Voltage Test Form

This document records the results of a voltage test at a construction site. It lists cable types and sizes, voltage readings between circuits, continuity readings, and comments. Signatures from the sub-contractor, client, consultant, and main contractor are required to verify that the inspection was carried out and the items passed testing according to contract specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
4K views1 page

Voltage Test Form

This document records the results of a voltage test at a construction site. It lists cable types and sizes, voltage readings between circuits, continuity readings, and comments. Signatures from the sub-contractor, client, consultant, and main contractor are required to verify that the inspection was carried out and the items passed testing according to contract specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Document Ref :

Revision : -

Effective Date : -

Page :
Client :
VOLTAGE TEST
Contract Number :
Contract/Project Name :

Main Contractor :
Sub-contractor / Supplier : Type of Works :

Location : Date :
Ref. Drawing No (s) : RFWI No :

DB/FP NO. / VOLTAGE READINGS(V) CONTINUITY


CABLE TYPE CABLE SIZE REMARKS
CIRCUIT NO. RY YB BR R-N Y-N B-N Y-E B-E N-E (R,Y,B,N,E)

Comment :

(Note: If Unsatisfactory works occurred after 2nd inspection, please resubmit using a new form for subsequent inspection)
Status of Inspection

We have carried out all necessary inspections and verify that the above items/activities confirm to the contract specifications/document.

Witness by sub-contractor Witness by client Voltage by consultant Witness by main contractor

Signature :
Company :
Date :

Document Ref
:
Revision
:
-
Effective Date
:
-
Page
:
Client
:
Contract Number
:
Contract/Project Name
:
Main Contractor
:
Su