Thickness of Slab

Ln inside/inside 305 m=Llc/c/Lsc/c<2 Two way slab


Fy 2100 Ll c/c cm Ls c/c cm m
T=Ln*(800+0.07*Fy)/36000 9 305 179 Two way slab
DESIGN OF TWO WAY SLAB ( COMBINED AREA)
No. Materials Thickness Density Weight H R
cm kg/m3 kg/m2 25.2 8
1 Plaster cm 2 2200 44
2 Slab cm 15 2500 375
3 Insulations cm 20 2000 400
4 Plaster cm 3 2200 66
5 Terrazzo cm 2 2400 48
6 Mud and Straw cm 0 2000 0
7 Iorn Sheet kg/m^2 0 D.L= 933
8 L.L kg/m^2 150 L.L= 150
Wt = 1562
S-16
1 Long Clear Span 475
2 Short Clear Span 328
3 Cover 2.5
4 Wall Thickness 0
Shart Span c/c 3.28
Dia. Of Steel 10
Area Of Steel mm 0.78
m= 0.7 concrete.doc
d= 12
Fy= 2800
Wall Thickness 0 Short Span 3.28 Long Span 4.75
Neg. Pos. Neg. Neg. Pos. Neg.
Middle Strips cont Middle disc Cont. Middle disc
1 Strip Width 475 328
2 Coefficient 0.049 0.037 0.049 0.049 0.037 0.025
3 M=C*Wt*Ln^2/0.9 915 690.9 915 915 691 467
4 Asmax=M/Fy*0.9d 3.1 2.3 3.1 3.1 2.3 1.6
5 Asmin=0.002*b*h cm 3 3 3 3 3 3
6 Area Of Steel mm 0.78 0.78 0.78 0.78 0.78 0.78
7 No. of Bar 4 4 4 4 4 4
In one meter Shoudin't be less then 5Bars 5 5 5 5 5 5
8 Spacing 20 20 20 20 20 20
9 Total No. of Bars 24 24 24 17 17 17
A I T0 T=0.07H^3/4 1.25T B=2.5*(T0/1.25T)^2/3 C=A*BI/R
0.35 1 0.5 0.787314855 0.98414357 1.59184451400039 0.069643

B=2.5*(T0/T)^2/3 C=A*BI/R
1.84714445149543 0.080813
Thickness of Slab
Ln 300 m=Llc/c/Lsc/c>=2 ONE way slab
Fy 2800 Ll Ls m
T=Ln*(800+0.07*Fy)/36000 9 700 300 One way slab
DESIGN OF ONE WAY SLAB ( COMBINED AREA)
No. Materials Thickness Density Weight
cm kg/m3 kg/m2
1 Plaster 2.5 2400 60
2 Slab 15 2500 375
3 Insulations 0 1800 0
4 Plaster 0 2000 0
5 Terrazzo 0 2500 0
6 Mud and Straw 0 2000 0
7 Iorn Sheet 0 D.L= 435
8 L.L 350 L.L= 350
Wt = 1205
S-1
1 Long Clear Span 720
2 Short Clear Span 300
3 Cover 2.5
4 Wall Thickness 0.35
Shart Span 3
Dia. Of Steel 10
Area Of Steel mm 0.78
m= 0.4
d= 12.5
Fy= 2800
Short Span 3.35 Long Span
Middle Strips Neg. Pos. Neg. Neg.
Cont. Middle Disc. Cont.
1 Strip Width 720
2 Coefficient 0.08333 0.0625 0.08333 0.08333
3 M=C*Wt*Ln^2/0.9 1252.15 939.11 1252.15 1252.15
4 Asmax=M/Fy*0.9d 3.6 2.7 3.6 3.6
5 Asmin=0.002*b*h cm 3 3 3 3
6 Area Of Steel mm 0.78 0.78 0.78 0.78
7 No. of Bar 5 4 5 5
In one meter Shoudin't be less then 5Bars 5 5 5 5
8 Spacing 20 20 20 20
9 Total No. of Bars 36 36 36 15
10 0,15 =‫سيخ های ساختمانی‬%*b*h
Long Span 7.55
Pos. Neg.
Middle Disc.
300
0.0625 0.08333
940 1253
2.7 3.6
3 3
0.78 0.78
4 5
5 5
20 20
15 15
Contilever slab with beam design
No. Materials Thickness Density Weight
cm kg/m3 kg/m2
1 Plaster 2.5 2400 60
2 Slab 15 2500 375
3 Insulations 0 1800 0
4 Plaster 0 2000 0
5 Terrazzo 0 2500 0
6 Mud and Straw 0 2000 0
7 Iorn Sheet 0
8 L.L 350
D.L= 435
L.L= 350
Ll 2 Wt = 1205
Ls 1.5
Cover 2.5
wall thicknes 35
Dia. Of Steel 10
Area Of Steel mm 0.78
d= 12.5
Fy= 2800
fc 200

