1.0 Scope
This checklist describes general requirements for the control of pipe and pipeline welding
materials such as welding electrodes, welding rods, welding consumables to be used for
EPCC OF CPF- OIL TREATMENT SYSTEM AND AUXILIARY SYSTEMS PROJECT.
Quality control activities of the subcontractors should be performed in accordance with this
CHECKLIST.
2.0 Abbreviations/definitions
WELDING
Assigned person who is fully responsible for
MATERIAL
welding material control of the Subcontractors.
CONTROLLER:
CONSUMABLE Revision 0
CHECKLIST Page 5 of 11
3.0 References
CONSUMABLE Revision 0
CHECKLIST Page 6 of 11
The welder should carry with him WMRF all the time during welding works and return it
after completion of welding works at same day to the Welding Material Controller.
5.0 Attachments
Attachment 1: Welding Material Inspection Report
Attachment 2: Welding Material Request Form
Attachment 3: Table for Drying Condition
Attachment 4: Daily Drying & Holding Control Sheet
Attachment 5: Welding Material Issue and Return Status
CONSUMABLE Revision 0
CHECKLIST Page 7 of 11
CONSUMABLE Revision 0
CHECKLIST Page 8 of 11
CONSUMABLE Revision 0
CHECKLIST Page 9 of 11
Note:
This drying condition of the table is recommend.
All the drying condition shall conform to the description of Manufacturer of welding electrode