B. Required Modifications
span. Place the work plane on the grid of the beam you are working on and use the under the
Rebar tool to place the rebars between two different locations along the beam. Select the appropriate
Placement Orientation tool, i.e. Parallel to workplane for longitudinal rebars and Vertical for stirrups.
Remember that longitudinal rebars from a beam extend into the columns, while stirrups terminate at
the face of the column.
Approximate dimensions are shown below for the 300x600m beam on Grid D. Note the approximately
300m overlap between 3N25 negative rebars and 4N25 positive rebars. You have to make the
necessary adjustments for the shorter beams on Grid C and Grid H. Keep the same 300 mm overlap
between 3N25 negative rebars and 4N25 positive rebars.
2022 Semester 1, FH Page 3
Curtin University
School of Civil and Mechanical Engineering
The owner wants to have a staircase added. Hence, a void has to be created on the Second Floor slab.
Adjust the boundary of the Second Floor slab and its area rebars as shown below.