A. Roughing installation of pipes/wire ways
1. Preparation
Check if the pipes/wire ways received at site coincides with notice
to deliver.
All materials delivered at site must have Material Delivery
Inspection form.
Provide all the tools/equipments/consumable items necessary for
roughing installation.
SAFETY ALWAYS! Wear complete PPE’s.
2. Execution
Make sure that plans/drawings are “APPROVED for
CONSTRUCTION PLANS” or if there is a revision check if it’s the
latest & approved plans/drawings.
Provide work activity permit prior to start the activity.
Make reference marking based on the plans/drawings.
Install the pipe/wire ways as shown in the approved
plans/drawings, approved working methodology and is based on
the latest edition of “PHILIPPINE ELECTRICAL CODE”.
3. Inspection
Request for survey report.
Request for an inspection in advance as per approved Project
Quality Plan. Any comment or minor changes have to be
fulfilled & re-inspection must be carried out to satisfy the
design & consultant’s requirements.
Provide necessary checklist attach on request for inspection.
ENGINEERS ● CONTRACTOR ● SUPPLIERS
Dolores cor. CamiaSts., Dolmar Golden Hill Subd., Llano Road, Caloocan City – Philippines
+632 376-0387 | 376-9867 | 935-6645 F: +632 930-5796 E: gpi@greenlightpowerinc.com
www.greenlightpowerinc.com