You are on page 1of 2
Howan@§generov Block-9 Surface Facility Phaso-! Project Request For Inspection (RF!) SHe DPAB PRIO Wo, 1992-08 RFI No BKGf00201-FSF-00PP-RFLOION Re TFT ERCC TFN SGC FOSS T BHEOPS feet eran ofere Faved Date & Tine 08 Aug.2022 A 00 AM [eonractor oFAB puonac iscnine: PP [iP No seer rorconancaTe eae InP Actay Code & intention vel 12,128 W Description of inspection: Final Visual Examination of competed welds-FH.Q(Y) Weipa piping as per atachment2 Does the drawing(s) need to be marked up due to ste changes? UF "Yeu than tha AFT ehould oni be saved once ie Thapoction Markcup Drawings Nave boon submited aang wi ver no |v [oes Wy be signed once Te Map ip Drawings 9 Taxa) [Atachments: FH-Q(Y)-Wethesd-V1-012: Weld Vieual Inepection Report The above mentioned activity has been Inspected & Accepted by the Contractor Name: Peston: ‘Signature Date Hassan Zaib Contractor QAIOC aT 08.08.2022 Inspection Date Inepeaton Time Locatontarea Reference Docs / OWS Isometric Drawings for Production 08.08.2022 50090 m Welpsd Wietlead FH-O(Y) 8K81-1332-01- FSF-999-P1P-1S0-0004 PMC Comments: RFI Acceptance & Inspection Result ceptable Yes Ne aaa ‘A [Werks net ready at the epecion ime_ New RFT shal be [sued [Result of nepecton i not accoptabe. New RFT shal be sued ‘The above mentioned activity has been Inspected by the PMC Or eh hy 04 -B ~2eZZ_ legiezs tddab, Request For Inepection A -No-000 Rev-8 Date: 31.01.2021 Howaht SQgeneroe Weld Visual Inspection Report QaHe_ pean [project Tie: Provision of EPCC for Flea Surlace Folly for6OKBOPO Sustained Production Pan 2 Pap oz07 [RALaypWetmeaalw-o12 ‘size | Thnk. Base Met ‘Base Metal Weld | wetaing c ‘Welding | visual No | 'soDrawingno | Joint | ncty | jam) | tem | Spec | Heat no| ttem | Spec |Hoatno| Type | rrecmer wen) ee TE | Date | tapecton | Remarks 3 | excrranasvs [am |e [re | re [mmr comme | me [aoe [mae [ow [orwnsnmn | ooccwrenrat [an [om | on | on [we | owl sazmor [ amc [rr 7 | excrranmam [a |e [re [rm | ne | nm [rare| ano | anes | aw [orananay | cocowerean [wo [ os] os] os(we|on| aamo [same |x =| sncrranmans |= [|e [re [rm | ne | omm [ rae | ano | anes | aw [orananm [cocoweron [wo [os| om [os we | on] aesor | same [x 7 | sncrranmana [a | © [re | rm | mone [ome | mp [rene | wen | ow [eranannn | cocowrerram [co [ eis | om | on | or | on | wzaonor | 2am | ne Contractor Construction Contractor GAGE PMCIPMT Name| Wang Xuefet “AKSHAY eked Atel Signature 3A ae hed Date 2022.08.08 2022.08.08 Daok~ 2022 nF-Nooa Rey -B ‘Weld Visual Inspection Report tot Date: 1.01 2021

You might also like