You are on page 1of 10
oreo Reng RIZHLE CONSTRUCTION & DEVELOPMENT CORP. DESIGNER. PROJECT MANAGER, CONTRACTOR (0632-5221989 Raiceuee: redc-symfonikamias]@gmailcom SUBCONTRACT AGREEMENT THIS AGREEMENT, made this 9th day of November, 2020, by and between RIZHLE CONSTRUCTION AND DEV'T CORP. of Cavite City hereinafter called the Contractor and Mr. Amor ‘Chaves of Block 45 Everlasting St. Brav. Sta, Ana, Taytay. Rizal hereinafter called the Subcontractor. messed, That for the consideration hereinafter named, the said Subcontractor agrees with said Contractor, as follows: SECTION 1: The Subcontractor agrees to furnish all labor, material, necessary to perform and complete all the work for (Project Description) As described in Section 2 hereof, and in accordance with the drawings, General Conditions of the Contract, Supplementary General Conditions, specifications and submitted Cost Proposal including area and cost breakdown, prepared by Mr. Amor Chavez. SECTION 2: Scope of Work: ‘The Subcontractor agrees to promptly begin said work a day after RCDC’s notification by said Contractor, and complete all work as follows: Com plete installation and grouting works of Balcony (floor), Toilet & Bath (floor and partial wall) tiles and Daily Hauling of Debris from 15 to 19% floor of Symfoni Kamias 1 Project in accordance with this Agreement. (Work Description) SECTION 3: The Subcontractor shall také out and pay for Employers’ Liability Insurance and Public Liability and Property Damage Insurance, certificates of same to be deposited with the Contractor before any work is started; also pay forall state andior taxes, assessments, Unemployment Compensation Contributions or other charges, and acquire and pay fornecessary permits and/or licenses to do business as required by law. SECTION 4: No extra work, back charges or changes under this contract will be recognized or paid for, unless agreed to in writing by the RIZHLE CONSTRUCTION AND DEVELOPMENT CORP. (Contractor) ‘and Mr, Randy Luceno (Subcontractor) before the work is done or the changes made, Verbal agreements will not be honored by either party, SECTION 5: This contract shall not be assigned by the Subcontractor without first obtaining permission in writing from the Contractor. The Subcontractor shall be responsible for performance of work by his employees, agents or his Subcontractors, and the Subcontractor agrees to bind his Subcontractors to all provisions of this agreement. SECTION 6: Mr. Amor Chavez (Subcontractor) agrees to be bound by all terms and conditions of all provisions of the General Conditions of the contract. Insofar asthe provisions of the General Contract do not conflict with specific provisions herein contained, they, and each of them, are hereby incorporated into this Subcontract as fally as if completely rewritten herein. ‘The Mr. Amor Chavez (Subcontractor) agrees to be bound to. the RIZHLE CONSTRUCTION AND DEV CORP. (Contractor) by all terms of the General Contract applicable to this Subcontract, and to assume toward Contractor, with respect to the work and all operations of Subcontractor on this construction