PROJECT -NCRU(JAMALPUR)

Name of Work :- Design Calculation of Rain Water Harvesting

S.No Description Total area Unit

1 Area Details
a Total Plot Area 58998.00 M2
b Roof Area 14123.00 M2
c Road & Paved Area 44375.00 M2
d Green Area 500.00 M2

2 Design Parameters
a Design Parameters 50 mm/hr
b Run-off Co-efficients Considered for:-
i Roof Area 0.9
ii Road & Paved Area 0.7
iii Green Area 0.4

3 Rainfall Discharge
a Roof Area 635.54 M3
b Road & Paved Area 1553.13 M3
c Green Area 10.00 M3
d Total Rainfall Discharge 2198.66 M3

4 Retention Time Considered 15 Minutes

5 Total Run off Discharge for Rain Water Harvesting 549.67 M3

6 Size of Rain Water Harvesting Structure


a Length 6 Mtr
b Width 1.5 Mtr
c Depth 3

7 Holding Capacity Rain Water Harvesting Structure 27 M3

9 Total Capacity of Rain Water Harvesting Structure 20.357962962963 M3

10 No.of Rain Water Harvesting Pit Required 20.00 Nos