You are on page 1of 14

Measurement Sheet

Sl. Height
Breadth
No. Description Unit No Length(M) Total QTY REMARKS.
(M)
(M)
Shuttering 1st RA BILL
Main Building
SW1 to C8 3rd lift Sq m 1 24.6 1.150 28.290
C3 column C8 Sq m 2 4.95 1.300 12.870
C3 COolumn Sq m 1 1.95 0.950 1.853
Admin Block Sq m 0.000
1 st tank wall inside Sq m 1 15.84 1.875 29.700
1st tank wall outside Sq m 1 17.84 2.075 37.018
1st tank slab Sq m 1 3.7 4.220 15.614
2nd & 3rd tank wall inside Sq m 2 18.19 1.875 68.212
3rd & 3rd tank wall outside Sq m 2 20.19 2.075 83.789
3rd & 3rd tank slab Sq m 2 5.395 3.700 39.923
Deduction Sq m -3 0.7 0.700 -1.470
C1, C2 Pilecap Sq m 2 6.4 0.900 11.520
C5, C12 Pilecap Sq m 2 11.396 1.050 23.932
C8 Pilecap Sq m 1 12.2 1.100 13.420
C4 Pilecap Sq m 1 7.7 0.950 7.315
C7, C10 Pilecap Sq m 1 8.598 0.300 2.579
Lift raft Sq m 1 5.884 0.250 1.471
Lift wall inside Sq m 1 7.900 1.800 14.220
Lift wall outside Sq m 1 9.900 1.800 17.820
Total= 408.0755
2nd RA BILL
Shuttering
Admin Block
4 th tank raft cu m 1 14.8 0.250 3.700
tank wall cu m 1 33.6 2.075 69.720
,, cu m -1 16 0.200 -3.200
tank slab cu m 1 4.2 3.700 15.540
sump raft cu m 1 3.4 0.250 0.850
sump wall cu m 1 3.6 0.800 2.880
,, cu m 1 2.8 1.050 2.940
C11, C14, C15, C16, C3 column pile cap cu m 5 6.4 0.900 28.800
C6, C9, C13 column pile cap cu m 3 7.7 0.950 21.945
Tie beam C1-C14 cu m 2 21.05 0.500 21.050
Tie beam C2-C15 cu m 2 21.1 0.500 21.100
Tie beam C3-c16 cu m 2 22.15 0.500 22.150
Tie beam C4-C6 cu m 2 11.45 0.500 11.450
Tie Beam C11-C13 cu m 2 11.45 0.500 11.450
Tie beam C14-C6 cu m 2 10.35 0.500 10.350
Tie beam C1-C3 cu m 2 10.35 0.500 10.350
Tie beam C8-C9 cu m 2 6.8 0.500 6.800
Tie beam Lift- TB-2 cu m 4 2.1 0.500 4.200
Tie beam stair cu m 2 4.6 0.500 4.600
Column C1,C2,C3,C11,C14.C5,C16 cu m 7 1.900 2.400 31.920
C4,C6,C9,C13 column cu m 4 1.600 2.400 15.360
C7,C10 column cu m 2 2.000 2.400 9.600
C5,C12 column cu m 2 1.900 2.400 9.120
C8 column cu m 1 2.200 2.400 5.280
Main Building

