You are on page 1of 7

Discharge computation

Rational Q = CIA
Formula
C= 0.6
I= 70 mm/hr.
A= 33 ha (Based on GIS and Google
Q= 3.85 cumec

Calculation of Depth of channel

S.no Data Quantity Unit


1 Manning coefficient(n) 0.018 (IS: 10430:2000 table 1) (n
2 Depth of flow(y) 1.15 m
3 Width of flow(b) 2.5 m
4 Slope of bed(S) 0.004444 (471.112-469.783)/(300)

Calculation
1 Area Of flow A=(b*y) 2.875 m2
2 Wetted Perimeter P=(b+2*y) 4.8 m
3 Hydaulic Mean Depth(R=A/P) 0.6 m
4 Discharge Q=(1/n)*A*R2/3*S^0.5 7.6 m3/s
5 Velocity (=Q/A) 2.6 m/s

6 Thus, Width = 2.5 m


7 Flow depth = 1.15 m
8 Adopt free board = 0.35 m
9 Thus, provide depth = 1.5 m
(Based on GIS and Google earth)

(IS: 10430:2000 table 1) (n- (0.018-0.02)

(471.112-469.783)/(300)

(IS 10430:2000 Clause 8.8.5)


(Max. permissible velocity for cement concerte lining is 2.7m/s)
Calculation of discharge
12/29/2019

S.no Data Quantity


1 Angle of internal friction(φ) (30 degrees) 0.52
2 Active pressure co-efficient(Ka) 0.31
3 Depth of soil retained (ds) 0.90
4 Depth of water(y) 1.15
5 Unit Weight Of soil (γs) 24
6 Unit Weight Of Water (Yw) 10
7 Depth Of wall (dw) 1.5
8 Grade Of concrete (M20) 20
9 Grade of steel (Fe500) 500

Calculation
10 Pressure At the bottom Of Rock Due to Soil(Ka*γs*ds) 6.76
11 Pressure Force (Ps=(0.5*Ka*γs*ds*ds) 3.04
12 Lever Arm from bottom (Lr) 0.90
13 Moment due to retained soil (Clockwise) (M1) 2.74
14 Pressure at the bottom of wall due to water(y*y w) 11.50
15 Pressure force Due to water(Pw)=(0.5*y*yw*y) 6.61
16 Lever Arm 0.38
17 Moment due to water pressure (Anticlock) (M2) 2.53
18 Total Moment = (M1-M2) 0.20

Design Of section
19 Required Thickness d=(Mu/0.137*Fck*b)^0.5 8.60
20 Adopt thickness D 300
21 Adopt effective depth (d) = 274

Reinforcement Calculation
22 Area of steel required=Mu/0.87*fy*d*(1-0.42*0.48) 24.07
23 Min. longitudnal area of reinforcement = (0.12%)*bd 328.80
24 Provide dia. Of reinforcement 12
25 No of bar 12 mm bar required per meter width 3
26 Spacing of bar 333
Spacing shall not be less than 300mm or d
27 Adopt spacing 250
28 Transverse area of reinforcement = (0.12%)*bd 328.8
29 No of bar 12 mm bar required per meter width 3
30 Spacing of bar 333
Spacing shall not be less than 300mm or .75*d
31 Adopt spacing 250

Thus provide longitudnal reinforcement of 12mm @ 250mm c/c and transverse reinforcement of 12mm @ 250
Unit
Radian

m
m
kN/m3
kN/m3
m
N/mm2
N/mm2

KN/m2
kN/m
m
Kn-m
KN/m2
kN/m
m
KN-m
KN-m

mm
mm
mm

mm2
mm2
mm
nos
mm

mm
mm2
nos
mm

mm

nforcement of 12mm @ 250mm c/c on both side


RCC Drain Plum Plum
Chainage Length(m) Str.cut Str.cut Back fill Back fill Sectional RCC Drain concrete concrete
area(m2) volume(m3) area(m2) volume(m3) Volume(m3) sectional
area(m2) area(m2) volume(m3)

0 0.287 6.424 2.33 0 0.237 0


10 10 0 1.435 7.288 68.56 2.268 22.99 4.718 24.775
20 10 0.884 4.42 0.122 37.05 2.187 22.275 3.43 40.74
30 10 1.181 10.325 0.017 0.695 2.1 21.435 0.715 20.725
40 10 4.61 28.955 0 0.085 2 20.5 0 3.575
50 10 2.917 37.635 0.14 0.7 1.914 19.57 0 0
60 10 1.584 22.505 0.469 3.045 1.831 18.725 0.461 2.305
70 10 0.81 11.97 1 7.345 1.831 18.31 0.22 3.405
80 10 1.719 12.645 0.462 7.31 1.831 18.31 0.007 1.135
90 10 0.59 11.545 1.445 9.535 1.831 18.31 0.234 1.205
100 10 0.109 3.495 2.089 17.67 1.831 18.31 1.108 6.71
110 10 0.09 0.995 2.507 22.98 1.831 18.31 0.843 9.755
120 10 1.269 6.795 0.164 13.355 1.831 18.31 0.569 7.06
130 10 1.53 13.995 0.118 1.41 1.831 18.31 0.271 4.2
140 10 0.973 12.515 0.373 2.455 1.831 18.31 0.043 1.57
150 10 0 4.865 3.012 16.925 1.831 18.31 1.9 9.715
160 10 0.221 1.105 0.909 19.605 1.831 18.31 0.77 13.35
170 10 0.492 3.565 1.479 11.94 1.831 18.31 0.572 6.71
180 10 2.14 13.16 0.218 8.485 1.831 18.31 2.86
190 10 3.753 29.465 0 1.09 1.831 18.31 0
200 10 5.98 48.665 0 1.831 18.31 0
210 10 8.27 71.25 0 1.831 18.31
220 10 6.65 74.6 0 1.831 18.31
230 10 4.131 53.905 0 1.831 18.31
240 10 11.747 79.39 0 1.831 18.31
250 10 11.744 117.455 0 1.831 18.31
260 10 8.357 100.505 0 1.831 18.31
270 10 8.583 84.7 0 1.831 18.31
280 10 7.396 79.895 0 1.831 18.31
290 10 4.78 60.88 0 1.831 18.31
300 10 7.693 62.365 0 1.831 18.31
310 10 10.196 89.445 0 1.831 18.31
320 10 13.3 117.48 0 2.98 24.055
330 10 15.46 143.8 0 3.86 34.2
Total Qty 149.446 1415.725 250.24 641.5 159.795
S.No Description Quantity Unit
1 Site Clearance 1155 m2
2 Earthwork excavation 1565.171 m3
Earthwork excavation in rock 1408.6539 m3
Earthwork excavation in soil 156.5171 m3
3 concrete M20 650 m3
4 Plum concrete @M10/40 159.795 m3
5 Rebars 150 tonn