OCTOBER
2021
TOTAL SAFE MANHOURS
275 OF
547 ACHIEVED ON PROJECT
WEATHER STATISTICS
24
DAYS DURATION
785,290 23.2 MM RAINFALL
REHABILITATION & IMPROVEMENT OF THE 2x2 NATIONAL ROAD RN1 from KP 24 to KP 40 AND 2
WAYS from KP 40 to KP 105 ON THE BASIS OF an EPC contract In Gabon
WEEKLY PROGRESS REPORT 39 (18th October 2021 to 24th October 2021)
NAVIGATOR
WEEKLY UPDATE PROJECT STATUS
START
Monday SURVEY WORKS GEO TECHNICAL MOBILISATION
FINISH
Monday
COMPLETION FOR
NTP FOR SEGMENT 4
PROJECT NTP FOR NTP FOR
CONSTRUCTION 22 FEB 2022
COMMENCEMENT CONSTRUCTION CONSTRUCTION
FOR SEGMENT 4 FOR SEGMENT 5 &6 FOR SEGMENT 1 &3
DATE- 22 JAN OVERALL PROJECT
22 MAR 2021 22 JUN 2021 22 SEP 2021
2021 COMPLETION DATE-
22 JUL 2022
NTP FOR
NTP FOR
DETAILED
DETAILED
DESIGN FOR
DESIGN FOR
SEGMENT 4,5 & 6
SEGMENT 1, 2 & 3
- 22 JAN 2021
22 APR 2021
2021 2022
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18
NAVIGATOR
WEEKLY UPDATE KEY HIGHLIGHTS OF THIS WEEK
KEY HIGHLIGHTS :
NAVIGATOR
WEEKLY UPDATE DESIGN SUBMISSION TO CICO
CHAINAGE WISE DELIVERY SCHEDULE
Submitted
1 GEOMETRIC SUBFOLDER Approved Approved NA 28-Oct-21 10-Nov-21
18-Oct-21
Submitted
2 HYDRAULIC SUBFOLDER Approved Approved NA 30-OCt-21 15-Nov-21
19-Oct-21
NAVIGATOR
WEEKLY UPDATE DESIGN SUBMISSION TO SAG
CHAINAGE WISE DELIVERY SCHEDULE
Submitted Submitted
1 GEOMETRIC SUBFOLDER NA 28-Oct-21 05-Nov-21 20-Nov-21
14-Oct-21 14-Oct-21
Submitted Submitted
2 HYDRAULIC SUBFOLDER NA 29-Oct-21 05-Nov-21 20-Nov-21
20-Oct-21 20-Oct-21
NAVIGATOR
WEEKLY UPDATE SAFETY REPORT
DESCRIPTION UOM THIS WEEK CUMULATIVE
TOTAL MANHOURS MH 36,170 785,290
SAFE MANHOURS MH 36,170 785,290
TOOLBOXES TALKS NOS 79 815
HAZARDOUS INCIDENT NOS - -
LOSS TIME INCIDENT NOS - -
OBSERVATION OPEN NOS 1 1
DEFENSIVE DRIVING TRAINING FOR
OBSERVATION REGARDING
DRIVERS.
OBSERVATION CLOSED NOS 16 201
NAVIGATOR
WEEKLY UPDATE MACHINERY MOBILISATION STATUS AND SCHEDULE
DESCRIPTION OF PLANT &
S.NO CAPACITY PLAN MOBILISED BALANCE EXPECTED TO REACH
MACHINERY
1 EXCAVATOR 20/30T 8 8 -
2 CRAWLER BULL DOZER D6 2 2 -
3 MOTOR GRADER 120 K 5 5 -
4 SOIL COMPACTORS 10T 6 5 1 2ND WEEK NOV’21
5 TRACTOR DOZER 75 HP 2 2 -
6 DUMPERS 25/40T 66 57 9 LAST WEEK DEC’21
7 STONE CRUSHER 250TPH 2 1 1 LAST WEEK DEC’21
8 WHEEL LOADER 2.1 CUM 6 5 1 2ND WEEK NOV’21
9 BACKHOE LOADER 0.3 CUM 4 3 1 2ND WEEK NOV’21
NAVIGATOR
WEEKLY UPDATE MANPOWER STATUS AND SCHEDULE
EXPATS NATIONAL
S.NO MANPOWER
MEN WOMEN MEN WOMEN
1 PROJECT MANAGER 1
2 QS, CONTRACTS , AND PLANNING 5
3 QA/QC TEAM 5
4 DESIGN TEAM 1
EXECUTION TEAM ( ROAD & STRUCTURE)
5
5.1 ROAD 7
5.2 STRUCTURE 4
6 ENVIRONMENT ENGINEER 1
7 HEALTH & SAFETY ENGINEER 2 2
8 STORE & LOGISTICS 4
9 DOCTOR/NURSE 1 1
10 CPE TEAM 7
11 SURVEY TEAM 2 3
12 ACCOUNTS 2
13 ADMIN & IT 5
