1. Technical Data
dc concrete column depth = 390 mm
bc concrete column width = 265 mm
d column web depth = 250 mm
b column flange width = 125 mm
N Base plate length = 350 mm
B Base plate width = 225 mm
t assumed base plate thickness = 16 mm
X = 31 mm
f Bolt to column center distance = 150 mm
A1 Area of baseplate = 78,750 mm
A2 Area of concrete column = 103,350 mm
A2/A1 = 1.31
Db Anchor rods diameter = 16 mm
nt Anchor rods on each side = 3 pcs
2. Structural data
1 of 79
3. Plate Calculation
Check eccentricity
fp (max) concrete bearing strength = 16 N/mm2
fp (max) 0,65 . 0,85 f'c √( A2 / A1 )
q max maximum bearing pressure = 3,560 N / mm
fp max B
e crit critcal eccentricity value = 174.99 mm
e crit = N/2 - P/(2 B *q_max)
e actual eccentricity value, M/P = 343 mm
e < ecrit, small eccentricity case. Thereis no tendency to overturn.
Anchor rods are required for moment equilibrium.
Compute Y and T
Y = (N - 2e), when e <= ecrit = 4 mm
= (f + N/2) - ((f + N/2)^2 - 2 P (e + f) / q max)^1/2, when e > e crit
T = T (anchor rod tension) = qmax Y - P, = 4,813 N
when e > e crit
check bearing pressure
fp actual compression stress = 6.67 N/mm2
fp = P / (Y . N)
OK ≤ fp (max)
2 of 79
a) Base plate yielding limit at bearing Interface
m = (N - 0.95 d) / 2 = 56 mm
n = (B - 0.8 bf) / 2 = 63 mm
t req. 1 = √ ( 2 . fpu m2 / (0,9 fy) ) = 15.7 mm
Shear check
φ Vn = Friction between concrete and baseplate = 4,804 N
= φ u Pu <= φ 0,2 f'c Ac or φ 800 Ac
φ = 0,75
µ = 0,7, coefficient of friction
Ac = area of baseplate
Vu < φ Vn Safe
Hook Length
ld = In tension mode : = 180.5 mm
= 0,24 db fy ψe / √f'c
ψe = 1,0
Use anchor length = 250 mm
Extension length, 12 db = 192 mm
3 of 79
4 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
PEMILIK : PTPN XI
1 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
NO.
1 14/05/2018 - Jarak antar gording telah dicntumkan.
2 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
HALAMAN REVISI
No. Hal. A B 0 No. Hal. A B 0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
3 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
24
25
26
27
28
29
30
31
32
DAFTAR ISI
REVISI
HALAMAN REVISI
DAFTAR ISI
1. PENDAHULUAN
1.1 Tujuan
1.3 Deskripsi
2. KRITERIA DESAIN
2.2. Material
2.3.1. Pembebanan
4 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
4. RINGKASAN PERENCANAAN
1. PENDAHULUAN
1.1. Tujuan
Perencanaan ini dilakukan untuk merencanakan struktur VFD room dan auixiliary panel room di Djatiroto
Lumajang, jawa Timur, untuk proyek pengembangan dan modernisasi PG Djatiroto milik PTPN XI.
1.3. Deskripsi
Lokasi bangunan dapat dilihat pada gambar berikut.
5 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
VFD room
6 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
2. KRITERIA DESIGN
Perencanaan struktur bangunan memakai rekomendasi yang terdapat dalam peraturan dan
standar berikut
a) SNI 03-2847-2013: “Tata Cara Perhitungan Struktur Beton untuk
Bangunan Gedung”;
b) ACI 318-08: “Building Code Reinforcements for Structural Concrete”;
c) ANSI/AISC 360-10, "Specification for Steel Structural Building"
2.2. Material
7 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
2.3.1. Pembebanan
8 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
Data pemeriksaan tanah mengacu pada data dari pemilik proyek, dokumen
no. SR.KSO-01/HW.DM.03-03/2017 : Laporan Penyelidikan Tanah yang dilaksanakan oleh Testana
Engineering,INC. Data uji tanah yang dipakai adalah data pada titik DB-9.
