Roughing Installation Procedures Guide

This document outlines the procedures for roughing installation of pipes and wire ways. It details the preparation, execution, and inspection steps, including checking materials, using approved plans, permitting work activities, installing according to code, requesting surveys and inspections to satisfy design requirements, and using checklists. Safety precautions like wearing PPE are also addressed. The overall process ensures pipes and wire ways are properly installed at the site according to approved plans, codes, and through following quality inspection steps.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

Roughing Installation Procedures Guide

This document outlines the procedures for roughing installation of pipes and wire ways. It details the preparation, execution, and inspection steps, including checking materials, using approved plans, permitting work activities, installing according to code, requesting surveys and inspections to satisfy design requirements, and using checklists. Safety precautions like wearing PPE are also addressed. The overall process ensures pipes and wire ways are properly installed at the site according to approved plans, codes, and through following quality inspection steps.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
  • OPERATING/WORKING PROCEDURE: Describes operational and working procedures, focusing on the installation process and necessary preparations.

I.

OPERATING/WORKING
PROCEDURE
A. Roughing installation of pipes/wire ways

1. Preparation

 Check if the pipes/wire ways received at site coincides with notice


to deliver.
 All materials delivered at site must have Material Delivery
Inspection form.
 Provide all the tools/equipments/consumable items necessary for
roughing installation.
 SAFETY ALWAYS! Wear complete PPE’s.

2. Execution
 Make sure that plans/drawings are “APPROVED for
CONSTRUCTION PLANS” or if there is a revision check if it’s the
latest & approved plans/drawings.
 Provide work activity permit prior to start the activity.
 Make reference marking based on the plans/drawings.
 Install the pipe/wire ways as shown in the approved
plans/drawings, approved working methodology and is based on
the latest edition of “PHILIPPINE ELECTRICAL CODE”.

3. Inspection
 Request for survey report.
 Request for an inspection in advance as per approved Project
Quality Plan. Any comment or minor changes have to be
fulfilled & re-inspection must be carried out to satisfy the
design & consultant’s requirements.
 Provide necessary checklist attach on request for inspection.

ENGINEERS ● CONTRACTOR ● SUPPLIERS


Dolores cor. CamiaSts., Dolmar Golden Hill Subd., Llano Road, Caloocan City – Philippines
+632 376-0387 | 376-9867 | 935-6645 F: +632 930-5796 E: gpi@greenlightpowerinc.com
www.greenlightpowerinc.com