SW1 column Sq m 1 6.1 0.700 4.270


C6,C7 column Sq m 2 2.9 1.600 9.280
SC1 column Sq m 2 2 1.600 6.400
C11 column Sq m 1 2.3 1.700 3.910
C15 column Sq m 1 2.3 1.700 3.910
C19 column Sq m 1 2.1 0.700 1.470
GBY-7-3/4 Sq m 1 9.5 1.300 12.350
GBY-7/2 Sq m 1 5 1.300 6.500
GBY-7/1 Sq m 1 4.55 1.300 5.915
GBX-4A Sq m 2 4 1.050 8.400
GBY8-2/3 Sq m 1 9.5 1.200 11.400
GBX-1 Sq m 1 2.25 1.025 2.306
GBX-2/3 Sq m 1 2.25 1.200 2.700
GBX-4/4 Sq m 1 2.25 1.300 2.925
GBX-6 Sq m 1 2.25 1.100 2.475
GBX-5/4 Sq m 1 2.25 1.125 2.531
SLAB A Sq m 1 2.4 2.200 5.280
SLAB-B Sq m 1 2.25 5.000 11.250
SLAB-C Sq m 1 6.55 6.000 39.300
SLAB-E Sq m 1 4.95 2.200 10.890
DEDUCTION Sq m -1 3.15 1.050 -3.308
DEDUCTION Sq m -1 2.1 0.750 -1.575
Slab side Sq m 1 4.2 0.125 0.525
STAIR SIDE WALL Sq m 1 2.53 1.400 3.542
,, Sq m 2 2 0.500 2.000
STEP PORTION Sq m 1 2.1 0.600 1.260
STEPS Sq m 1.5 2.1 0.150 0.473
Total = 494.335
Measurement Sheet
Sl. Height
Breadth
No. Description Unit No Length(M) Total QTY REMARKS.
(M)
(M)
3rd RA Bill MAIN BULDING
SW1 column Sq m 1 6.1 2.400 14.640
C3 column Sq m 1 2.2 2.400 5.280
C6,C7 column Sq m 2 2.9 2.400 13.920
C8 column Sq m 1 2.2 2.400 5.280
C11 column Sq m 1 2.3 2.400 5.520
C12 column Sq m 1 2.2 2.400 5.280
C15 column Sq m 1 2.3 2.400 5.520
C16 column Sq m 1 2.3 2.400 5.520
C19 column Sq m 1 2.1 2.400 5.040
C20 column Sq m 1 2.2 2.400 5.280
Sump inside Sq m 1 12 0.700 8.400
Sump outside Sq m 1 14.4 0.700 10.080
ADMIN Sq m
1st to 2nd floor Column
Sq m 7 1.900 2.400 31.920
C1,C2,C3,C11,C14.C5,C16
C4,C6,C9,C13 column Sq m 4 1.600 2.400 15.360
C7,C10 column Sq m 2 2.000 2.400 9.600
C5,C12 column Sq m 2 1.900 2.400 9.120
C8 column Sq m 1 2.200 2.400 5.280
1st floor slab soffit A Sq m 1 2.400 1.800 4.320
Slab soffit B Sq m 1 4.800 4.650 22.320
Slab soffit C Sq m 1 5.000 3.800 19.000
Slab soffit D Sq m 1 6.175 2.250 13.894
Slab soffit E Sq m 1 6.175 2.250 13.894
Beam 1BX-1/1 (200x600) Sq m 1 3.800 1.400 5.320
1BX-1/2 - (200x600) Sq m 1 6.750 1.400 9.450
1BX-2/1 -(250x500) Sq m 1 4.650 1.200 5.580
1BX -2/2 (300x600) Sq m 1 7.000 1.500 10.500
Deduction Sq m -1 2.250 0.110 -0.248