Gbr. 3.1 Penyelidikan Tanah untuk VFD Room dan Auxiliary Panel Room
9 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
10 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
11 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
4. Perencanaan Struktur
5.00
12 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
program komputer.
T S T S
rs PG Djatiroto
0 0.39 2.11974 0.24 0.700
0.05 0.67 2.21974 0.23 0.600
0.500
0.1 0.96 2.31974 0.22
0.400
0.300
0.200 13 of 79
0.100
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
rs PG Djatiroto
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
0.700
AUXILIARY PANEL ROOM
0.600 DATE : 14 / 05 / 2018
0.500
0.400
0.10395 0.98 2.41974 0.21 0.300
0.51974 0.98 2.51974 0.20 0.200
0.100
0.61974 0.82 2.61974 0.19
0.000
0.71974 0.71 2.71974 0.19 0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500
14 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
15 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
16 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
17 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
18 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
D. Data baut
jarak baut baris ke-1 d1 = 30 mm
baris ke-2 d2 = 40 mm
diameter baut Dbolt = 12.7 mm
E. Beban
Momen Mu = 5.86 kN.m
Gaya geser V = 28.76187548 kN.m
sudut atap ɑ= 6.84 deg
jarak lengan momen baut baris pertama h1 = Dhaunch – d1 – tfc / 2 = 196.5 mm
jarak lengan momen baut baris ke-2 h2 = h1 – d2 = 156.5 mm
rasio h2 / h1 = 0.80
F. Kekuatan baut
tegangan tarik nominal baut Fnt = 620 Mpa
tegangan geser nominal baut Fnv = 372 Mpa
Luas penampang baut Ab = π / 4 *Db^2 = 126.68 mm2
19 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
K. Tebal las
tebal las untuk sayap profil yang dibutuhkan t1 = tfb / sqrt (2) = 4.9 mm
tebal las untuk sayap yang dipakai t1 = 5 mm
tebal las untuk badan profil yang dibutuhkan t2 = twb / sqrt (2) = 3.5 mm
tebal las untuk badan profil yang dipasang t2 = 5 mm
20 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
21 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
lebar profil Bb = 75 mm
tebal sayap profil tfb = 7 mm
tebal badan profil twb = 5 mm
Tinggi sambungan Dhaunch = 230 mm
panjang sambungan L haunch = 1 / 10 * L = 300 mm
D. Data baut
jarak baut baris ke-1 d1 = 30 mm
baris ke-2 d2 = 40 mm
diameter baut Dbolt = 12.7 mm
E. Beban
Momen Mu = 0.50 kN.m
Gaya geser V= 3.562 kN.m
sudut atap ɑ= 6.84 deg
F. Kekuatan baut
tegangan tarik nominal baut Fnt = 620 Mpa
tegangan geser nominal baut Fnv = 372 Mpa
Luas penampang baut Ab = π / 4 *Db^2 = 126.68 mm2
22 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
K. Tebal las
tebal las untuk sayap profil yang dibutuhkan t1 = tfb / sqrt (2) = 4.9 mm
tebal las untuk sayap yang dipakai t1 = 5 mm
tebal las untuk badan profil yang dibutuhkan t2 = twb / sqrt (2) = 3.5 mm
tebal las untuk badan profil yang dipasang t2 = 5 mm
23 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
24 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
D. Data baut
jarak baut baris ke-1 d1 = 30 mm
baris ke-2 d2 = 40 mm
diameter baut Dbolt = 12.7 mm
E. Beban
Momen Mu = 2.83 kN.m
Gaya geser V= 1.373 kN.m
F. Kekuatan baut
tegangan tarik nominal baut Fnt = 620 Mpa
tegangan geser nominal baut Fnv = 372 Mpa
Luas penampang baut Ab = π / 4 *Db^2 = 126.68 mm2
25 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
K. Tebal las
tebal las untuk sayap profil yang dibutuhkan t1 = tfb / sqrt (2) = 4.9 mm
tebal las untuk sayap yang dipakai t1 = 5 mm
tebal las untuk badan profil yang dibutuhkan t2 = twb / sqrt (2) = 3.5 mm
tebal las untuk badan profil yang dipasang t2 = 5 mm
26 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
Baseplate Design
1. Technical Data
dc concrete column depth = 900 mm
bc concrete column width = 500 mm
d column web depth = 600 mm
b column flange width = 200 mm
N Base plate length = 720 mm
B Base plate width = 260 mm
27 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
2. Structural data
P max. compression reaction 696.042 kN = 696,042 N
M Max. applied moment 76.113 kN.m = 7.61E+07 N.mm
V Shear force 44.067 kN = 44,067 N
f'c Concrete compressive strength = 25 N/mm2
fy base plate yield strength (SS 400) = 235 N/mm2
Fub Anchor rods tensile strength = 400 Mpa
(JIS 3112, Grade SS 400)
3. Plate Calculation
Check eccentricity
fp (max) concrete bearing strength = 21 N/mm2
fp (max) 0,65 . 0,85 f'c √( A2 / A1 )
q max maximum bearing pressure = 5,568 N / mm
fp max B
e crit critcal eccentricity value = 359.76 mm
e crit = N/2 - P/(2 B *q_max)
e actual eccentricity value, M/P = 109 mm
e < ecrit, small eccentricity case. Thereis no tendency to overturn.
