Wandri Anggen / M. Ikhsan Yudistiro D. S / Galuh A. / Ardhiansyah F.S. P Danang S. Atmojo Fachmi Muchsin Hariadhi Anjar Kusuma
MMS Civil & Structural Engineer MMS Earthwork Engineer MMS Project Engineer MMS Project Manager HLO Dept. Head
MERDEKA MINING
MERDEKA MINING SERVICE |TUJUH
SERVIS BUKITPROJECT
TUJUH BUKIT PROJECT 2020
| 2023
Project Overview
Perimeter Drainage at MIA Wash Bay & UG Warehouse
Background
01 Run Off surrounding “MIA Wash Bay” & “UG Warehouse” directly flood the slope & became uncontrolled during heavy rain
02 Long Term uncontrolled Run Off on Slope could defect its stability
03 Perimeter Drainage required to control & divert Run Off to Drop Chute
2
MERDEKA MINING SERVIS TUJUH BUKIT PROJECT 2023
Project Overview
Perimeter Drainage at MIA Wash Bay & UG Warehouse
Proposed Design & Scope of Works
01 Manual Soil Cut, Rebar & Formwork Fabrication, Concrete Works
02 Open Drainage; Reinforced Concrete: M6 – 150 1 Layer, Concrete Grade f’c 15 Mpa, HDPE Pipe Drainage DN 450 with Pipe Stopper
03 Box Control 1.5 x 1.5 x 1.0 m, Reinforced Concrete: M8 – 150 1 Layer, Concrete Grade f’c 20 MPa
3
MERDEKA MINING SERVIS TUJUH BUKIT PROJECT 2023
Project Overview
Perimeter Drainage at MIA Wash Bay & UG Warehouse
Proposed Design
4
MERDEKA MINING SERVIS TUJUH BUKIT PROJECT 2023
Project Overview
Perimeter Drainage at MIA Wash Bay & UG Warehouse
Pre-Construction Administration & Permit
01 Join Inspection with PIC of the area related to Existing Condition, Drainage Plan, & Safety Issues 01 Risk Assessment
02 Close Issues before Perimeter Drainage Construction started, eg: relocate Materials / Equipment, 02 Job Safety Environmental Analysis (JSEA)
Repair Existing Grading, Pipe / Cable Modification (if any) 03 Work Permit: Manual Soil Cut
03 Dense Vegetation surrounding the area require fogging to protect Construction Crew from insects
5
MERDEKA MINING SERVIS TUJUH BUKIT PROJECT 2023
Line # Parent # Item # Description Quantity Unit Labour Material Plant Subcontract Other Rate Total
MIA Wash Bay & UG Warehouse Open
1
Drainage
2 Earthwork 594.000 m3 3,407.250 1,503.500 2,194.100 11.961 7,104.850 C
3 Concrete Works Fc 15 & 20 Mpa 87.000 m3 5,488.985 11,171.747 3.867 191.547 16,664.598 C
4 Ground Pipe Works 81.000 m 4,770.150 58.891 4,770.150 C
Total for all items 13,666.385 12,675.247 2,197.967 28,539.598
CONSTRUCTION SCHEDULE
W1 W2 W3 W4
CWO - XXX - MIA & UG WH Open Drainage
User Punchlist 1d
*Consider Weather & 1 Concrete Mixer Truck available during Construction; 15 - 25 m3/Day Prepared by, Acknowledged by, Approved by,
FOR CONSTRUCTION
300
1000
1000 mm
1000
1000 mm
100 mm thk
FOR CONSTRUCTION