1 2 3 4 5 6 7 8 9
1 Stone for hard core of gauge 03059 CUM 11.80 528.70 6237.15 600.00 7078.29
n. exc 63 mm
2 Chlorophyriphos (ATT 03063 LTR 450.58 305.50 137652.04 240.00 108139.08
Chemical)
3 Aggregate
(i) 40mm graded 04093 Cum 105.56 587.50 62018.19 700.00 73894.01
(ii) 20mm graded 04093 Cum 389.23 646.30 251561.25 750.00 291924.71
(iii) 12.50mm graded 04093 Cum 0.00 675.00 0.00 800.00 0.00
4 Sand for concrete/masonry/ 04095 Cum 310.14 646.30 200443.84 700.00 217098.39
5 Sand for plastering 14079 Cum 81.10 705.00 57174.47 750.00 60823.91
6 Cement 04098 Bag 4470.01 270.30 1208243.21 240.00 1072801.97
7 Bricks for masonry `06129 1000N 76.22 2300.00 175309.54 3500.00 266775.39
8 TMT bars 10110 Kg 66976.92 41.10 2752751.27 43.00 2880007.41
9 Binding wire 10114 KG 865.01 56.40 48786.39 60.00 51900.41
10 Primer for roof treatment 11151 Ltr 302.43 47.00 14214.10 50.00 15121.39
15 Mineral colour 15015 Kg 0.25 52.9 13.33 70 17.64
16 Slaked Lime 04097 Kg 187.14 4.31 806.57 9 1684.24956
17 Glue Assessed Kg 0.49 85 41.43 85 41.4330035
18 Blue Assessed Kg 0.53 90 48.12 90 48.121416
23 Factory made Panelled door 08020 Sqm 44.28 1460.50 64670.94 1150.00 50922.00
shutter
25 Door stopper with hinge 09149, 51 Each 37.00 21.20 784.40 25.00 925.00
26 Pressed steel frames of size 10082,83 Rm 109.00 229.10 24971.90 330.00 35970.00
105x60mm
28 Aluminium barrel bolt ;09004, 9 Each 57 35.70 2034.90 55.00 3135.00
200mm long
30 MS Butt hinge 100 mm 09028. 56 Each 45 10.60 477.00 16.00 720.00
31 Aluminium handle 150mm 09083, 85 Each 57 25.80 1470.60 40.00 2280.00
33 Steel window with side 10071 Sqm 53.64 1269.00 68069.16 1200.00 64368.00
hungshutter & glazing bar
36 20 to 25 mm thick kota stone 13013 Sqm 1423.16 316.10 449861.81 275.00 391369.81
slab machine cut & polished
Srl No Description of Item SSR No Unit Qty At par SSR 2010 As per Market
Rate Amount Rate Amount
1 Formwork to side of concrete 605'07004 Sqm 228.95 134.2 30724.82 200.00 45789.60
foundation, footing, base of
column, sides & sofits of plinth
beams
Srl Description of Item SSR No Unit Qty As per SSR 2010 As per Market
No
Rate Amount Labour Rate of Market Amount
factor Mazdoor Rate
3 Excavation in trenches
n. exc 1.5 m wide &
n.exc 1.5 m deep and
getting out in any type 03006 Cum 760.89 115.20 87654.25 0.55 200.00 110.00 83697.64
of soil
4 Returning , filling in
trenches incl well 03009 Cum 423.27 41.70 17650.49 0.21 200.00 42.00 17777.47
ramming with moorum
5 Filling under floor 03017, 18 Cum 162.09 51.70 8380.17 0.35 200.00 70.00 11346.46
156502.85 155999.32
MARKET VARIATION ON LABOURS Annexure -V
Srl No Description of Item Unit Qty As per SSR 2010 As per Market
Rate Amount Rate Amount
9011.59
Total Qty. 450.58
= 450.58 Litres
2 RCC M-25(design mix) other than pile
19.99
(a) Cement @ 9.01 Kg/ cum. = 180.06 Kg
(b) Sand @ 0.0263 Cum/ cum = 0.53 Cum
(c) Bricks @ 56.00 Nos/ Sqm. = 1119 Nos
1293.7845
Qty =
= 1293.78 Sqm
12 15MM THICK EXTERNAL PLASTER IN TWO COATS, 10MM IN CM 1:6 & 5MM IN CM 1:4 ON BRICK
WALLS
42 Keyed pointing in cement san sqm. 747.612
mortar 1:3 using grey cement on
external stone masonry surfaces
finished even and smooth
without using extra cement.