Anchor rods are required for moment equilibrium.
28 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
Compute Y and T
Y = (N - 2e), when e <= ecrit = 501 mm
= (f + N/2) - ((f + N/2)^2 - 2 P (e + f) / q max)^1/2, when e > e crit
T = T (anchor rod tension) = qmax Y - P, = - N
when e > e crit
check bearing pressure
fp actual compression stress = 1.93 N/mm2
fp = P / (Y . N)
OK ≤ fp (max)
29 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
X = f - 0,95 d / 2 = 55 mm
w = bf + 25,4 = 225 mm
tp, min = √ ( 4 . T . X / (0,9 fy w) ) = 98 mm
Shear check
φ Vn = Friction between concrete and baseplate = 365,422 N
= φ u Pu <= φ 0,2 f'c Ac or φ 800 Ac
φ = 0,75
µ = 0,7, coefficient of friction
Ac = area of baseplate
Vu < φ Vn Safe
Hook Length
ld = In tension mode : = 248.2 mm
= 0,24 db fy ψe / √f'c
ψe = 1,0
Use anchor length = 250 mm
Extension length, 12 db = 264 mm
Purlin Calculation
1. Material properties
30 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
Steel section
Purlin section C 150.50.20.2.3
ht height = 150 mm
b width = 50 mm
c lip = 20 mm
t thickness = 2.3 mm
A Area = 6.32 mm2
Ix X-dir inertia moment = 2.10E+06 mm4
Iy y-dir inertia moment = 220,000 mm4
Sx X-dir section modulus = 28,000 mm3
Sy y-dir section modulus = 6,200 mm3
rx X-dir radius of gyration = 57.7 mm
ry y-dir radius of gyration = 18.6 mm
w weight per meter = 4.96 kg/m
31 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
2. Loading
Wroof Weight of roof 0.05 kN/m2
WL Roof live load (rain or wind max.) 0.34 kN/m2
Wr beban hujan, 40 - 0.8 α 0.339 kN/m2
Ww Wind pressure, P * c 0.272 kN/m2
V wind speed 33.333 m/s
P Tekanan angin, P = V^2 / 16 = 0.681 kN/m2
c koefisien tekanan angin 0.40
Checking interaction
B / 2 tf = 10.87
170 / √(fy) = 10.97
B / 2 tf < 170 / √(fy) compact
allowable stress
fbx = 0.66 fy = 158.40 Mpa
32 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
A. Penulangan Balok
kuat tekan beton f'c = 25 Mpa
kuat leleh baja tulangan lentur fy = 390 MPa
diameter tulangn lentur D= 13 mm
kuat leleh tulangan geser D= 10 mm
kuat leleh tulangan geser fyv = 240 MPa
33 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
34 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
Data Balok
Tinggi balok h= 300 mm
Lebar balok b= 200 mm
selimut beton cover = 40 mm
jarak efektif arah x d = h - cover - ϕ / 2 = 255 mm
1. Penulangan Geser
faktor reduksi kekuatan geser φ= 0.75
Gaya geser nominal Vn = Vu / pi = 7.0 kN
Kuat geser beton
Vc = 1 / 6 * sqrt (f'c) * b * d = 42500 N
0.5 * φ * Vc = 15938 N
Vu < 0.5 * φ * Vc, dan Vu < φ * Vc Pasang tulangan minimum
Luas tulangan minimum 0.062 * sqrt (f'c) * b / fy = 0.26 mm2 / mm'
0.35 * b / fy = 0.29 mm2 / mm'
Luas tulangan minimum yang dipakai Av / smin = 0.29 mm2 / mm'
spasi tulangan yang direncanakan s= 150 mm
luas tulangan per unit panjang Av / s = 1.05 mm2 / mm'
Spasi tulangan minimum
smin = Av * 1200 * fy / (75 * sqrt (f'c) * b)= 603 mm
smin = Av * 3 * fy / b = 565 mm
smin = d / 2 = 128 mm
spasi tulangan yang dipakai s= 125 mm
35 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
a) Penulangan Lentur
Perencanaan tulangan lentur menggunakan diagram interaksi kolom. Data masukan untuk
perencanaan kolom adalah sebagai berikut.