1BX-3 (250x550) Sq m 1 4.550 1.200 5.460
1BX-5 (250X600) Sq m 1 4.550 1.300 5.915
Deduction Sq m -2 2.400 0.110 -0.528
1BX-4(300x600) Sq m 1 7.000 1.500 10.500
Deduction Sq m -2 2.250 0.110 -0.495
1BX 6/1( .25X550) Sq m 1 4.800 1.050 5.040
1BX 6/2 (300x600) Sq m 1 7.000 1.500 10.500
Deduction Sq m -1 2.250 0.110 -0.248
1BX 7/1 (200x600) Sq m 1 3.800 1.250 4.750
1BX 7/2 (200x600) Sq m 1 6.750 1.400 9.450
1BY-1A(250x550) Sq m 1 5.000 1.350 6.750
1BY-1/3 (250x550) Sq m 1 1.300 1.350 1.755
1BY-1/2 (250X550) Sq m 1 4.400 1.200 5.280
1BY-1/1 (250x550) Sq m 1 5.000 1.200 6.000
1by 3/4 (250x550) Sq m 1 5.000 1.350 6.750
1BY 3/3 (250X550) Sq m 1 5.450 1.240 6.758
deduction Sqm -1 2.000 0.150 -0.300
1BY 3/2 (.25X.55) Sq m 1 5.850 1.090 6.377
1BY-3/1 (250X5550) Sq m 1 5.000 1.200 6.000
1BY-2(250X400) Sq m 1 1.800 0.940 1.692
1BY 3A/2/1 (250X5550) Sq m 2 6.175 1.240 15.314
1BY -4/4 (250x550) Sq m 1 5.000 1.350 6.750
1BY-4/3(250x550) Sq m 1 6.175 1.350 8.336
1BY-4/2 (250X550) Sq m 1 6.175 1.350 8.336
1BY-4/1 (250x550) Sq m 1 5.000 1.350 6.750
2nd floor slab Sq m
Slab soffit A Sq m 1 2.400 1.800 4.320
Slab soffit B Sq m 1 4.800 2.050 9.840
Slab soffit C Sq m 1 4.800 2.350 11.280
Slab soffit D Sq m 1 4.800 2.300 11.040
Slab soffit E Sq m 1 4.800 2.450 11.760
Slab soffit F Sq m 1 7.250 5.000 36.250
Slab soffit G Sq m 1 7.250 6.175 44.769
Slab Soffit H Sq m 1 7.250 6.175 44.769
Slab Soffit I Sq m 1 7.250 5.000 36.250
Slab soffit J Sq m 1 5.000 4.800 24.000
Beam 2BX-1/1 (200x600) Sq m 1 3.800 1.250 4.750
2BX-1/2 - (200x600) Sq m 1 6.750 1.200 8.100
2BX-2/1 -(250x550) Sq m 1 4.650 1.050 4.883
2BX -2/2 (300x600) Sq m 1 7.250 1.100 7.975
2BX-3 (250x625) Sq m 1 4.550 1.350 6.143
2BX-5 (250X550) Sq m 1 4.550 1.240 5.642
2BX-4(300x600) Sq m 1 7.000 1.100 7.700
2BX-5A (250x400) Sq m 1 4.800 0.830 3.984
2BX 6/1( .25X550) Sq m 1 4.800 1.130 5.424
2BX 6/2 (300x600) Sq m 1 7.000 1.100 7.700
2BX 7/1 (200x600) Sq m 1 4.800 1.290 6.192
2BX 7/2 (200x600) Sq m 1 6.750 1.200 8.100
2BX-5A (250x400) Sq m 1 4.800 0.830 3.984
2BY-1A(250x550) Sq m 1 5.000 1.200 6.000
2BY-1/3 (250x550) Sq m 1 1.300 1.300 1.690