747.612
(a) Cement @ 6.97 Kg/ Sqm. = 5210.86 Kg
(b) Sand @ 0.025 Cum/ Sqm. = 18.40 Cum
1388.488
21 TWO COAT OF OIL BOUND DISTEMPER OVER A COAT OF ALKALI RESISTANT PRIMER
1293.78 129.38 X Sqm
=
TWO COATS OF SYNTHETIC ENAMEL PAINT OVER ZINC CHROME PRIMER ON STEEL SURFACE
Qty
53.64 Sqm = 5.36 X Sqm
(a) Zinc Chrome Primer @ 0.50 Ltr/ X Sqm. = 2.68 Ltr
(b) Paint @ 0.90 Ltr/ X Sqm. = 4.83 Ltr
Yard Stick
Schedule 'A' Part - I, Sl Item No. 10 (Storage Accn)
CA No. : ……………………………………..
Name of Work : Provn of OTM Accn & Balance Work at Jaisalmer
Name of Contractor : ……………………………………………
Beams, RCC slab including reinforcement, form work, RCC M-25 complete.
4 Stage - IV : Door Windows
Flat Iron at junction of wall and column, Door Shutters, Windows, Aluminium Doors
0.00
Contractor
GE Project Jaisalmer
Approved
% age Yard Stick
Approved
Yard Stick
Schedule 'A' Part - I, Sl Item No. 10 (Storage Accn)
CA No. : ……………………………………………
Name of Work : Provn of OTM Accn & Balance Work at Jaisalmer
Name of Contractor : ……………………………….
% age
S. Stage Amount % age
No. Stage of Works as per Estimate Calculated Recommended
by GE
I Stage - I upto Plinth Level
Surface dressing, excavation, RCC foottings including
steel reinforcement, form work, RCC M-25, PCC 1:4:8
as in foundation column reinfofrcement upto roof
4187571.55 51.19 49.50
level, form work & RCC M-25 upto Plinth level, return
filling in foundation, & back filling under floor
complete upto plinth level including ATT.
II Stage - II : Plinth level to Lintel Level
Column RCC M-25, Form work upto lintel level, Stone
409194.83 5.00 5.00
masonary, Lintel Beams complete upto lintel level.
III Stage - III : Lintel Level to First Floor Slab Level
Column formwork & RCC M-25 lintel level to roof
level, Stone masonary, Floor Slab Beams, RCC slab
2015570.06 24.64 25.00
including reinforcement, form work, RCC M-25
complete.
IV Stage - IV : Door Windows
Flat Iron at junction of wall and column, Door
Shutters, Windows, Aluminium Doors etc complete 248182.01 3.03 3.00
including Iron Morgi.
V Stage - V : Plaster work
Plaster to internal surface of walls, ceilling and keyed
216511.52 2.65 2.50
pointing to external surfaces of walls etc.
VI Stage - VI : Surface finishes
Painting work for internal, external, ceilling newly
81435.57 1.00 1.00
plastered surfaces, steel and wooden surfaces
VII Stage - VII : Florring
PCC florring, sub base to floors, Non Skid Tiles, Kota
Stone, and Interlocking Tiles floor including skirting to 561547.24 6.86 6.50
floor, filling under floor and ATT complete
IX Stage - IX : Plinth Protection to building
PCC 1:3:6 type C1, plinth protection including ATT,
53307.49 0.65 0.50
hard core etc. complete
X Stage - X : Roof Treatment
Roof treatment complete 364257.39 4.45 4.00
XI Stage - XI : Misc Items
Site clearance, RCC Chatri, built in furniture, RCC jalli
42422.36 0.52 3.00
etc.