project, all the obligations and responsibilities that Contractor by the General Contract assumes toward Owner. The Subcontractor agrees that it will so peeform this subcontract as not to violate any terms, covenants or conditions of the General Contract. The relationships of the Subcontractor hereunder toward Contractor shall be the same as that of Contractor toward the Owner tinder the General Contract, and the relationship of the Contractor hereunder to the Subcontractor shall be the same as that of the Contractor under the General Contract. XK SECTION 7: The Subcontractor and Contractor agree to observe and comply with all applicable, local laws, ordinances, rules, and regulations, including but not limited to the Occupational Safety and Health Act of 2018 / RA 11058 effective where the work under this Subcontract is to be performed. SECTION 8: The Subcontractor agrees to indemnify and save harmless the Contractor from any and all loss or damage (including, without limiting the generality of the foregoing, legal fees, and disbursements paid or incurred by the Contractor to enforce the provisions of this paragraph), occasioned wholly or in part by any negligent act or omissions of the Subcontractor or that of anyone directly or indirectly employed by ‘them or performing the work of this Subcontract under the direction of the Subcontractor or anyone for whom acts any of them may be liable in carrying out the provisions of the general contract and of this Subcontract regardless of whether or not itis caused in part by a party indemnified hereunder. SECTION 9: Special Conditions: (Insert the word “None” OR the Special Conditions.) Note: All Special tions must be INITIALED by both partis. Con: IN CONSIDERATION WHEREOF, the said Contractor agrees that they will pay to the said Subcontractor, in Five (§) weekly payments, the sum of Seventy Thousand Pesos (P 60,000.00) for the said labor only contract, 10 percent (10%) will be deducted as retention fee for every weekly billing on the labor incorporated by Subcontractor in the work on the job site in an acceptable manner pertaining to MKCPDCC’s Functionality Test approvals and retention willbe released once RCDC obtained TPVDC (TOA) FCO approval for every floor, Weekly payment which the said Contractor shall pay to the said Subcontractor within fourteen (14) days after the final acceptance of the Subcontractors work by the Architect-Engineer- Contractor-Owner (circle which one is applicable) and said Subcontractor shall have submitted satisfactory evidence that all obligations have been paid, and said Subcontractor has filed all necessary Sales and Use Tax report forms and any other required documents. ‘The Contractor and the Subcontractor for themselves, their successors, executors, administrators and assigns, hereby agree to the full performance of the covenants of this agreement. IN WITNESS WHEREOF, they have executed this agreement the day and date written above. DATE sicnep:__//~ 20 — 2020 CONTRACTOR: Rizhle Construction and Dev't Corp. Signature: SUBCONTRACTOR: ~ ANE SHORR TH BEFOW. uname: Atmos _C é 2 it Signature: fafa, = nee