2BY-1/2 (250X550) Sq m 1 4.400 1.240 5.456
2BY-1/1 (250x550) Sq m 1 5.000 1.240 6.200
2BY 3/4 (250x550) Sq m 1 5.000 1.000 5.000
2BY 3/3 (250X550) Sq m 1 5.450 1.000 5.450
2BY 3/2 (.25X.55) Sq m 1 5.850 1.040 6.084
2BY-3/1 (250X5550) Sq m 1 5.000 1.040 5.200
2BY-2(250X400) Sq m 1 1.800 0.940 1.692
2BY -4/4 (250x550) Sq m 1 5.000 1.150 5.750
2BY-4/3(250x550) Sq m 1 6.175 1.150 7.101
2BY-4/2 (250X550) Sq m 1 6.175 1.150 7.101
2BY-4/1 (250x550) Sq m 1 5.000 1.150 5.750
Projection bottom Sq m 1 12.800 0.375 4.800
side Sqm 1 12.800 0.150 1.920
Projection side Sq m 1 0.750 0.150 0.112
Stair bottom wall Sq m 1 4.500 0.600 2.700
Stair bottom raft Sq m 1 2.900 0.150 0.435
Stair 1 st Flight (GF to 1st floor) soffit Sq m 1 2.083 2.000 4.166
Flght side Sq m 2 2.083 0.150 0.625
1st Landing soffit Sq m 1 2.100 2.000 4.200
Landing side Sq m 1 2.000 0.150 0.300
2nd Flight Sq m 1 2.000 0.750 1.500
Side Sq m 1 0.750 0.150 0.112
2nd Landing Sq m 1 2.100 2.000 4.200
3 rd flight Sq m 1 2.083 2.000 4.166
side Sq m 1 2.083 0.150 0.312
3rd Landing Sq m 1 2.400 2.000 4.800
4 th Flight Sq m 1 2.000 0.400 0.800
side Sq m 1 0.400 0.150 0.060
4 th Landing Sq m 1 2.100 2.000 4.200
HLB (.25x.625) Sq m 1 4.700 1.350 6.345
Racker Beam Sq m 1 6.073 1.200 7.288
riser Sq m 19 2.000 0.150 5.700
1st floor to 2nd floor Stair Sq m 0.000
Stair 1 st Flight Sq m 1 2.083 2.000 4.166
side Sq m 2 2.226 0.150 0.668
1st Landing Sq m 1 2.100 2.000 4.200
side Sq m 1 2.000 0.150 0.300
2nd Flight Sq m 1 2.000 0.750 1.500
side Sq m 1 0.750 0.150 0.112
2nd Landing Sq m 1 2.100 2.000 4.200
3 rd flight Sq m 1 2.083 2.000 4.166
side Sq m 1 2.083 0.150 0.312
3rd Landing Sq m 1 2.100 2.000 4.200
4 th Flight Sq m 1 2.000 0.750 1.500
side Sq m 1 0.750 0.150 0.112
4 th Landing Sq m 1 2.100 2.000 4.200
HLB (.25x.625) Sq m 1 4.700 1.350 6.345
Racker Beam Sq m 1 6.073 1.200 7.288
riser Sq m 20 2.000 0.150 6.000
Riser side Sq m 8 0.300 0.150 0.360
Deduction Sq m -4 0.250 0.550 -0.550
Deduction Sq m -2 8.400 0.110 -1.848
Deduction Sq m -4 0.250 0.400 -0.400
Deduction Sq m -4 0.250 0.450 -0.450
Total = 896.414