14 DOCUMENT CONTROLLER 1
15 EXECUTION FOREMEN & SUPERVISOR
15.1 FORMEN 11
15.2 SUPERVISOR 9 1
16 OTHERS
16.1 OPERATOR 46 18
17 CRUSHER OPERATION STAFF 40 11
18 SKILLED /UNSKILLED WORKFORCE 0
18.1 MASON 30
18.2 CARPENTOR 6
18.3 STEELFITTER 14
18.4 WELDER 5 1
18.5 HELPER 371 14
TOTAL
NAVIGATOR 153 0 462 16
WEEKLY UPDATE MANPOWER STATUS AND SCHEDULE
NAVIGATOR
WEEKLY UPDATE MATERIAL PROCUREMENT STATUS AND SCHEDULE
MATERIAL PROCUREMENT
10 STEEL MT 21.354 27 48 10 10 12
12 ADMIXTURE MT 18 18 17 5 2
NAVIGATOR
WEEKLY UPDATE LOOK AHEAD PLAN- 4 WEEKS
LOOK AHEAD PLAN
OCT-21 NOV-21
COMPLETED TILL
S.NO ACTIVITY UOM SCOPE BALANCE % TO FROM SIDE LENGTH TO FROM SIDE LENGTH TO FROM SIDE LENGTH TO FROM SIDE LENGTH
LAST WEEK
1 C&G KM 25 21 4 84% 71000 73000 LHS 1000 71000 73000 RHS 2000 73000 75000 RHS 1000 73000 75000 LHS 1000
500 1000 500 500
52+500 54+000 RHS 1500 54+000 54+400 RHS 400 67+000 68+000 RHS 1000 68+000 69+000 RHS 1000
2 EMB TOP KM 25 20 5 80% 66+000 67+000 RHS 1000 54+900 56+200 RHS 1300
64+200 65+000 RHS 800 65000 66+000 RHS 1000
1650 1350 500 500
52+500 54+000 RHS 1500 54+000 54+400 RHS 400 67+000 68+000 RHS 1000 68+000 69+000 RHS 1000
3 LATERITE KM 25 17 8 68% 66+000 67+000 RHS 1000 54+900 56+200 RHS 1300
64+200 65+000 RHS 800 65000 66+000 RHS 1000
1650 1350 500 500
EME 0 0 61200 64200 RHS 3000 61+200 64+200 LHS 3000
4 (SHOULDER) KM 25 8.7 16.3 35%
0
1500 1500
61+200 64+200 RHS 3000 61+200 64+200 LHS 3000
5 EME (MCW) KM 25 5 20 20%
51+000 52+000 RHS 1000
0 0 2000 1500
56+200 58+200 LHS 2000 58+200 61+200 LHS 3000
6 BBME KM 25 25 0
56+200 58+200 RHS 2000 58+200 61+200 RHS 3000
2000 3000 0 0
56+091 56+154 LHS 65 58+749 58+789 RHS 40 59+652 59+791 LHS 139 62+977 63+150 LHS 200
59+801 59+960 LHS 159 62+900 63+150 RHS 280
TRAPEZOIDAL
7 RMT 7776 2000 5776 26% 58+437 58+471 RHS 35 56+504 56+320 RHS 184 63+412 63+472 RHS 60
DRAIN
58+749 58+788 LHS 40 0 63+874 64+045 LHS 170
NAVIGATOR
WEEKLY UPDATE SUPPORT REQUIRED
SUPPORT REQUIRED:
Contractor expressed its dissatisfaction against CFA payments received against Euro payments
from Milestones 2, 3 & 4 and waits for Euro payments. The received CFA payments against Euro
components are being returned back which again transferred by SAG in CFA on 08th Oct 2021.
Intervention in expediting VISA process for expats.
Facilitation for royalty exemption for the earth, laterite and sand being project of national
importance as per taxation rules of Gabon.
Expediting land handing over for construction operation at site to the extent required for safe
and smooth execution .
KEY HIGHLIGHTS
NAVIGATOR
WEEKLY UPDATE SITE PHOTOS
EME works is in progress at PK 59 on RHS EME works is in progress at PK 60 on LHS Culvert Head wall works completed at PK 65