Total Amount of the Building 8180000.00 100.00 100.00
Contractor
Approved
Abstract of Quantities for Block of Storage Accn
For Provn of OTM Accn & Balance Work at Jaisalmer
Cost as Per SSR 2010
COST AS PER SSR 2010 (Upto PL) 4187571.55
COST AS PER SSR 2010 (Above PL) 3992428.45
Total Cost of the Block 8180000.00
26 PCC 1:3:6 filling in Factory made pressed steel Cum. 0.69 4025 2579.00
sheet 1.25 mm thick single rebate door frames.
27 Tie bars in door frames Rm. 23.40 0 80.00
28 Taring to door frames in contact of wall/ columns Rm. 109.60 0 100.00
Plain framed, pannelled shutter (One Panal) with
lock rail and panel of 9 mm B.W.P. commercial ply
or 12 mm veveered on both faces. The size of rail
29 Sqm. 44.28 8021 1436.10
and stile as per IS 1003 (Part I), klin seasoned and
chemically pressure treated in second class hard
word rail and style of 35 mm thick.
31 200 mm long 10 mm dia tower bolt Nos. 57.00 9004 52.80
32 125 mm long D- type handle with 32 x 3 plate Nos. 57.00 965 31.03
33 Wooden door stopper with 50 mm butt hinge Nos. 37.00 LS 75.00
34 Factory Fixed Glazed Windows Sqm. 53.64 10070 1335.80
35 4 mm thick glass pan sheet for steel windows Sqm. 48.28 16006 470.50
36 Factory Made fly proof steel windows Sqm. 20.16 10070 1335.80
37 Wire mesh for steel windows & doors Sqm. 18.14 9164 248.50
Supply and fixing factory made solid PVC moulded
door shutter, 28 to 30 mm thick (stiles), with 2,4
or 6 raised panel design with 2 mm thick moulded
38 Sqm. 1.58 8101 2421.30
PVC sheet on the front face & 2 mm plain colour
PVC sheet on back face face, suppling and fixing in
frame at site as per specification and drawings.
Supply and fixing of solid PVC door frame of size
50 mm x 47 mm made ouit of 5 mm plain colour
39 PVC sheet reinforced with MS square tube, Rm. 5.03 8095 335.30
suppling and fixinx in opening as per specification
and drawing.
Total Stage - VI
10 mm thick rendering on fair faces of brick work
or concrete surfaces in cement sand mortar 1:6 as 14001,
41 sqm. 1293.78 89.80
in internal surfaces of walls finished fair even and 14005
110822.90
5718.72
352062.69
173062.19
137805.70
17650.49
39026.63
5170.75
30724.82
650465.21
48967.46
226873.57
673277.18
100475.15
66561.68
103800.84
412869.76
233174.44
220829.26
58135.78
171414.92
57623.56
113157.87
123167.89
54732.09
4187571.55
62124.24
96880.79
244874.18
3675.00
1640.63
409194.83
23666.38
36906.97
120639.70
3561.71
857.50
74546.66
219802.87
128407.29
202483.05
190268.97
152293.96
407197.32
454937.70
2015570.06
31130.40
1771.00
1872.00
10960.00
63590.51
3009.60
1768.71
2775.00
71652.31
22713.86
26929.73
4508.78
3813.55
1686.56
248182.01
116181.85
33694.87
66634.79
216511.52
8488.08
39460.43
23699.30
3121.85
6665.91
81435.57
359945.25
117909.64
53874.81
29817.54
561547.24
20550.25
10056.78
12074.28
10626.17
53307.49
97904.97
43203.96
33843.10
123707.34
65598.01
364257.39
375.00
2149.50
8000.00
20363.19
11534.67
42422.36
Estimate of Quantities for Block of Storage Accn
For Provn of OTM Accn & Balance Work at Jaisalmer
Item No. 1
Surface excavation not exceeding 30 cm deep and average 15 cm deep and getting out in any type of soil.