Measurement Sheet
Sl. Height
Breadth
No. Description Unit No Length(M) Total QTY REMARKS.
(M)
(M)
ADMIN
SHUTTERING 4TH RA CU M
3RD FLOOR SLAB NO 1 CU M 1 4.8 2.4 11.520
4th FLOOR SLAB NO 2 CU M 1 4.8 2.3 11.040
5th FLOOR SLAB NO 3 CU M 1 4.8 2.35 11.280
6th FLOOR SLAB NO 4 CU M 1 4.8 2.05 9.840
7th FLOOR SLAB NO 5 CU M 1 2.4 1.8 4.320
8th FLOOR SLAB NO 6 CU M 1 4.8 2.6 12.480
9th FLOOR SLAB NO 7 CU M 1 4.8 2.1 10.080
10th FLOOR SLAB NO 8 CU M 1 5 1.5 7.500
11th FLOOR SLAB NO 9 CU M 1 6.175 1.5 9.263
12th FLOOR SLAB NO 9A CU M 1 6.175 1.5 9.263
13th FLOOR SLAB NO 8A CU M 1 5 1.5 7.500
14th FLOOR SLAB NO 10 CU M 1 5 2.6 13.000
15th FLOOR SLAB NO 11 CU M 1 6.175 2.6 16.055
16th FLOOR SLAB NO 11A CU M 1 6.175 2.6 16.055
17th FLOOR SLAB NO 10A CU M 1 5 2.6 13.000
18th FLOOR SLAB NO 12 CU M 1 5 2.6 13.000
19th FLOOR SLAB NO 13 CU M 1 6.175 2.6 16.055
20th FLOOR SLAB NO 13A CU M 1 6.175 2.6 16.055
21st FLOOR SLAB NO 12A CU M 1 5 2.6 13.000
0.000
Beam 3BX-1/1 (200x600) cu m 1 3.800 1.290 4.902
3BX-1/2 - (200x600) cu m 1 6.750 1.290 8.708
3BX-2/1 -(250x550) cu m 1 4.650 1.240 5.766
3BX -2/2 (300x600) cu m 1 7.000 1.280 8.960
3BX-3 (250x625) cu m 1 4.550 1.350 6.143
3BX-5 (250X550) cu m 1 4.550 1.240 5.642
3BX-4(300x600) cu m 1 7.000 1.200 8.400
3BX-5A (250x400) cu m 2 4.800 0.830 7.968
3BX 6/1( .25X550) cu m 1 4.800 1.130 5.424
3BX 6/2 (300x600) cu m 1 7.000 1.280 8.960
3BX 7/1 (200x600) cu m 1 3.800 1.290 4.902
3BX 7/2 (200x600) cu m 1 6.700 1.290 8.643
3BX-1A(250x400) cu m 1 4.800 0.780 3.744
3BY-1A(2500X550) cu m 1 5.000 1.240 6.200
3BY-1/3 (250x550) cu m 1 1.300 1.350 1.755
3BY-1/2 (250X550) cu m 1 4.400 1.240 5.456
3BY-1/1 (250x550) cu m 1 5.000 1.240 6.200
3BY 3/4 (250x550) cu m 1 5.000 1.100 5.500
3BY 3/3 (250X550) Ccu m 1 5.450 1.240 6.758
3BY 3/2 (.25X.55) cu m 1 5.850 1.100 6.435
3BY-3/1 (250X5550) cu m 1 5.000 1.100 5.500
3BY-2(250X400) cu m 1 1.800 0.940 1.692
Deduction cu m -2 2.400 0.110 -0.528
3BY -4/4 (250x550) cu m 1 5.000 1.240 6.200
3BY-4/3(250x550) cu m 1 6.175 1.240 7.657
3BY-4/2 (250X550) cu m 1 6.175 1.240 7.657
3BY-4/1 (250x550) cu m 1 5.000 1.240 6.200
3BY-3A/1,3A/4 (250x550) cu m 4 5.000 1.100 22.000
3BY-3A/3,3A/4 9250X550) cu m 4 6.175 1.100 27.170
Projection cu m 1 12.800 0.525 6.720
Projection side cu m 1 0.375 0.150 0.056
Deduction column juntion cu m -8 0.200 0.600 -0.960
Deduction column juntion cu m -42 0.250 0.550 -5.775
Deduction column juntion cu m -2 0.200 0.400 -0.160
Deduction column juntion cu m -4 0.250 0.550 -0.550
Deduction column juntion cu m -2 0.250 0.625 -0.313
Deduction column juntion cu m -6 0.250 0.400 -0.600
Deduction column juntion cu m -18 0.300 0.600 -3.240
2nd TO 3RD floor Column
Sq m 7 1.900 2.890
C1,C2,C3,C11,C14.C5,C16 38.437
C4,C6,C9,C13 column Sq m 4 1.600 2.890 18.496
C7,C10 column Sq m 2 2.000 2.890 11.560
C5,C12 column Sq m 2 1.900 2.890 10.982
C8 column Sq m 1 2.200 2.890 6.358
2nd floor to 3rd floor 0.000
Stair 1 st Flight Sq m 1 2.083 2.000 4.166
side Sq m 2 2.200 0.150 0.660
1st Landing Sq m 1 2.100 2.000 4.200
side Sq m 1 2.000 0.150 0.300
2nd Flight Sq m 1 2.000 0.750 1.500
side Sq m 1 0.750 0.150 0.112
2nd Landing Sq m 1 2.100 2.000 4.200
3 rd flight Sq m 1 2.000 2.000 4.000
side Sq m 1 2.000 0.150 0.300
3rd Landing Sq m 1 2.100 2.000 4.200
4 th Flight Sq m 1 2.000 0.750 1.500
side Sq m 1 0.750 0.150 0.112
4 th Landing Sq m 1 2.100 2.000 4.200
HLB (.25x.625) Sq m 1 4.700 1.350 6.345
Racker Beam Sq m 1 6.073 1.200 7.288
riser Sq m 20 2.000 0.150 6.000
Riser side Sq m 16 0.300 0.150 0.720

