1. TYPE :
Buildings Roads
2. INSPECTION TIME :
Zone
3. LOCATION :
4. INSPECTION
● First
5. DESCRIPTION OF WORKS :
CONSTRUCTION QUA
SIGNATURE
NAME
POSITION
DATE
7. COMMENTS :
Inspection Status :
NONO (Approved) NONOC-C (Approved with Comments)
CONSTRUCTION QUA
SIGNATURE
NAME
POSITION
DATE
Name:
Signature:
Approval shall not relieve the Contractor of his liabilities under the Contract or constitute authorization of any changes to the Co
Mechanical Engr.
muter Railway Extension Project
neering Work for Depot Building Including Related
last
(Contract No : NSCREX-03-N05)
Infrastructure ✘ Others
DATE :
Road Stations/Nodes
Second Third
REV. REMARKS
Electrical Mechanical Others
QUALITY ENGINEER
QUALITY ENGINEER
Date:
Cancelled
North-South Commuter Railway Extension Project
CP N-05 : Building and Civil Engineering Work for Depot Building Including Related
Infrastructure and Track Work Ballast
(Contract No : NSCREX-03-N05)
INSPECTION REPORT
TOWER CRANE ERECTION CHECKLIST
LOCATION: REPORT NO: DATE:
TOWER SECTION
All mast section components must be free from dents, deformation and no twist. HP RI RI
Pins on the connecting joints must be properly fitted and not loose. HP RI RI
FINAL ACCEPTANCE
Final inspection of TOWER CRANE ERECTION by 3rd party HP WP WP
OTHER REMARKS:
INITIALS REFERENCE BOX : (WRITE DOWN YOUR INITIALS AS SIGNED ABOVE AND NAME)
SIGNATURE
NAME
POSITION
DATE:
CONSTRUCTION QC
ENGINEER
POSCO E&C
INSPECTION REPORT
PLUBMING AND SANITARY SYSTEM INSTALLATION CHECKLIST
LOCATION: REPORT NO: DATE:
Check the installation of anchors, brackets, hangers and supports as per drawing HP HP HP WP RI
Check and ensure that installation are as per approved drawings and manufacturer
recommendation HP HP HP WP WP
Check after installation of pipe are free from crack and damage HP HP HP WP WP
Check section of the pipe to be tested are fully completed, Ensure that free from physical
defects and connection are remidied HP HP HP WP WP
Check both end of the pipe section are full plugged and blanked
HP HP HP WP WP
Check section of the pipes under testing for any leaks at the joints HP HP HP WP WP
FINAL ACCEPTANCE
Final inspection of PLUBMING AND SANITARY system installation HP HP HP HP HP
OTHER REMARKS
INITIALS REFERENCE BOX : (WRITE DOWN YOUR INITIALS AS SIGNED ABOVE AND NAME)
SIGNATURE
NAME
POSITION
DATE:
CONSTRUCTION QC CONSTRUCTION QC
ENGINEER
SUBCONTRACTOR POSCO E&C