ATTY, JOSE FLPROPICRISOLOGO AGE NO Notay Pubic Until December 34, 2024 : i 023 UP Liane 0, LA OdbB MCLE VI-0017282 Vain antl 4-44-2022 “ha ho rem in tN ND. Alt-yb ae ye FTN a eta dots le” wa RECEIPT C-nate has No. the sum of pesos as payment for. P [pe DATE: November 05,2020 PROJECT: — SymfoniKamias | ATTENTION: — Arch. Paul D. Perez Project Manger Rizhle Construction SUBJECT: Cost Proposal for Tiling Works (Labor only) Dear Sir, We are pleased to submit our here our Cost Proposal in you good office fer the supply of Labor and supervision for the construction of the above-mentioned project ‘Terms and Condifions: + The client shall provide approved shop drawings. + Consumable materials should be supply by the owner. Payment terms: + Weekly progress billing Scope of work: TILING WORKS 1. T&B (30 X 30) floor and wall —250 per sqm 2. Balcony (30x30) floor - 250 per sqm. Should there be any further clarifications, kindly contact the undersigned. We thank you for your kind consideration of our offer and lock forward of your acceptance. EN ee Cees 04494904889 / 07642945186 Plock 45 Bverlashie, Si. Bray. Slo, Ana Toutoy Rizal os'tZs'6 OSs ZPt WioL sca {eea (00S ost (00°SE0% ose we Se ZANT ‘00S 0sz 00°SE0% 0s we St @ZLINA 00°SE07% 0st +18 ST ZC LINA O0'SEOT ose wre vst 97 INA oszzo7% 0st COR ove S7LINA oorsseT ose wel wet v7 LNT 005 4 Os 796 T ose SoZ sez [oss €Z LIND SbL ost Os rye ose 6L6 eet | 089 7z_LIND oszste ost 198 ie [oes TZLINN (00S 0st ONSET ose we vst | oss oz LNA ONSET Osz wre vst [oss 6t LNT 00S xd (00'SEO'% ost we vse 09's __ st iiNn (00S ost O0'SEOZ ose we vst [oss ZT LIND S29 ost Os ZteTt ose iL ie | oer OT LINA OS ZT ost 658 ez [oes ‘ST LIND (00S Ose O0'SEOZ ose we vse | 09S ELINA (00S osz Oo'sE0% osz v8 se | 09'S ZLINA (00S Ost OOSEOe ost we vst [ors TELINA (00S ose (00°SE0% ose we vst [ors ‘OT LINA (00S 4 O0'se0% Ost we vst | 09's 61iN 00 SEO™ ost wre vst | 09s @ LIN S759 ost OS COLT ost S0% Sct [oev ZAIN (00S ost 00'SE0% ost v8 vst | ors ‘94INA 005 ose OOSEOT Ose we vse | 09S SINT (00'SE0% ose v8 vst | 09s €1iNA (00S ost Ooseo% ost we vse [09s ZANT a ost 00st z ost 098 EE 06'S TAUNA ANNOWY “L JOS Yad (d)| WOSTVLOL TNAVuNomen 0s 20% OS LbT'SS ede ‘WLOL (00S. Ose OO SE0% ose wre we | ors 6c LINN (00S ose OO SEO ose wre wz | ors 87 LIN (00SE0% ost we vse [ors ZINA 00s ose 00'se0'% ost v8 wee | oS oz LIN os eeo%e ose oe eve [os S7.LINT OOss6T 4 wz zez__ [oss ve LIN (005 ‘05z 0s 756T ose Sez sezt__[oss CLINT ‘SbZ ose artaad ose ee eet | ors ZINA os 7st e ‘Ose 138 Tet | 065 TZLINN OO SEO™ ose wre vse | ors Oz LNT ‘00°se0% os we vse | 09S 6T LIND O0'SEOT 0s we vse | ors ST LINN OO SEOT ose wre vse | os ZELINT S29 ose 05 216 T ose OL “eee ‘OT LINA OS LOT e 0st ose eot__| 06s ST LINA 00s 0sz 00 SEO 4 wre vse [09s vr LIND 00'SE0e 0st we we [os ELINA, (00S ose Oose0% ost wre we [ors TE LING (00'SE0'% ose we vse | 09s OL LINA (00S 0st OO'SEOT (ose we vse | 09s GANA, O0'SE0'% Os ore vse [ors Sinn 5259 057 OS Z9LT (052 ‘SOz St [oer ZINA OOsEO™e Ose ve we [09s ‘SINT 00s 4 oose0% ose wre vse [09s SaiNA | onse07% ose we we [07s €1iNO 00s ose 00% O0'sE0% ose ws vse [ors ZLINT (00S osz 00% oo0st'z 052 098 Zt 06s TLINA Annowv “1 [wos 43d (4) AINNOWY “L 4OOTd ANN TWILNaaISaa INNOWVWIOL | 0s°720'4 OS*LvT'SS ‘WLOL (00S Ose aoe | oo'se0% 0st we vse [oss 67LINT 00s 0st oo% | 00SE0'e 0st we vse [oss @71INN | 00'se07 osz wre wee [09s Z@AiNA 00s ose 00% | 00sE0'e osz we we [oss T 9c LIN = Os 7207 ost aos oz [oss S7LiNn osz eZ wee [oss vz LNA 00s 4 rd SBZ sez [oss ez linn StL ose 0st el ez | 089 zzLiNn 0st we e_ | 06s TZLINT ose we we [09s - Oc LINA 0sz a vst | 09s 6t LIN 0st we weet | 09s ‘ST LINA 0sz wre we | 09s ZC LNA S29 osz sz Bz ue | 06 ot LNA sz oe ere [065 STLINA ‘00S ose sz wre vse [095 vTLINA sz wr8 vst | 09s LLIN 005 082 osz we vse | ors TE LINA 087 ore vse [oss OF LNA ‘005 4 sz ore we [ors 61INT ‘ose vrs we [ors SiN 5759 ose ost SOL Sct (fort ZANT 05z we wz [oss ‘OAINT 00S o5z sz we vez | 09s SINT. oz we we [09s LIND 005 052 Ei ZINA TINA INNOWW “L INOS wad (d)] WOS WiLL AINA TWLLNaaISaU [oszzo7z OS LOT'S WLOL ‘00S 0st O0'se07 0st we vse | o7s 6Z LIND ‘00S 0st OO'sEOT 0st v8 wt [ors 87 LIND O0'SEOZ 0sz we vst | ors ZZAiNT 005 osz O0'se07 osz ore vst [09s 9c LNT, os zzz ose oe ore [ors S7.LINA 00'ss6'T id yd wee [oss Pz LIND 00s 0st 05 796T 0sz SEZ sez joss | _ €ciinn SbL 0st Os Zbyz 0st 626 t_ | 089 Linn oszstz 057 198 Tet | 06S TZN OosE0z 0sz ore vse [09s Oz LNA OsE0% od wre vse | ors 6t LNA, Oorse0z 057 wre vst [09s SELINA OO'SEOZ 087 aa vse | oss ZTiiNn sig 052 Os Zt6T 0st oz e__| oer ‘ST LINA OS TZ sz 658 ee [oes ‘ST LINT 0s 0st ‘O0'se07 ost v8 vst [oss ELINA Oo'sE0z sz we vse [ors ZINA 00s sz Oo'seoz ost ore vez [ors TE LINA OOSsEOZ ost wre wee [ors Or LNA 00s ose O'sEOe 0st ore vse | 09s GLINT, OO'SEOT ost we vse | o9s Sunt e759 052 OS LT 0st SOZ sce [oer ZAINA OO SEOT ost wre we [ors SINT 00s sz oo% _| O'SEOZ Ost ore vez [09s SAINT = [oose0% osz we we [ors | €1INN 00s ose oe | OO'SEO™ ost wre vse [09s ZLINA, 00s Ost 00% | OUSTZ 0st os Zz__[ 06s TLINA INNOWW L Ios vad (a)] WOS TOL Rae eeeee INNOWY WLOL OS ZZ00r OS ZPTSS WIOL (00S OO'SEOe wee we [oss Ga ‘00s 0st OosE0% ose wre se | ors ‘@z1iNA (00S ose OOSEOE ost we vst [ors ZINA ‘00s ost Oose0% osz we vse [ors 9c LIND ostz0e ost 08 eve | ors SZLINT 00'ss6'T 4 wee zez__ [oss vz LINT (00S ose Os 796T os s8Z sez [oss €ZLINN Sel ose Os Lwre Ost 6L6 eee | oro zz Linn oszste 0s 198 tLe | 06s TZLiNn O0SE0% osz we we [ors Oc 1INA (00SE0%e ost wee we [ors @rAiNA (00S ose O0SEOe ost wre vst [ors ‘BT LINA 00s ose OosE0e ost we vse [ors ZT AINA si9 Ose OS Z16T ost 79L iit | 06v, ‘ST LINN OS Te ost 68 ae STLINA (005 ose O0'se0% os we vse [ors VT LIND 00°77 00°SE0Z Ost ws ST 09'S ZT LINA (00S 0s or | OOSEOZ 0sz we vse | 09s TELINA (00S [ 0s Or | OOSEOZ osz wre vse | 09s OT LIN 005 082 coe ‘| onse0~z sz we vse [ors 6 1INn SS —_[o0sc07 0st we vst [ors S1INA co) sz 19% OStoLT osz SOL sct__[oev Zinn (00S ose oor | ooseoz ost wre vst [ors ‘SANA 00S ost 007% 00°S20% | 0st oe vse 09'S SAINT (005 0sz wor | OSEOz ose aa vse | ors ein (005 ose oz | oose0z Ost +8 vst | 09s ZINA (00S Ose. Oz ovosTz ose ors Le 06S TINA INNOWY 1 [WOS ud (a) INNOWY 1 WosWwi0L AINA TWILN3aISay (00°022‘S9 ANNOY TVLOL

You might also like