36 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
37 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
38 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
39 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
40 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
b) Penulangan Geser
1. Material
Kuat tekan beton f'c = 25 Mpa
kuat tarik leleh baja tulangan fy = 390 MPa
Diameter tulangan utama D= 13 mm
Diameter tulangan begel ϕ= 10 mm
Luas tulangan begel Av = 157.1 mm2
Kuat tarik leleh baja tulangan begel fyv = 240 MPa
2. Data Kolom
Panjang kolom by = 350 mm
Lebar kolom bx = 250 mm
selimut beton cover = 50 mm
jarak efektif arah x dx = by - cover - ϕ / 2 = 295 mm
jarak efektif arah y dy = bx - cover - ϕ = 195 mm
4. Penulangan Arah x
Gaya aksial Px = 0.3 kN
Gaya geser Vx = 7.7 kN
Kuat geser beton
Vc = 0.17 {1 + [ Nu / (14 * Ag) ] } * sqrt (f'c) * bx * dx = 62687.5168872 N
41 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
0.5 * φ * Vc = 23507.8188327 N
Vu > 0.5 * φ * Vc, dan Vu < φ * Vc Pasang tulangan geser
Luas tulangan minimum 0.062 * sqrt (f'c) * bx / fy = 0.32 mm2 / mm'
0.35 * bx / fy = 0.36 mm2 / mm'
Luas tulangan minimum yang dipakai Av / smin = 0.36 mm2 / mm'
spasi tulangan yang direncanakan s= 80 mm
luas tulangan per unit panjang Av / s = 1.96 mm2 / mm'
Spasi tulangan minimum
smin = Av * 1200 * fy / (75 * sqrt (f'c) * bx)= 483 mm
smin = Av * 3 * fy / bx = 452 mm
smin = dx / 2 = 148 mm
spasi tulangan yang dipakai s= 80 mm
5. Penulangan arah y
Gaya aksial Py = 3.2 kN
Gaya geser Vy = 8.0 kN
Kuat geser beton
Vc = 0.17 {1 + [ Nu / (14 * Ag) ] } * sqrt (f'c) * by * dy = 87762.7260332 N
0.5 * φ * Vc = 32911.0222625 N
Vu < 0.5 * φ * Vc, dan Vu < φ * Vc Pasang tulangan minimum
Luas tulangan minimum 0.062 * sqrt (f'c) * by / fy = 0.45 mm2 / mm'
0.35 * by / fy = 0.51 mm2 / mm'
Luas tulangan minimum yang dipakai Av / smin = 0.51 mm2 / mm'
spasi tulangan yang direncanakan s= 100 mm
luas tulangan per unit panjang Av / s = 1.57 mm2 / mm'
Spasi tulangan minimum
smin = Av * 1200 * fy / (75 * sqrt (f'c) * by)= 345 mm
smin = Av * 3 * fy / by = 323 mm
smin = dy / 2 = 98 mm
spasi tulangan yang dipakai s= 80 mm
42 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
43 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
2. Beban Pondasi
berat jenis beton γc = 24 kN/m3
44 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
45 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
46 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
5. Tegangan Tanah
a. Tegangan tanah akibat kombinasi beban elastis
Tegangan tanah maksimum, Qmax = Wt / Af + Mx / Wx + My / Wy
Tegangan tanah minimum, Qmin = Wt / Af – Mx / Wx – My / Wy
No. Teg. Tanah Status Teg. Tanah Status
maks. min.
