SCOPE OF WORK
S/N DESCRIPTION QUANTITY RATE
5 PROVING AND LAYING OF PCC (1:4:8) USING LP 15.00 CFT 290 PER 1
SAND AND MARGALA CRUSH (AVG. 6" DEPTH) SIZE
= 3x2.5'x2.5'x0.5'
TOTAL
RATE AMOUNT
JOB 10,000.00
CFT 11,600.00
CFT 9,000.00
CFT 1,125.00
CFT 4,350.00
KG 45,000.00
CFT 29,400.00
OTAL 110,475.00
R ENGR (CIVIL)
Skid Foundation Design
S.N Measurements
o. Description Formula Length(m) Width(m) Quantity Remarks/References
Dimension Area (in m2) according to pump size and available
1 of Pad Length*Width 3.05 0.61 1.86 area on site. Pump Size chart Ref. 1
Depth =
Depth of
3
FootingWeight/Density Weight (Pump and Density of Min Depth of Footing will taken as 0.96m or 38".
of RCC weight) Concrete Area (Weight of Pump = 5645 kg/6 and Concrete 1:2:4
Concrete*Area 4,287 2400 1.86 0.96 weight = 1800 kg/m2)
Weight of pump Area Soil conditions and Weight and Size ratio is ok. See
P (Kpa)= Ref. 2 table.
2 Pressure Weight/Area 5645 1.86 Concrete 3036.6
Punching Depth of Cover
Shear Force/4*D*c Applied Force in N Footing (mm) (mm)
Check (N/mm )2
42,036.0 960.87 50 0.219 Punching Shear 1.562/mm2 < Allowable Stress
4
Strength of Concrete 4N/mm2
Allowable
Allowable Stress (N/mm )
2
Stress
= 0.8(fcu)0.5 25 4
Ref. 1 Ref. 2
Steel Schedule for Skid Foundation
Dimentions
S.No Description Symbol Measurements (m) Remarks
1 Length of Footing X 3.96 13 feet
2 Breadth of Footing Y 1.52 5 Feet
3 Height of Footing h 0.91 3 Feet
4 Dia of Main Bar dm 0.0254 #8 Bar
5 Dia of Distribution Bar dd 0.0127 #4 Bar
6 Spacing of Main Bar Sm 0.152 6 Inches
7 Spacing of Distribution Bar Sd 0.229 9 Inches
8 Concrete Cover c 0.05 2 Inches
Calculations
S.No Description Formula Quantity Remarks
1 Number of Main Bars Nm=(Y/Sm) 10 Number of Bars
2 Number of Dist Bars Nd=(X/Sd) 17 Number of Bars
Main Bar Cutting Length Cm1=[X-2c]+2[h-2c]-2[2dm] 5.39 m
Total Main Bar Cutting Length Top Cm=Nm*Cm1 53.88 m
3 Total Main Bar Cutting Length Bottom Cm=Nm*Cm1 53.88 m
Dist Bar Cutting Length Cd1=[Y-2c]+2[h-2c]-2[2dm] 3.002 m
Total Dist Bar Cutting Length Top Cd=Nd*Cd1 52.02 m
4 Total Dist Bar Cutting Length Bottom Cd=Nd*Cd1 52.02 m
Main Bar Steel (Kg) Top Wm=D2*Cm/162 214.56 Kg
5 Main Bar Steel (Kg) Bottom Wm=D2*Cm/162 214.56 Kg
Dist Bar Steel (Kg) Top Wd=D2*Cd/162 51.79 Kg
6 Dist Bar Steel (Kg) Bottom Wd=D2*Cd/162 51.79 Kg
Total Steel (Kg) 532.70 Kg
Steel Quantity Check
Total Steel >= Min Quantity of Steel So,
1 Quantity of Steel (Min) L*W*h*1%*Density of Steel 416.83 Steel is OK
Steel Schedule for Skid Foundation
Dia: of Bar Weight of 1m
Length of Total Length Total Weight
S.No Bar Type (mm) and Shape of Bar No: of Bars length Bar
Bar(m) of Bar(m) of Bar (Kg)
Spacing (Kg/m)
Main
Reinforcem
25.4 10 Top
1 ent (X- 4.65 37.23 2.24 83.40
(#6bar) 10 Bottom
Bars) Top
and Bottom
Distribution
Reinforcem
12.7 17 Top
2 ent (Y- 2.24 58.24 0.996 58.01
(#4bar) 17 Bottom
Bars) Top
and Bottom
TOTAL 141.41
ESTIMATE
Job: LEVEL/DRESSING OF EXISTING SKID PAD AND CONSTRUCTION OF 3 NEW PADS FOUNDATION
(2.5'x2.5'x4') GENSET D-398 AT TANK FARM BALKASSAR
SCOPE OF WORK
S/N DESCRIPTION QUANTITY RATE AMOUNT
Main
1 Reinforcement 19.05 (#6bar) 10 16.75 167.44 0.68 114.03
(X-Bars) Bottom
Main
2 Reinforcement 12.7 (#4bar) 10 16.75 167.44 0.30 50.23
(X-Bars) Top
Distribution
3 Reinforcement 19.05 (#6bar) 26 8.83 229.58 0.68 156.34
(Y-Bars) Bottom
Distribution
4 Reinforcement 12.7 (#4bar) 26 8.83 229.58 0.30 68.87
(Y-Bars) Top
Distribution
Reinforcement Bar
3 9.525 (#3bar) 12 809.67 0.17 137.64
(Rings) (3 Different
Sizes)