AMAZON - NCRU

Supplier Wise Status of Key Components


Vendor committed Deliver dates

Vendor Activity PO Ststus Lot1 Lot 2

Rishi Specialised Fabrication - Laser cutting & Bending Partly 30-Mar 12-Apr

Roechling Supplier of Wear Strips Ordered 25-Feb 5-Apr

Maan Supplier of Al. Extruded Parts Ordered 1-Mar


FORBO Modular Plactic Belting Ordered 25-Mar 15-Apr
Suprathane PU Coated Articles Ordered 16-Apr

Palak General Fabricated articles - Shafts & Rollers Partly 15-Apr 25-Apr

Forming India Fabrication of Linear Side Tracks (channels) Ordered 2-Apr

PURI Supplier of Seamless pipes Ordered 10-Apr

LPM Hebbasit PVC Belting Ordered 12-Mar

ARMES Linear cum Guide track for PVC belting Ordered 25-Feb
AMAN METAL Bearing Mounting bracket Partly 1-Apr 15-Apr
SEW Euro Drive Geared Motor Ordered 25-Apr
Interroll Rollers Ordered 5-Apr
These are available ex. Stock or within
Misc Fastners, Hilti bolts,etc.. Partly and all pending task in this regard will
week.
Electrical Control Elements
Siemens PLCs, HMIs & Drives Ordered 8-Apr
Rittal Panels & AC unit Ordered 18-Apr
These are available ex. Stock or within
Misc Sensors, Switchgears, Line Chokes, Cabel Trays, Etc.. Partly and all pending task in this regard will
week.
SORT SLIDE
Hevins Structural,fabrication parts Ordered 14-Apr 22-Apr
Festo Pneumatic items Ordered 10-Apr
mmitted Deliver dates Receipt of Articles @ Addverb

Lot 3 Lot1 Lot 2 Lot 3 Status as on 29th Mar'19

22-Feb 1st lot received

2-Mar Received
20-Mar S9,Z11 POM belt received

10-Mar Clipper belt received

26-Feb Received

In transit
vailable ex. Stock or within 2 weeks of placing order Received bearings from Ashoka
ding task in this regard will be completed by end of this sales agency.
Received fastners from Hilti

In transit

vailable ex. Stock or within 2 weeks of placing order


ding task in this regard will be completed by end of this

1st lot expected by 14th Apr


Expected by 10th Apr'19