kN/m2 kN/m2
ASD-LC14a 25.9 Safe 21.6 tidak ada tegangan tarik
ASD-LC12a 22.3 Safe 13.8 tidak ada tegangan tarik
ASD-LC1 21.9 Safe 19.5 tidak ada tegangan tarik
ASD-LC2 21.9 Safe 19.5 tidak ada tegangan tarik
ASD-LC3 22.4 Safe 19.3 tidak ada tegangan tarik
ASD-LC4 24.6 Safe 19.6 tidak ada tegangan tarik
47 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
48 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
49 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
6. Kontrol Guling
b. Momen guling
Momen maksimum, Mmax = 12.4 kN.m
Syarat : Momen lawan / Momen guling = 3.1 ≥ 2.0 Aman
7. Kontrol Geser
Angka keamanan untuk kontrol geser, Sf = 1.5
Gaya lawan terhadap geser, FR = W * tan δ = 14.3 kN
Berat struktur, Wtotal = Wf + Wpedestal + Wsoil + P = 47.6 kN
50 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
tan δ = 0.3
Gaya geser, Fsliding = 8.4 kN
Rasio gaya lawan terhadap gaya geser, FR / Fsliding = 1.7
Syarat : FR ≥ Sf
Fsliding
1.7 ≥ 1.5 Aman
3. Penulangan Pondasi
A. Tulangan Arah X
Jarak tepi kolom terhadap sisi luar plat, ax = (Bx – bx) /2 = 0.63 m
tegangan tanah pada tepi kolom, qx = 23.588 kN/m2
qx = qmin + (Bx -ax) / Bx * (qmax – qmin)
momen yang terjadi pada plat pondasi akibat beban, Mux = 7.916 kN.m
Mux = 1 / 2 * ax2 * (qx + 2 / 3 * (qmax – qx) -q) * By
lebar plat pondasi yang ditinjau, B = By = 1600 mm
tebal plat pondasi, h= 300 mm
tebal selimut beton, d' = 70 mm
tebal efektif plat, d = hf – d' = 230 mm
kuat tekan beton, fc' = 25 Mpa
kuat leleh baja tulangan, fy = 390 Mpa
faktor distribusi tegangan beton, β1 = 0.85
rasio tulangan dalam kondisi balance,
ρb = β1 . 0.85 . f'c / fy . 600 / (600 +fy) = 0.0281
faktor reduksi kekuatan lentur, φ= 0.8
Mn = Mux / φ = 9.90 kN.m
Rn = Mn / (b . d2) = 0.117 N/mm2
m = fy / 0.85 . f'c = 18.353
Rasio tulangan yang diperlukan,
ρ =1/m (1- √(1- 2 . m . Rn / fy)) . b . d = 0.0003005938
rasio tulangan minimum, ρmin = 1.4 / fy = 0.004
rasio tulangan yang digunakan ρ= 0.004
51 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
B. Tulangan Arah Y
Jarak tepi kolom terhadap sisi luar plat, ay = (By – by) / 2 = 0.675 m
tegangan tanah pada tepi kolom, qy = 22.515 kN/m2
qy = qmin + (By – ay) / By * (qmax – qmin)
momen yang terjadi pada plat pondasi akibat beban, Muy = 9.10 kN.m
Muy = 1 / 2 * ay2 * (qy + 2 / 3 * (qmax – qy) – q) * Bx
lebar plat pondasi yang ditinjau, B = Bx = 1600 mm
tebal plat pondasi, h= 300 mm
tebal selimut beton, d' = 70 mm
tebal efektif plat, d = hf – d' = 230 mm
kuat tekan beton, fc' = 25 Mpa
kuat leleh baja tulangan, fy = 390 Mpa
