Activity Discretion Reference Documents Acceptance Criteria Inspection Record Responsibility
Code
Client
Main
1.0 Material Receiving at site
Approved
prequalification of Visual Inspection / Physical QC Engineer
Structural steel & ADM-IMS-FRM-13-
1.1 supplier Verification Project FI FI FI -
accessories 10
Approved Material As per approved material Engineer
Approved Drawings
Lay down area for steel Approved Method The lay down area shall be ADM-IMS-FRM-13- Project
1.2 - S S -
structure Statement cleaned, firm and safe 10 Engineer
2.0 Preparation
Verifying Party
Sub-Contractor
ITP
Contractor
Consultant
Activity Discretion Reference Documents Acceptance Criteria Inspection Record Responsibility
Code
Client
Main
3.0 Steel Erection
Horizontally and vertically aligned
Approved Method QC Engineer
Bracing, girts and purlins properly ADM-IMS-FRM-13-
3.1 Braced-Bay Statement Project FI H H -
installed 09
Approved Drawings Engineer
Bolts and Nuts properly tightened
Horizontally and vertically aligned
Approved Method QC Engineer
Bracing, girts and purlins properly ADM-IMS-FRM-13-
3.2 Remaining Frame Statement Project FI H H -
installed 09
Approved Drawings Engineer
Bolts and Nuts properly tightened
4.0 Finishing
QC Engineer
Approved Method Finishing paint as per approved ADM-IMS-FRM-13-
4.1 Touch-Up paint Project FI H H -
Statement specification 09
Engineer
QC Engineer
Approved Method Finishing paint as per approved ADM-IMS-FRM-13-
4.2 Fire Proofing Project FI H H -
Statement specification 09
Engineer