RCDC-CPR-195-001

CONCRETE POURING REQUEST

PROJECT : CONTRACTOR :
LOCATION : BUILDING IDENTIFICATION :
CLIENT : SCHEDULE OF CONCRETING :

CURING STARTS ON: CURING COMPOUND TO BE USED:


DATE : CURING ENDS ON:

LOCATION GRAVEL REQD. REQ. DAYS COMPUTED


STRUCTURE MARK COMP. STRENGTH
(Grid Line) SIZE SLUMP OF CURING VOL. CU.M.

REQUESTED BY :

CONTRACTOR'S FIELD ENGINEER CONTRACTOR'S PM/CM

CONFIRMATION
PARTICULARS CONTRACTOR CHPBCC REMARKS / COMMENTS
SURVEY [ Line & Grade ]
FORMWORKS/SCAFFOLDINGS
REINFORCEMENT
ARCHITECTURAL WORKS
ELECTRICAL WORKS
MECHANICAL WORKS
FIRE PROTECTION WORKS
SANITARY / PLUMBING WORKS
ALUMINUM & GLASS
ANCHOR BOLT SETTING
WATERSTOPS
OPENING / BEAM PENETRATION
SHEAR BARS / SHEAR KEYS
CONSTRUCTION JOINT
EXPANSION JOINT
SEISMIC GAP
POURING GUIDE
CAMBERS / CHAMFERS
DRIP MOULDS
BLOCK SPACERS
CLEANING
GROUT
OTHERS, PLS. SPECIFY

EQUIPMENT TO BE USED :

RECOMMENDING APPROVAL : APPROVED :


NOTICE : This Concrete Pouring Request should be
submitted to CHPBCC at least twenty
four (24) hours before the DATE / TIME SITE ENGINEER - CHPBCC CHPBCC CONSTRUCTION MANAGER
schedule of concreting works with attached
key plan showing the structure for concreting.
DATE DATE