Actual
Item No. Description Unit Rate Amount
Quantity
A-1 Item allow for Mobilization and demobilization . Item 50% 200,000.00 100,000.00
Site preparation, Clearing site vegetation, removing
B1-1 bushes, shrubs & top soil to a depth not exceeding 6" Item 1.00 25,000.00 25,000.00
and removing all debris away from site.
B1-2 Excavation for basement Cube 41.14 2,250.00 92,574.41
B1-3 Foundation Cube 6.80 2,250.00 15,308.48
B1-4 Column Cube 3.78 2,250.00 8,505.00
Approved hard Earth Supplying spreading , leveling
watering and manual compaction, using standard cast
B1-5 Cube 6.08 4,500.00 27,381.69
iron stamper or equivalent and filling in 150 mm thick
layers (compact volume) in restricted area.
Summary
Summary
b/f Upto DPC 1,540,950.64
b/f Upto Basement Floor 649,451.28
b/f Upto Ground Floor 17,697.59
b/f Upto Boundry Wall 187,311.04
Total 2,395,410.54