Item No.2
Excavation in trenches, not exceeding 1.50 meter wide and not exceeding 1.50 meter in depth, for
foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 square meter on
plan and not exceeding 1.50 meter in depth and getting out in soft/ disintegrated rock soil.
Item No.3
Excavation in trenches, exceeding 1.50 meter wide and not exceeding 3.00 meter in depth, for foundation,
etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 square meter on plan and not
exceeding 3.00 meter in depth and getting out in soft/ disintegrated rock soil.
Material and labour for Cement concrete in foundations, filling and mass concrete type D2 1:4:8 using 40
mm graded stone aggregate including compaction of concrete, curing etc. complete.
Item No. 5
Returning filling in, including spreading, levelling, watering and well ramming in layers not exc. 25 cm in soft/
loose soil.
Item No. 6
Treating the back fill in contact with foundation at the rate of 7.5 liter of emulsion per square meter of
vertical surface (Area of the sub structure in contact with back fill to be measured).
Item No. 7
Material and labour for sand filling under floors or in foundation including watering and
consolidation etc complete.
Total 841320.05
B/f 841320.05
Item No. 8
Total 2572103.46
B/f 2572103.46
Item No. 9
RCC Columns upto plinth level and errection of steel upto first floor slab level
B/f 2572103.46
Summary of RCC Columns
Item S.I. Rate Amount
10 mm dia stripps Kg 8307.24 10036 49.70 412869.76
16 mm dia Kg 4797.83 10034 48.60 233174.44
20 mm dia Kg 4543.81 10034 48.60 220829.26
Form work sqm. 276.08 7014 241.10 66561.68
RCC M-25 cum. 24.96 4058 4159.00 103800.84
Total 1037235.99
B/f 4187571.55
Summary of RCC Columns
Item Unit Qty. S.I. Rate Amount
Form work sqm. 257.67 7014 241.10 62124.24
RCC M-25 cum. 23.29 4058 4159.00 96880.79
Total 159005.02
Total C/o 4346576.57
Item No. 13
B/f 4346576.57
Brick work with Fly Ash Bricks, straight or curved on plan exceeding 6 meter mean radius built in cement sand
mortar 1:6 including curing, racking of joints etc. complete in all respect.
Item No. 15
Half brick wall masonaery in cement sand mortar in CM 1:4 in sub class 'B' Bricks old size with fly ash bricks in
super structure
Total 13.13
Qty. S.I. Rate Amount
13.13 5005 280.00 3675.00
Item No. 16
B/f 4596766.38
Summary of RCC Columns
Item S.I. Rate Amount
Form work sqm. 98.16 7014 241.10 23666.38
RCC M-25 cum. 8.87 4058 4159.00 36906.97
Total 60573.34
C/o 4657339.72
Item No. 18
B/f 4657339.72
Brick work with Fly Ash Bricks, straight or curved on plan exceeding 6 meter mean radius built in cement sand
mortar 1:6 including curing, racking of joints etc. complete in all respect.
Item No. 20
Half brick wall masonaery in cement sand mortar in CM 1:4 in sub class 'B' Bricks old size with fly ash bricks in
super structure
Item No. 21
(C) Steel
Item No. 24
Factory made pressed steel frames for doors with one or more rebates including necessory fixing lugs,
hinges, lock strike plate, etc. complete, as specified supplied and fixed of size 105 x 60 mm
Item No. 26
PCC 1:3:6 filling in Factory made pressed steel sheet 1.25 mm thick single rebate door frames.
1 109.00 0.105 0.06 cum. 0.69
S.I. Rate Amount
0.69 4025 2579.00 1771.00
Item No. 27
Tie bars in door frames
Item No. 28
Plain framed, pannelled shutter (One Panal) with lock rail and panel of 9 mm B.W.P. commercial ply
or 12 mm veveered on both faces. The size of rail and stile as per IS 1003 (Part I), klin seasoned and
chemically pressure treated in second class hard word rail and style of 35 mm thick.
