4.2 TRACKWORKS
4.2.1.2 SPK to Salak South (CH 389.508 – CH 395.160) – Down Main Line
4.2.1.3 Kepong Sentral – Simpang Batu (CH 375.802 to CH 383.300) – Up Main Line
• Dismantling existing track from CH 375.862 – CH 376.557, CH 377.455 – CH 379.770 Up Main
& CH 0+020 – CH 0+770 Up Loop.
1
PROJEK MENAIKTARAF KEMUDAHAN INFRASTRUKTUR LANDASAN KERETAPI BERKEMBAR ELEKTRIK DILEMBAHKLANG
(KLANG VALLEY ELECTRIFIED DOUBLE TRACK -KVDT)
CONSULTANT SITE SUPERVISION REPORT FOR THE MONTH OF SEPTEMBER 2022
1. Preparation additional
sample for
qualification ITC
fatigue test
2
PROJEK MENAIKTARAF KEMUDAHAN INFRASTRUKTUR LANDASAN KERETAPI BERKEMBAR ELEKTRIK DILEMBAHKLANG
(KLANG VALLEY ELECTRIFIED DOUBLE TRACK -KVDT)
CONSULTANT SITE SUPERVISION REPORT FOR THE MONTH OF SEPTEMBER 2022