4 BORED PILE: 450 MM DIA (Empty Boring) M 82.40 513.00 42,271.20 82.40 42271.20 0.00 0.00 82.400 42271.20
5 BORED PILE: 500 MM DIA (Empty Boring) M 644.78 549.00 353,984.22 392.22 215326.58 32.40 17787.60 424.616 233114.18
BORED PILE DIA: 500MM : FINE SAND (YELLOW)
6 WILL BE ARRANGED BY CONTRACTOR. Cum 103.40 1,860.00 192,324.00 53.44 99402.05 3.61 6710.95 57.050 106113.00
13 Supplying, laying, and making main access road with Sqm 250.00 351.00 87,750.00 250.00 87750.00 83.30 29238.30 333.300 116988.30
building Rubbish complete with levelling by JCB &
necessary labour etc. all complete as per direction of EIC.
Extra iTem
17 Moblisation charges for Extra Longer casing No 2.00 4,000.00 8,000.00 0.00 0.00 2.00 8000.00 2.000 8000.00
Ideal Labour charges Head 6.00 750.00 4,500.00 0.00 0.00 6.00 4500.00 6.000 4500.00
Hours 4.50 850.00 3,825.00 0.00 0.00 4.50 3825.00 4.500 3825.00
Hire Chages of JCB
Extra Concrete CuM 5.37 6,930.00 37,214.10 0.00 0.00 5.37 37214.10 5.370 37214.10