Project Name : Design Of Field Splice 1
Powder Factory
Column Section : Col 2 Steel grade St.52 referance
Fy = 3.60 t/cm2 ECP
1)-DIM. OF STEEL SECTION :- Fu = 5.20 t/cm2
The section is : Built up sec
bFL.U = 150.00 mm
tFL.U = 8.00 mm
hWEB = 400.00 mm
tWEB = 6.00 mm
bFL.L = 150.00 mm
tFL.L = 8.00 mm

2)-DIM. OF SPLICE PLATE :-


Thickness of flange plate splice = 6.0 mm
Thickness of web plate splice = 4.0 mm

3)- H.S.B USED ARE :


M 16 Q 10.9
AS = 1.57 cm2
PS = 3.16 t
T = 9.89 t

4)-DESIGN OF BOLTS
A) Bolts between flange splice plate and flange
(0.64 𝑓𝑦 𝑏𝑓 𝑡𝑓)/(2 𝑝𝑠)
n1 = = 4.375 n1 = 6 Bolts

B) Bolts between web splice plate and web


Pitch = 3 Φ
n2 per one row = 6.667 n2 = 6 Bolts
Actual Pitch = 53 mm

5)-CHECKS :-
h = 85.33 mm
f1 = 2.21 t/cm2
f2 = 1.23 t/cm2
Assume number of rows = 2

fH = 4.40 t

Q splice = 44.00 t

fV = 3.667 t

fR √(
= 〖𝑓𝐻〗 ^2+ = 5.731 t < 2 Ps = 6.320 t
〖𝑓𝑉〗 ^2 )
SAFE
Design of field splice ( for rafter length more t

Thickness of flanges plate

Dimensions
Thickness of web plate

Design no of Bolts

fy(t/cm2) 3.6

no of plan
for 2
n1 shear(1or2)

Resistance
type
( Rleast or 3.16
Ps)
n1
Resistance
type
( Rleast or 3.16
Ps)

.
pitch ( only no 3
before D) ig 3D >> 3
Diameter of bolts 1.2
(cm)

Pitch (cm) 3.6


n2 no of bolts per one 88.8888888888889
row

Final no of bolts 4

act . Pitch 80

Ckeck
Fy ( t/ cm2 )
assume no of rows

h (cm)

F1(t/cm2)

F2(t/cm2)
calculations
FH 5

Qsplice (ton)

Fv

FR 57.5093385206219

Note : FR should be less than Resistance if this not fullfil


or rafter length more than 12 meters )

Data
bf (cm) tf(cm) t1 (cm) 0.444444 t1( final) 0.8
15 0.8

Data
dw (cm) tw(cm) t2 (cm) 0.3735 t2( final) 0.6
400 0.6

sign no of Bolts

no of bolt = 4.3746835443038
final no of bolts = 9
.
3

1.2

3.6

88.8888888888889

80

Ckeck
3.6
2

119.2

2.294784

0.9216

57.50894592

1.7

0.2125

57.5093385206219 ton