CPF-OIL Detail Construction Schedule

23/12/10
23/12/11
23/12/12
23/12/13
23/12/14
23/12/15
23/12/16
23/12/17
23/12/18
23/12/19
23/12/20
23/12/21
23/12/22
23/12/23
23/12/24
23/12/25
23/12/26
23/12/27
23/12/28
23/12/29
23/12/30
23/12/31
23/12/1
23/12/2
23/12/3
23/12/4
23/12/5
23/12/6
23/12/7
23/12/8
23/12/9

24/1/10
24/1/11
24/1/12
24/1/13
24/1/14
24/1/15
24/1/16
24/1/17
24/1/18
24/1/19
24/1/20
24/1/21
24/1/22
24/1/23
24/1/24
24/1/25
24/1/1
24/1/2
24/1/3
24/1/4
24/1/5
24/1/6
24/1/7
24/1/8
24/1/9
Site Supervisor
Area Person In
SN. Description Activity Description Construction Discipline Duration Plan Start Plan Finish Actual Start Actual Finish Remark
Charge CAMCE
Team

111 Pig Receiver Unit Area Target MC Completion Date 20231231 Changqingzeng 12/4/2023 1/19/2024

1 Civil Civil Changqingzeng Sun Ying CIV 12/4/2023 12/21/2023

1.1 汇管处管道支墩 Manifold Pipe suport foundation Changqingzeng Sun Ying CIV 12/4/2023 12/21/2023

1.1.1 1批短柱浇筑 First Batch Pedestal Pouring Changqingzeng Sun Ying CIV 6 12/4/2023 12/9/2023

1.1.2 2批支墩施工(3处) Second Batch Pipe support foundaiton(3 area) Changqingzeng Sun Ying CIV 12 12/9/2023 12/21/2023 待管道移交后进行

Pipe Support foundation at Pig launcher &


1.2 收发球筒处支墩施工 Changqingzeng Sun Ying CIV 12/6/2023 12/15/2023
Receiver

1.2.1 承台、柱头浇筑 Base Foundation and Pedestal Pouring Changqingzeng Sun Ying CIV 4 12/6/2023 12/10/2023

1.2.3 回填 Backfilling Changqingzeng Sun Ying CIV 3 12/12/2023 12/15/2023

2 Structure Structure Changqingzeng Li Chengwei Structure 12/5/2023 1/19/2024

2.1 A1 管廊钢结构格栅板、栏杆固定 Gratings and Railings to be fixed at pipe rack A1 Changqingzeng Li Chengwei Structure 11 12/5/2023 12/15/2023

2.2 段塞流捕集器钢结构梯子、栏杆安装 Ladders and Railings installation for Slug catcher Changqingzeng Li Chengwei Structure 10 1/10/2024 1/19/2024

2.3 汇管钢结构支架结构安装 Steel Pipe Support Installation for Manifold Changqingzeng Li Chengwei Structure 4 12/21/2023 12/25/2023

3 UG Piping UG Piping Changqingzeng Shi Yanbing PIP 12/5/2023 12/18/2023

4 Incoming Pipelines Tie-in Completion and hand


3.1 4条进站管线 tie-in 地下部分完成,移交土建 Changqingzeng Shi Yanbing PIP 12/5/2023 12/12/2023
over to civil team

3.1.1 南北向三条20吋管线安装完成 Three 20-inch Pipelines installation(North-South) Changqingzeng Shi Yanbing PIP 3 12/5/2023 12/7/2023

3.1.2 冷缠带、电火花完成 Coating and Holiday Test Changqingzeng Shi Yanbing PIP 2 12/7/2023 12/9/2023

10-inch incoming pilelines connect to the ground


3.1.3 南北向10吋进站管线上升段 Changqingzeng Shi Yanbing PIP 5 12/7/2023 12/11/2023 土建12.6交接安装
field

3.1.3 南北向10吋进站管线电火花 Holiday Test for 10 inch Incming pipelines Changqingzeng Shi Yanbing PIP 1 12/12/2023 12/12/2023

3.2 井室阀门安装、密封 Valve Installation, sealling(Valve Well) Changqingzeng Shi Yanbing PIP 12/11/2023 12/12/2023

3.2.1 井室V-56/69 阀门安装、密封 Valve Installation, sealling(Valve Well V-56/69) Changqingzeng Shi Yanbing PIP 2 12/11/2023 12/12/2023

3.3 井室混凝土盖板安装、井盖安装 Concrete Cover and Valve well cover installation Changqingzeng Shi Yanbing PIP 12/5/2023 12/9/2023

3.3.1 花纹板井盖制作、安装(中机施工) Strip well cover fabrication and installation Changqingzeng Shi Yanbing PIP 3 12/5/2023 12/18/2023

4 AG Pipe(吋口数) AG Pipe Changqingzeng Shi Yanbing PIP 12/15/2023 1/13/2024

Manifold, Pipeline for Pig launcher and received,


4.1 汇管、收发球管线、阀门安装 Changqingzeng Shi Yanbing PIP 30 12/15/2023 1/13/2024
and Valve Installation

4.1.1 阀门锁安装 Valve Lock Installation Changqingzeng Shi Yanbing PIP 30 12/15/2023 1/13/2024

4.2 A1 管廊+段塞流 AG pipe work at Pipe Rack A1 and Slug Catcher Changqingzeng Shi Yanbing PIP 12/18/2023 12/31/2023

4.2.1 管线、阀门 AG pipe and Valves installation Changqingzeng Shi Yanbing PIP 14 12/18/2023 12/31/2023

5 设备 Mechanical Changqingzeng Lian Junhai EQ 12/5/2023 12/30/2023

5.1 收发球筒 Pig Lanucher and Receiver Changqingzeng Lian Junhai EQ 12/25/2023 12/30/2023

5.1.1 三个悬臂吊安装 Three Cantilever Crane Mounting Changqingzeng Lian Junhai EQ 5 12/25/2023 12/30/2023

5.2 段塞流捕集器 Slug Catcher Changqingzeng Lian Junhai EQ 12/5/2023 12/18/2023

5.2.1 保温 Insulation Changqingzeng Lian Junhai EQ 14 12/5/2023 12/18/2023

6 Electrical and Instrument/Telecom Electrical and Instrument/Telecom Changqingzeng Xi Chunming ELE/INT/TEL 12/10/2023 12/31/2023

6.1 电气 Electrical and Instrument/Telecom Changqingzeng Xi Chunming ELE/INT/TEL 12/10/2023 12/31/2023

6.1.1 电缆桥架安装 Cable Tray Installation Changqingzeng Xi Chunming ELE/INT/TEL 2 12/22/2023 12/23/2023

6.1.2 电缆敷设及接线 Cable pulling and Termination Changqingzeng Xi Chunming ELE/INT/TEL 8 12/24/2023 12/31/2023

路灯基础就位(10盏灯),只有示意图,无平面布置
6.1.3 图,需设计现场确定位置,出红线图,12月6日现场 Lamp Foundaiton put in place(for 10 Lamps) Changqingzeng Xi Chunming ELE/INT/TEL 3 12/10/2023 12/12/2023
核实。

6.1.4 照明 Lighting Fixtures Changqingzeng Xi Chunming ELE/INT/TEL 19 12/13/2023 12/31/2023