dense Vegetation surrounding the area require fogging to protect Construction Crew from insects

5
MERDEKA MINING SERVIS  TUJUH BUKIT PROJECT  2023
Line # Parent # Item # Description Quantity Unit Labour Material Plant Subcontract Other Rate Total
MIA Wash Bay & UG Warehouse Open
1
Drainage
2 Earthwork 594.000 m3 3,407.250 1,503.500 2,194.100 11.961 7,104.850 C
3 Concrete Works Fc 15 & 20 Mpa 87.000 m3 5,488.985 11,171.747 3.867 191.547 16,664.598 C
4 Ground Pipe Works 81.000 m 4,770.150 58.891 4,770.150 C
Total for all items 13,666.385 12,675.247 2,197.967 28,539.598
CONSTRUCTION SCHEDULE
W1 W2 W3 W4
CWO - XXX - MIA & UG WH Open Drainage

CODE TASKS DUR M T W T F S S M T W T F S S M T W T F S S M T W T F S S


ACTIVITIES 21d
*exclude CWO Approval & Expediting by SCM
Construction 21d

Rebar & Formwork Fabrication @Crusher Area 3d


Rebar Cutting & Formwork Fabrication 10d
Formwork Fabrication 10d
Mob & Assemble Safety Line 3d

Open Drainage MIA Washbay Area 100 m 12d


Soil Cut, Open Drainage 100 m & Box Control 12d
Welding Liner on Control Box 2d

Open Drainage MIA Washbay Area 125 m 16d


Soil Cut, Open Drainage 100 m & Box Control 16d
Welding Liner on Control Box 2d

HDPE Drainage & Drop Chute Box Control 9d


HDPE Fabrication for Drainage & Stopper 10d
Soil Cut & Below Ground HDPE Drainage Installation 5d
Pipe Stopper Installation 2d
Clean Up Area & Surface HDPE Drainage Installation 5d
Drop Chute Box Control 10d
Welding Liner on Control Box 2d

Structure Touch Up & Finishing 1d


Dismantle Safety Line, Finishing, House Keeping, Demob 1d

User Punchlist 1d

*Consider Weather & 1 Concrete Mixer Truck available during Construction; 15 - 25 m3/Day Prepared by, Acknowledged by, Approved by,

Wandrianto S. Anggen Danang Sugi Atmojo Fachmi Muchsin


Civil & Structural Engineer Project Engineer Project Manager
16 Feb 2024

FOR CONSTRUCTION
300
1000
1000 mm

1000
1000 mm

Dimension Fit to Existing


Drop Chute Inlet

100 mm thk

1000 mm 1000 mm 1000 mm


Cross Rebar for Circle Opening *typ
16 Feb 2024

Stud Liner On Wall Opening


& Liner Patch to prevent
1000 mm Leaking *typ

FOR CONSTRUCTION