Item No. 31
Item No. 32
Item No. 33
PD10B 3 1 = 3 No's
PD12B 17 2 = 34 No's
Qty. S.I. Rate Amount
37 LS 75.00 2775.00
Item No. 34
Item No. 35
Item No. 36
Item No. 37
Item No. 38
Supply and fixing factory made solid PVC moulded door shutter, 28 to 30 mm thick (stiles), with 2,4
or 6 raised panel design with 2 mm thick moulded PVC sheet on the front face & 2 mm plain colour
PVC sheet on back face face, suppling and fixing in frame at site as per specification and drawings.
Item No. 39
Supply and fixing of solid PVC door frame of size 50 mm x 47 mm made ouit of 5 mm plain colour
PVC sheet reinforced with MS square tube, suppling and fixinx in opening as per specification and
drawing.
Item No. 44
Preperation of surfaces and applying three coats of White Wash to exposed RCC surfaces
Item No. 45
Preperation of surfaces and applying two coats of Oil Bound Distemper to internal surfaces of walls
Area of internal plaster except area of White wash
15001, 15003,
1293.78 15009 30.50 39460.43
Item No. 46
Preperation of surfaces and applying two coats of cement base paint to external surfaces of walls
Area of external Plaster
Qty. S.I. Rate Amount
747.61 15001, 31.70 23699.30
15010
Item No. 47
Preperation of surfaces and applying two coats of synthetic enamal paint over a coat of red oxide
primer to steel surfaces
2 53.64 0.50 53.64 Glazed Steel Windows
Qty. S.I. Rate Amount
53.64 17029 58.20 3121.85
Item No. 48
Preperation of surfaces and applying two coats of synthetic enamal paint over a coat of pink primer to
wooden surfaces
2 44.28 1.30 115.13 Pannelled Doors
Qty. S.I. Rate Amount
115.13 17001 57.90 6665.91
Item No. 49
20 to 25 mm thick mirror polish kota stone as in flooring over 20 mm thick bedding layer in cement sand
mortar 1:3 over base as specified including cutting polishing etc complete (Sub Base 75 mm thick).
Item No. 52
75 mm thick PCC 1:4:8 using 40 mm graded stone aggregate as in sub base under floor over rammed
earth
668.42
668.42 S.I. Rate Amount
13035 176.40 117909.64
Item No. 54
Material and labour for treating the top surface of filled earth at the rate of 5 liters of emulsion per
square meter of surface.
Material and labour for anti termite treatment along the external wall below concrete or masonary
apron using chemical emulsion @ 2.25 liter per linear meter including drilling and plugging holes etc in
apron.
Area of sub base under floor
560.48
3053 53.20 29817.54
Total 7720012.77
B/f 7,720,012.77
Item No. 70
50 mm thick PCC 1:3:6 as in plinth protection over 75 mm thick brocken stone aggregate hard
core over rammed earth.
Item No. 71
Material and labour for treating the soil under plinth protection at the rate of 5 liter of
emulsion per square meter of surface area.
Item No. 72
Material and labour for anti termite treatment along the external wall below concrete or
masonary apron using chemical emulsion @ 2.25 liter per linear meter including drilling and
plugging holes etc in apron.
Aluminium paint @0.11 Kg/ sqm. Over a layer of 3 mm thick APP membrane sheet over a coat of bitumen
primer @ 0.40 Ltr/ Sqm. Over a coat of plaster in cement sand mortar 1:4, 10 mm thick over RCC slab.
Item No. 74
Fan Hooks
Item No. 75
Item No. 76
Item No. 81
Providing and fixing 20 to 25 mm thick polished Kota Ston as in cill (Single piece to full length and width)
over a 15 mm thick bedding layer in cement sand mortar 1:4.
Total 8180000.00