BSSW3 I SW 337 – Project Development and Management

Notre Dame of Tacurong College


BS in Social Work
Lapu-lapu St., Tacurong City, Sultan Kudarat, Philippines, 9800

PROJECT PROPOSAL

CONSTRUCTION OF DRAINAGE CANAL


(Project Title)
Proposed by:
GRETCHEN L. GREGORY

Project Goal:

Project Location: Barangay New Isabela, Tacurong City, Province of Sultan Kudarat

No. of Target Beneficiaries: 2, 081 households and 10, 182 residents

Total Project Budget: 3, 500.000.00

I. SUMMARY

The area for the construction of drainage canal system is the Barangay of New Isabela of Tacurong
City. The completion of the project will redound to the realization of a well-planned and aptly
functional network of drainage systems in the Barangay New Isabela. It shall reduce the risk of
infestation of diseases such as malaria and dengue as well as the heavy traffic in streets caused by
stagnant, grimy canals and overflowing water. The resulting favorable conditions of drainage
systems will encourage the growth of entrepreneurial activities in the Barangay New Isabela.

The construction of lined canal in every streets of Barangay New Isabela is an important
infrastructure intervention necessary to reduce potential risk and hazard caused by flooding. The
canal to be constructed will serve as a catchment of storm/rain water that will eventually flow to
drainage canal in every streets.

Upon the completion of the project, the residents of the community, Barangay Council the owner
of the boarding house and establishments are expected to assist in the maintenance of the canal.

II. PROBLEM ANALYSIS

During heavy rains, storm water in Brgy. New Isabela accumulates which causes the
unclean water and silts enters the residential houses in the area.
BSSW3 I SW 337 – Project Development and Management

The flood in this area during heavy rains is a nuisance for the habitants and the
causes delays and etc. And there is a case that when the ponds near the village
overflows cause by heavy rains, the water from the pond tends to cause flooding
because there’s no drainage between the roads.

This project intends to have an adequate design of storm drainage to prevent the
village from being flooded.

III. PROPOSED RESPONSE TO THE PROBLEM

The implementation of this drainage system is to provide well designed storm water
system for the discharge of rainwater and intends to have an adequate design of
storm drainage to prevent the village from being flooded.

IV. PROJECT DESCRIPTION

New Isabela is a Barangay in the city of Tacurong. Barangay New Isabela is situated in the southern part
of Tacurong City. It is bounded by Barangay Poblacion in the north, Barangay Calean in the south,
Barangay EJC Montilla in the west, and Barangay New Carmen in the east. Barangay New Isabela has a
total population of 10, 182 residents, and has 2, 081 households not included the tenants of the
boarding house and the workers of different establishments.

In addition,

Over-all Strategy and Sustainability

Achieving a sustainable rural infrastructure project is a key to poverty alleviation. Furthermore,


community organizing and the active participation of beneficiaries and other stakeholders in various
activities during project planning and implementation can encourage sustainability in the realization
of the project.
Once completed, the project shall be turned over to Barangay New Isabela through the Barangay
Council. For the sustainability of the project, the City Local Government Unit thru the City
Engineering Office shall ensure that Detailed Engineering Design and Specifications are carefully
BSSW3 I SW 337 – Project Development and Management

followed during the construction phase. Maintenance of project after completion will be shouldered
by the City Government through its Economic Development Fund.
With the improvement in the drainage system, it is expected that the community as well as the
Barangay Council will take responsibility in its maintenance.

Project Risks and Mitigation

Lack of budget fund is the common reason that hinders the implementation of the said project.
Furthermore, the disapproval and lack of cooperation of the government as well as the residents of
the said municipality is another thing that hinders the implementation of the project. The
construction of this project is vulnerable due to possible environmental calamities to happen and
due to the present situations on areas along riverside which will extremely affects the cooperation
of Local Government Unit of Tacurong. Money, on the other hand, is a crucial matter to be
considered since this project is pretty much expensive which can hinder its implementation. The
project is expensive but its future effects to the community is worth the investment.

Opportunities for Funding

V. PROJECT PLANNING MATRIX

OBJECTIVES ACTIVITIES TIME FRAME OUTCOME IMPACT

VI. BUDGETTARY REQUIREMENTS

MEANS OF
ACTIVITIES BUDGET OUTPUT VERIFICATION
1. Conduct of
drainage
BSSW3 I SW 337 – Project Development and Management

assessment and
community
consultation.
2. Preparation and
submission of
Project Proposal
, program of
Work and
detailed
Engineering
design.
3. Preparation,
submission and
approval of
other necessary
materials.
4. MOA signing
and transfer of
fund.
5. Project
Implementation

VII. ORGANIZATIONAL STRUCTURE AND ITS FUNCTIONS

Office/Staff Responsibilities Contact Contact

Designated Person Details

LGU Tacurong Approval and Funding Municipal Municipal

Engineer Office,

Tacurong City
DPWH Testing and monitoring Project DPWH Isulan,

Engineer
RELY construction Contractor/Implemento Project Buhangin,
BSSW3 I SW 337 – Project Development and Management

and supplies r Engineer Davao city

VIII. PROJECT MONITORING AND EVALUATION

Clearing and Grabbing


Clearing and grabbing is the primary thing to be done before starting any
survey on the target area.
Surveying the Target Area
In order to know the elevation of the target area, profile surveying of the area
is to be done and the data gathered is to be plot and to be analyzed.
Excavating the Soil of the Target Route
Excavation is to be done using bulldozer, grader, and other necessary
equipment. The soil is to be excavated within the desired designed elevation .

Compacting of Soil
Prior to installation of materials, soil will be compacted first using
jackhammer.
Installing of Materials
Installation of the materials such as RCPC shall be done in a proper and
careful manner.
Filling of Soil
Soil should be put every 20 centimeter of the excavation height and will be
compacted and the process is to be done continually until the RCPC is
completely covered and compacted.
Leak Testing
Finally, the finished constructed drainage will be subjected to leak testing
to be conducted by the Department of Public Works and Highway (DPWH). If
there’s a leak within then the finished drainage should be reconstructed until
the system will pass the leak test.
BSSW3 I SW 337 – Project Development and Management

SUPPORTING DOCUMENTS:

 Problem Tree Analysis


 Stakeholder Analysis
 The Calendar / Gantt Chart

 Critical Path Method