4 th RA MAIN BLOCK
RAFT portion Sq m 2 15.45 0.300 9.270
RAFT portion Sq m 1 1.05 0.300 0.315
RAFT portion Sq m 1 7.17 1.500 10.755
sump Sq m 1 12 0.300 3.600
down portion raft Sq m 1 38.136 0.200 7.627
RW wall out side Sq m 2 15.45 3.100 95.790
RW wall inside Sq m 2 15.45 2.975 91.928
Deduction stair portion Sq m -2 4.1 0.850 -6.970
Column C1(-2.1 to 1.0m) Sq m 2 0.4 2.970 2.376
Column C2(-2.1 to 1.0m) Sq m 2 0.4 2.970 2.376
Column C21(-2.1 to 1.0m) Sq m 2 0.4 2.970 2.376
Column C4(-2.1 to 1.0m) Sq m 1 2.4 2.970 7.128
Column C5(-2.1 to 1.0m) Sq m 1 2.5 2.970 7.425
Column C9(-2.1 to 1.0m) Sq m 1 2.3 2.970 6.831
Column C10(-2.1 to 1.0m) Sq m 1 2.3 2.970 6.831
Column C13(-2.1 to 1.0m) Sq m 1 2.3 2.970 6.831
Column C14(-2.1 to 1.0m) Sq m 1 2.3 2.970 6.831
Column C17(-2.1 to 1.0m) Sq m 2 0.4 2.970 2.376
Column C18(-2.1 to 1.0m) Sq m 2 0.4 2.970 2.376
FLOOR UPPER PORTION GF BEAM Sq m 0.000
GBX 2/1 (300X600) Sq m 1 8.075 1.250 10.094
GBX 2/2 (300X600) Sq m 1 6.075 1.250 7.594
GBX 3/1 (250X450) Sq m 1 6.275 0.900 5.648
GBX 3/2(250X450) Sq m 1 6.075 1.025 6.227
GBX 4/1, 4/2 (300X600) Sq m 1 8.085 1.250 10.106
Deduction beam gby 1/1 to 1/4 Sq m -3 0.4 0.800 -0.960
deduction Sq m -2 6.075 0.050 -0.608
GBX 4/3 (300X600) Sq m 1 6.075 1.250 7.594
GBX 5/1,5/2 (300X600) Sq m 1 8.075 1.250 10.094
GBX 5/3(300X600) Sq m 1 6.075 1.250 7.594
deduction sq m -1 6.075 0.025 -0.152
GBY 1/1,1/2,1/3,1/4 (400X400) Sq m 1 21.2 0.950 20.140
GBY 2/1,2/2,2/3,2/4(300X600) Sq m 1 19.075 1.250 23.844
deduction sq m -1 5.9 0.050 -0.295
GBY-3(250X450) Sq m 1 5.45 0.890 4.850
GBY3A (250X450) Sq m 1 4.95 0.900 4.455
GBY 4/1,4/2,4/3,4/4(300X600) Sq m 1 19.05 1.250 23.813
deduction sq m -1 4.95 0.025 -0.124
GBY 5 (250X600) Sq m 1 7.275 1.325 9.639
deduction sq m -1 1.575 0.125 -0.197
GBY-6 (250X450) Sq m 1 5.9 0.900 5.310
GBX 2A(250X450) Sq m 1 4.1 1.025 4.203
GBY 6A(250X450) Sq m 2 0.4 1.150 0.920
SLAB A Sq m 1 22.2 0.5 11.100
SLAB B Sq m 1 5.45 1.6 8.720
SLAB C Sq m 1 5.45 2.1 11.445
SLAB D Sq m 1 5.45 3.85 20.983
SLAB E Sq m 1 5.45 1.7 9.265
SLAB F Sq m 1 5 1.6 8.000
SLAB G Sq m 1 6.275 2.2 13.805
SLAB H Sq m 1 6.275 2.5 15.688
SLAB I Sq m 1 6.075 2.5 15.188
SLAB J Sq m 1 2.2 1.7 3.740
SLAB K Sq m 1 5.9 1.6 9.440
SLAB L Sq m 1 6.2 5.9 36.580
SLAB M Sq m 1 5.85 3.45 20.183
SLAB N Sq m 1 5.9 2.3 13.570
SLAB P Sq m 1 4.95 1.61 7.970
SLAB Q Sq m 1 4.95 3.1 15.345
SLAB R Sq m 1 4.95 2.9 14.355
SLAB S Sq m 1 6.075 4.95 30.071
SLAB T Sq m 1 4.1 1.575 6.458
Deductio beam junction Sq m -8 0.4 0.4 -1.280
Deductio beam junction Sq m -8 0.3 0.6 -1.440
Deductio beam junction Sq m -2 0.25 0.45 -0.225
Deductio beam junction Sq m -2 0.3 0.6 -0.360
Deductio beam junction Sq m -8 0.3 0.6 -1.440
Deductio beam junction Sq m -6 0.25 0.65 -0.975
Deductio beam junction Sq m -16 0.25 0.65 -2.600
Deductio beam junction Sq m -24 0.3 0.6 -4.320
STAIR BASEMENT TO GF bottom wall Sq m 2 2.1 0.3 1.260
1st waist slab Sq m 1 4.2 2.1 8.820
2nd waist slab side sq m 2 4.2 0.15 1.260
1st landing Sq m 1 4.1 2.1 8.610
2nd landing side sq m 1 2 0.175 0.350
2nd waist slab Sq m 1 1.8 2.075 3.735
3rd waist slab side sq m 2 1.8 0.175 0.630
2nd landing Sq m 1 2 2.075 4.150
3rd landing Sq m 1 2 0.175 0.350
Riser Sq m 19 2.1 0.15 5.985
Riser side sq m 8.5 0.3 0.15 0.383
sq m TOTAL = 1281.789
ABSTRACT
Contractor Name : ST Construction
BNWCCC site
Name of Work: civil work.
WO:-
RA No. 4th RA Bill No 04 & date: Date : 18.03.2024
As per Work Order Upto Previous Bill This Bill Cumulative Total

