Doc No: JSS-DSB-

PROPOSED 4.99 MWAC GROUND-MOUNTED SOLAR TAWAU-MOS-018


PANEL AT JALAN TIKU KUBOTA, TAWAU, SABAH.
Rev No : 00
Earthwork Construction Date : 5/6/2022
Page : 1

METHOD STATEMENT

FOR

DRAINAGE WORKS

JESSELTON SOLAR SERVICES

NAME DESIGNATION SIGNATURE DATE

MASAR SITE ENGINEER 9/6/2023


PREPARED BY

PROJECT MANAGER
TERRENCE WONG 9/6/2023
REVIEWED BY

ENDORSED BY

DOCUMENT STATUS

APPROVED APPROVED REJECTED,


WITH COMMENTS REVISE AND
Proceed with the works
Proceed with the works and to comply (pls. RESUBMIT
specify):

PROJECT OWNER
REPRESENTATIVES
Name Designation Signature Date
CONSULTANT
REPRESENTATIVES

JESSELTON SOLAR SERVICES SDN BHD


DOC REF NO: JSS-DSB-TAWAU-MOS-018, Revision No.
00
Doc No: JSS-DSB-
PROPOSED 4.99 MWAC GROUND-MOUNTED SOLAR TAWAU-MOS-018
PANEL AT JALAN TIKU KUBOTA, TAWAU, SABAH.
Rev No : 00
Earthwork Construction Date : 5/6/2022
Page : 2

NO. TABLE OF CONTENTS PAGE

1. Introduction 3
2. Scope of works 3
3. Employees and Manpower Involve 3
4. Material and tools 3
5. Work Sequences 3
5.1 Preliminary Works 3
5.2 Survey and setting out 4
5.3 Excavation works 4
5.4 Installation and construction works 4
5.5 Testing 4
6. Safety aspects 5
7. Attachment(s) 5

JESSELTON SOLAR SERVICES SDN BHD


DOC REF NO: JSS-DSB-TAWAU-MOS-018, Revision No.
00
Doc No: JSS-DSB-
PROPOSED 4.99 MWAC GROUND-MOUNTED SOLAR TAWAU-MOS-018
PANEL AT JALAN TIKU KUBOTA, TAWAU, SABAH.
Rev No : 00
Earthwork Construction Date : 5/6/2022
Page : 3

1. INTRODUCTION
This method of statement describes the general guideline and arrangement for
the methodology and sequence for the drainage works within the proposed
project 4.99MWAC Ground Mounted Solar Panel at JLN Tiku Kubota Tawau
Sabah. This work statement is to outline the sequence of activities, method and
resources for the work.

2. SCOPE OF WORKS
Generally the sequence of works shall setting out, excavation work, installation
work and testing.

Machinery and equipment involved in this work are as follow;


 Backhoe
 Hand tools such as shovel & scope & measuring tape.
 Dumpy level

3. EMPLOYEES AND MANPOWER INVOLVE


Employees and manpower involve for this work comprises as below;
 Machinery Operator
 Site Engineer
 Site Supervisor
 General Workers

4. MATERIALS AND TOOLS


 Ready-Mixed Concrete G25 or higher.
 600mm, 900mm, 1800mm Concrete Culvert
 BRC reinforcement, formwork for drainage

5. WORK SEQUENCES
5.1 PREMILIMINARY WORKS
 Permit to Work (PTW) shall be submitted and approved before starting
the work.
 PTW shall be kept by supervisor or placed on site.

JESSELTON SOLAR SERVICES SDN BHD


DOC REF NO: JSS-DSB-TAWAU-MOS-018, Revision No.
00
Doc No: JSS-DSB-
PROPOSED 4.99 MWAC GROUND-MOUNTED SOLAR TAWAU-MOS-018
PANEL AT JALAN TIKU KUBOTA, TAWAU, SABAH.
Rev No : 00
Earthwork Construction Date : 5/6/2022
Page : 4

5.2 SURVEY AND SETTING OUT


 The locations and level of the drainage system to the dimensions and
levels shown on the construction drawings shall be set out first.
 Surveyors shall determine the location of the sumps.

5.3 EXCAVATION WORKS


 The excavation works shall be carried out in straight line based on the
construction drawings.
 Reusable excavated materials shall be set aside for reinstatement.
 Trench width shall be kept at minimum.
 The trench’s depth shall be excavated 50mm extra to pour lean concrete.
 Any unsuitable material shall be removed and replaced with suitable
materials.

5.4 DRAIN INSTALLATION WORKS


 Two types of drain shall be constructed; Concrete drain and Earth drain
 50mm lean concrete shall be laid.
 The concrete shall be fully laid
 All drains shall be constructed true to line and level as indicated on the drawings.
 Each drains shall be checked for correct position before preparing
formwork and installing rebar
 Proper concreting method must be executed such as using vibrator
machine.
 Branches and drain line connections for future use shall be sealed off with
proper stoppers, to prevent the ingress of extraneous matter.
 Backfilling works shall not commence until the system has been
successfully tested and accepted. This shall be carried out in sections as
work proceeds.
 The backfill in trenches crossing permanent roads shall be thoroughly
compacted.
 Sump location and construction works shall be based on the construction
drawings.
 Grating shall be installed to cover the top of the sump.

