1. Introduction 3
2. Scope of works 3
3. Employees and Manpower Involve 3
4. Material and tools 3
5. Work Sequences 3
5.1 Preliminary Works 3
5.2 Survey and setting out 4
5.3 Excavation works 4
5.4 Installation and construction works 4
5.5 Testing 4
6. Safety aspects 5
7. Attachment(s) 5
1. INTRODUCTION
This method of statement describes the general guideline and arrangement for
the methodology and sequence for the drainage works within the proposed
project 4.99MWAC Ground Mounted Solar Panel at JLN Tiku Kubota Tawau
Sabah. This work statement is to outline the sequence of activities, method and
resources for the work.
2. SCOPE OF WORKS
Generally the sequence of works shall setting out, excavation work, installation
work and testing.
5. WORK SEQUENCES
5.1 PREMILIMINARY WORKS
Permit to Work (PTW) shall be submitted and approved before starting
the work.
PTW shall be kept by supervisor or placed on site.
5.5 TESTING
All testing shall be carried out based on the approved Inspection Test Plan
(ITP) or official request from Ditrolic Sdn Bhd.
6. SAFETY ASPECTS
All staffs and workers shall go through safety induction before joining the
construction work.
Safety forms shall be submitted and approved before the workers and
staffs can start working.
All staff and workers shall wear necessary Personal Protective Equipment
(PPE) once they entered the site, unless they are in the PPE free zone.
Safety toolbox meeting shall be held at least 3 times per week.
Site Supervisor shall ensure that the workers wear all safety equipment
provided.
Proper and adequate provision of temporary signage’s and barricades at
diversions and temporary haul road as necessary
7. ATTACHMENT(S)
Job Safety Analysis (JSA)
DATE: NEW
JOB TITLE: DRAINAGE EXCAVATION & CONCRETING WORKS
27/5/2023 REVISED
Job Safety LOCATION: ALL
Analysis (JSA) CONTRACTOR NAME: SUPERVISOR: AMZAR