Sl No. Description of work Unit Rate Quantity Amount Quantity Amt. Rs. Quantity Amt. Rs. Quantity Amt. Rs.

Labour charges for


Shuttering with board
making, repairing and
1 all consumable Sq m 250 1798.824 449,705.95 1281.789 320,447.20 3,080.61 770,153.15
materials(nail,
machinery etc). Upto
5 th floor height.

Labour charges for


cutting, bending, and
fixing Reinforcement
2 MT 6500 56.242 365,573.00 29.196 189,774.00 85.438 555,347.00
at slab &column with
binding wire. Upto 5th
floor height.

Supply carpenter,
3 Fitter Daily 8 hour Nos. 550 10 5,500.00 0 - 10.00 5,500.00
basis
Supply Helper Daily 8
4 Nos. 450 0 - 0 - - -
hour basis
TOTAL BOQ AMOUNT 820,778.95 510,221.20 1,331,000.15
Less T.D.S. 1% 5,102.21
Retention Amount @ 3% 15,306.64
Round off (0.35)
Total = 489,812.00
MATERIALS RECOVERY
SL MATERIALS TAKEN AMOUNT REMARKS

SHUTTERIN
G or
TONNAGE
QNTY B/WIRE (KGS/MT) NAILS (KG/SQM) TOTAL (KGS) RATE (Rs)/KG Rs (INR)

Nails @
0.112kgs
1 #NAME? 0.12 #NAME? ₹ 74.00 #NAME? /SQM
2 #NAME? 8.00 #NAME? ₹ 66.00 #NAME? 8 kg/MT
Total = #NAME?
SUPPLY LABOUR SUMMARY
SL DESCRIPTION OF WORK Date Carpentre Fitter Masson HELPERS
05.01.24 TO
1 FITTER SUPPLY FOR COLUMN LAYOUT 07.01.24 10
2
3
4
5
6
7
16
17
18

Total = 0 10 0 0
OT

0
INVOICE

To
M/s. S. M. NIRMAN Bill no.- 04
Infrastructure & Development Pvt. Ltd. 4TH RA
20/3, S. N. Roy Road, Kolkata-700038 DATE
18.03.2014
Bill Period:
Place of work: BNWCCC site, Newtown
Work Order No. & Date:
PARTICULARS Amount in Rs.

Civil work
Work Done Value in This Bill 510,221.20
Less T.D.S. 1% 5,102.21
Retention Amount @ 3% 15,306.64
DEDUCTION
Round off

BILL AMOUNT RECEIVABLE (ROUNDED OFF) 489,812.35


Amount : Two Lakh Thirteen Thousand Nine Hundred Thirty Two only.
BBS SUMMARY 4 th RA
Sl. No. Length(M Breadth Height
Description Unit No
) (M) (M)
Main building raft & tie beam
upper portion basement column
Basement to GF
Stair Basement to GF

Admin column 2nd floor to 3rd floor


Stair 2nd to 3rd floor
3rd floor beam
3rd floor slab

Total =
Total REMARK
QTY S.
15.258

4.050
1.010

1.610
1.010
4.158
2.100

29.196

You might also like