JESSELTON SOLAR SERVICES SDN BHD


DOC REF NO: JSS-DSB-TAWAU-MOS-018, Revision No.
00
Doc No: JSS-DSB-
PROPOSED 4.99 MWAC GROUND-MOUNTED SOLAR TAWAU-MOS-018
PANEL AT JALAN TIKU KUBOTA, TAWAU, SABAH.
Rev No : 00
Earthwork Construction Date : 5/6/2022
Page : 5

5.5 TESTING
 All testing shall be carried out based on the approved Inspection Test Plan
(ITP) or official request from Ditrolic Sdn Bhd.

6. SAFETY ASPECTS
 All staffs and workers shall go through safety induction before joining the
construction work.
 Safety forms shall be submitted and approved before the workers and
staffs can start working.
 All staff and workers shall wear necessary Personal Protective Equipment
(PPE) once they entered the site, unless they are in the PPE free zone.
 Safety toolbox meeting shall be held at least 3 times per week.
 Site Supervisor shall ensure that the workers wear all safety equipment
provided.
 Proper and adequate provision of temporary signage’s and barricades at
diversions and temporary haul road as necessary

7. ATTACHMENT(S)
 Job Safety Analysis (JSA)

JESSELTON SOLAR SERVICES SDN BHD


DOC REF NO: JSS-DSB-TAWAU-MOS-018, Revision No.
00
Doc No: JSS-DSB-
PROPOSED 4.99 MWAC GROUND-MOUNTED SOLAR TAWAU-MOS-016
PANEL AT JALAN TIKU KUBOTA, TAWAU, SABAH.
Rev No : 00
Earthwork Construction Date : 10/10/2022
Page : 6

DATE: NEW 
JOB TITLE: DRAINAGE EXCAVATION & CONCRETING WORKS
27/5/2023 REVISED 
Job Safety LOCATION: ALL
Analysis (JSA) CONTRACTOR NAME: SUPERVISOR: AMZAR

SEQUENCE OF JOB STEPS POTENTIAL HAZARDS RECOMMENDED ACTION OR PROCEDURE


 Physically inspect work areas prior to start of work
 Follow good housekeeping practices
 Assure materials & debris do not block traffic
 Keep work areas clean & neat, free from rubbish & debris
Employee Protection  Watch where you walk.
Area Preparation
Slips, trips, falls, uneven surfaces  Be cognizant of your own safe work practices as well as those of your
co-workers
 Be careful on slopes or wet/muddy areas
 Flagmen will be utilized as required for roadway traffic (if necessary)
 Appropriate warning signs will be posted
 Use proper lifting methods, including team lifting when necessary.
Ergonomic Injury
 Use mechanical equipment whenever possible.
Impact Injury
General Material Lifting/Handling  Lift with legs, keep loads close to body, and don’t twist while picking
Back injury-muscle pulls, sprains up loads.
& strains, lacerations  Wear cut-resistant work gloves whenever materials are being
handled.

JESSELTON SOLAR SERVICES SDN BHD


DOC REF NO: JSS-DSB-TAWAU-MOS-018, Revision No.
00
Doc No: JSS-DSB-
PROPOSED 4.99 MWAC GROUND-MOUNTED SOLAR TAWAU-MOS-016
PANEL AT JALAN TIKU KUBOTA, TAWAU, SABAH.
Rev No : 00
Earthwork Construction Date : 10/10/2022
Page : 7

 Wear eye protection when using hand/power tools which cause


flying debris.
 Eye wash to be immediately available
Eye injury;
Use of hand and power tools –  Tools must be in good condition and used for their intended purpose;
Lacerations and hand injuries
General  Familiarize workers with tool operation.
 De-energize power equipment prior to changing bits or blades.
 Wear appropriate hand protection; observe good work practices in
ensuring that work gloves are in good condition.
 Wear safety goggles/glasses at all times & proper protective gloves
Electrical hazards  Face shields over safety glasses
Metal in eyes & cuts
 Use properly grounded or double-insulated tools with ground-fault
Use of hand and power tools –
circuit interrupters (GFCI);
Electric Cutting/Grinding
Improper Grounding, Improper  Inspect the electrical cords for fraying, cracks, and other damage
Operations & Maintenance before use; remove damaged cords from service
 Never daisy-chain electrical cords
General Tool Safety  Choose the right tool for the task. Inspect tools before & remove
defective tool from service

JESSELTON SOLAR SERVICES SDN BHD


DOC REF NO: JSS-DSB-TAWAU-MOS-018, Revision No.
00