LONG SPAN 2.35


1 r= Ll/LS 1.333333 1
2 WLl = W*(1/1+r^4) 289.6291 2
3 MuLl= (1/8)*(WLl*Ll^2) 199.9346 3
4 Mu MuL1/0.9 222.1495 4
5 (As)Ll= MuLl/fy*z 0.705237 5
6 (As)min = 0.002*b*h 3
7 No. of Bar As/area of steel 4 6
8 In one meter Shoudin't be less then 5Bars 5 5 7
9 Spacing 100/ nos of bar 20 8
10 Total No. of Bars 8 9
11 V= A*W 1807.5
12 Vap = V/b*d 1.446
13 Vc 0.55sqrtfc 7.778175
Vc>Vap
if Ll/Ls<2 two way slab

A3

SHORT SPAN 1.85


r= Ll/LS 1.333333333
WLs = Wt - WLl1 915.3709199
MuLs= (1/2)*(WLs*Ls^2) 1566.428487
Mu MuLs/0.9 1740.476096
(As)Ls = MuLl/fy*z 5.525320941
(As)min = 0.002*b*h 3
No. of Bar As/area of steel 8
In one meter Shoudin't be less then 5Bars = 5 5
Spacing = 100/ nos of bar 12
Total No. of Bars = 16

Vc>Vap OK
DESIGN OF CONTILEVER SLAB WITH BEAM

CONTILEVER WITH BEAM

Materials Thickness Density Weight


cm kg/m3 kg/m2
Plaster 1.5 2200 33
Slab 12 2500 300
Insulations 0 1800 0
Plaster 2 2200 44
Terrazzo 3 2200 66
Mud and Straw 0 2000 0
Iorn Sheet 0
L.L 400

S-1
Long Clear Span (inside to inside) 360
Short Clear Span(inside to inside) 50
Cover 2
Long Clear Span (inside to inside) 3.6
Shart Span 0.5
Dia. Of Steel 10
Area Of Steel mm 0.78
d= 10
Fy= 2100
fc= 200
Wt= 1651
R=Ll/Ls 7.2
ws=wt-wl 1650.386

M=0.5*(WtLs^2/0.9) 230
As=M/Fy*Z 1.216931
Asmin=0.002*b*hcm 2.4
As one bar 0.78
No.Bars 4
Spacing 25
Total No. of Bars SHORT SPAN 15

v=Wl/0.85 972
Vap=v/b*d 0.9 Comdition
Vc=0.55*sqrt(fc) 8 Vc>Vap
Vc>Vap Vc>Vap
D.L= 443
L.L= 400
Wt = 1651

Wls 0.61412321

M=0.5*(WtLs^2/0.9) 2
As=M/Fy*Z 0.00952381
Asmin=0.002*b*hcm 2.4
As one bar 0.28
No.Bars 5
Spacing 11
Total No. of Bars LONG SPAN 33
DESIGN OF CONTILEVER SLAB WITHOUT PANEL
CONTILEVER WITH OUT BEAM

Materials Thickness Density


cm kg/m3
Plaster 3 2500
Slab 12 2500
Insulations 0 1800
Plaster 4 2000
Terrazzo 0 2500
Mud and Straw 0 2000
Iorn Sheet
L.L

S-1
Long Clear Span (inside to inside) 305
Short Clear Span(inside to inside) 203
Cover 2
Shart Span 2.03
Dia. Of Steel 10
Area Of Steel mm 0.78
d= 8.5
Fy= 2100
fc= 200
Wt= 1147

M=0.5*(WtLs^2/0.9) 2626
As=M/Fy*Z 16.346094
As=0.002*b*hcm 2.4
As one bar 0.78
No.Bars 21
Spacing 4
Total No. of Bars 65

v=Wl/0.85+P/0.85 2740
Vap=v/b*d 2.3
Vc=0.55*sqrt(fc) 8
Vc>Vap Vc>Vap
B WITHOUT PANEL

Weight
kg/m2
75
300
0
80
0
0
0 D.L= 455
300 L.L= 300
Wt = 1147

Comdition
Vc>Vap
DESIGN OF CONTILEVER SLAB WITH PANEL
CONTILEVER WITH OUT BEAM

Materials Thickness Density


cm kg/m3
Plaster 1.5 2200
Slab 12 2500
Insulations 0 1800
Plaster 2 2200
Terrazzo 0 2500
Mud and Straw 0 2000
Iorn Sheet
L.L

S-1
Long Clear Span (inside to inside) 315
Short Clear Span(inside to inside) 50
Cover 2
Shart Span 0.5
Dia. Of Steel 10
Area Of Steel mm 0.78
d= 8.5
Fy= 2100
fc= 200
Wt= 1208

M=0.5*(WtLs^2/0.9)+(Pl/0.9) 1323
As=M/Fy*Z 9
As=0.002*b*hcm 2.4
As of Steel 0.78
No.Bars 12
Spacing 8
Total No. of Bars 38

v=Wl/0.85+P/0.85 3157
Vap=v/b*d 2.7
Vc=0.55*sqrt(fc) 8
Vc>Vap Vc>Vap OK
B WITH PANEL

Weight of Panel
Weight Height Width Density
kg/m2 m m kg/m3
33 3.3 0.35 1800
300 Wp= 2079
0
44
0
0
0 D.L= 377 0
400 L.L= 400
Wt = 1208

P
W

condition
Vc>Vap

You might also like