faktor distribusi tegangan beton, β1 = 0.85
rasio tulangan dalam kondisi balance,
ρb = β1 . 0.85 . f'c / fy . 600 / (600 + fy) = 0.0281
faktor reduksi kekuatan lentur, φ= 0.8
Mn = Muy / ρ = 11.38 kN.m
Rn = Mn / (b . d2) = 0.134 kN/m2
m = fy / 0.85 . f'c = 18.353
Rasio tulangan yang diperlukan,
ρ =1 / m (1- √(1- 2 . m . Rn / fy)) . b . d = 0.0003
rasio tulangan minimum, ρmin = 1.4 / fy = 0.004
luas tulangan yang diperlukan, As = ρ . b . d = 1321.03 mm2
diameter tulangan yang digunakan, D 13 mm
52 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
C. Tulangan Susut
rasio tulangan susut minimum, ρs,min = 0.0018
luas tulangan susut arah x, Asx = ρs,min . D . Bx = 662.40 mm2
luas tulangan susut arah y, Asy = ρs,min . D . By = 662.40 mm2
diameter tulangan D 13 mm
jarak tulangan susut arah x, sx = π / 4 . D2 . By / Asx = 320.61 mm
jarak tulangan susut maksimum arah x, sx,max = 200 mm
jarak tulangan susut arah x yang digunakan, sx = 200 mm
jarak tulangan susut arah y, sy = π / 4 . D2 . Bx / Asy = 320.61 mm
jarak tulangan susut maksimum arah y, sy,max = 200 mm
jarak tulangan susut arah y yang digunakan, sy = 200 mm
Digunakan tulangan susut arah x, 13 200
Digunakan tulangan susut arah y, 13 200
53 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
54 of 79
PENGADAAN PEKERJAAN KONSTRUKSI JOB NO.
TERINTEGRASI EPCC PENGEMBANGAN DAN DOC. NO. :
MODERNISASI PG DJATIROTO PGDJ-2-05-CAL-007
LAPORAN PERENCANAAN VFD ROOM DAN REV. :
AUXILIARY PANEL ROOM DATE : 14 / 05 / 2018
55 of 79
14 / 05 / 2018
56 of 79
14 / 05 / 2018
APPR.
No. Hal.
49
15
19, 21,
24
57 of 79
14 / 05 / 2018
58 of 79
14 / 05 / 2018
10
59 of 79
14 / 05 / 2018
10
20
di Djatiroto
60 of 79
14 / 05 / 2018
25 Mpa
23500 Mpa
24 kN/m3
390 MPa
61 of 79
14 / 05 / 2018
560 MPa
390 mpa
380 mpa
Mpa
MPa
MPa
Mpa
62 of 79
14 / 05 / 2018
63 of 79
14 / 05 / 2018
4.000 4.500
64 of 79
14 / 05 / 2018
65 of 79
14 / 05 / 2018
1.00
22.22
66 of 79
14 / 05 / 2018
mm2 / mm'
mm2 / mm'
mm2 / mm'
mm2 / mm'
67 of 79
14 / 05 / 2018
mm2 / mm'
mm2 / mm'
mm2 / mm'
mm2 / mm'
mm2 / mm'
mm2 / mm'
mm2 / mm'
mm2 / mm'
68 of 79
14 / 05 / 2018
‐39, fy=390MPa
‐39, fy=390MPa
Mpa
Mpa
‐39, fy=390MPa
‐24, fy=240 MPa
69 of 79
14 / 05 / 2018
‐39, fy=390MPa
‐24, fy=240 MPa
70 of 79
15.88734
kN / m2
3.2. Perencanaan Pondasi Dangkal
Dimensi Pondasi
Panjang pondasi, Bx = 3.20 m
Lebar pondasi, By = 2.05 m
Tebal plat pondasi, hf = 0.30 m
panjang pedestal arah x, bx = 0.00 m
panjang pedestal arah y, by = 0.00 m
tinggi pedestal, hc = 0.00 m
posisi kolom pedestal, (dalam = 40, tepi = 30, sudut = 20) αs = 0