KEY PLAN
START END
FACE A B C D E F G H I J K L M N O P Q R S FACE
33.45
21.23
24.23
27.23
28.61
28.99
30.23
30.34
33.45
12.23
15.23
18.23
33.23
2.64
6.23
0.00
0.11
0.23
9.23
3.23
END
1.72
1.84
START
FACE FACE
31.84
1 GENERAL NOTES
31.73
100 mm Ø PVC
1' 80 MM Ø galvanized iron
pipe as inlet pipe.
THIS DRAWING IS THE SOLE PROPERTY OF ARCHITECT
pipe as soil pipe. 80 MM Ø galvanized iron
100 mm Ø PVC pipe pipe as outlet pipe. AND IS NOT TO BE COPIED OR USED WITHOUT PRIOR
as waste water pipe.
PERMISSION.
100 mm Ø PVC pipe
as storm water drain.
ALL DIMENSIONS IN THE DRAWING ARE TO BE READ AND
0
1:6 NOT TO BE MEASURED.
28.73
2 2'
E
P
O ALL DIMENSIONS SHALL BE CO-RELATED WITH
L
S STRUCTURAL AND SERVICE DRAWINGS AND ANY
100 mm Ø PVC pipe
as storm water drain.
AMBIGUITY SHALL BE IMMEDIATELY BROUGHT TO THE
NOTICE OF THE ARCHITECT BEFORE THE COMMENCEMENT
0
100 mm Ø PVC pipe
9.23
1:6
as waste water pipe.
30 mm Ø galvanized iron OF WORK.
1:60
E
100 mm Ø PVC rung supported by 50mm x
pipe as soil pipe.
THIS DRAWING SHALL SUPERSEDE ITS PREVIOUS
P
4.97 50mm support rail.
E
O
SW1 REVISIONS.
P
L
25.72
3 3'
O
ALL DIMENSIONS ARE IN MM UNLESS MENTIONED.
S L
4.51
0.93
0.70
4
4510 X 1750
0.90
0.90
SW2 D2 ALL EXTERNAL WALLS AND ROOM PARTITION WALLS ARE 230 MM
SW3 4.51 THICK AND INNER TOILET WALLS ARE 150 MM THICK.
23.74
0.15
5 5'
0.38
75 mm Ø galvanized iron
INTERNAL PLASTER 16MM THICK, EXTERNAL PLASTER 22MM THICK
4.74 rung supported by 75mm Ø
23.04
6 support rail. FINISHES SCHEDULE
1.17
+ 2.85
1.45
SR TYPE SIZE SILL LINTEL BRIEF DESCRIPTION
FROM TILL BEAM
NO. UNFINISHED BOTTOM
FLOOR LEVEL
1 D1 2000 X 2100 UNFINISHED 2100 TW FRAME WITH DOUBLE
31.84
0.11
FLOOR LEVEL
0.23 9.11 PANEL (HALF PANEL HALF GLAZED)
C56
16.72 2 D2 900 X 2100 UNFINISHED 2100 TW FRAME WITH SINGLE
10 10'
4.55
8
3.50
6.45
0.60
C57 FLOOR LEVEL
7
PANEL.
0.26
6
1.13
5
31.84
+ 14.1
4
2.13
3
2.00
2.00
D1
7.62
2
1
2.66
73
75
63
64
65
66
67
68
69
70
72
74
76
62
71
FL W1
+ 11.85
2.25 2.36
9.11
4.27
2.00
W4
1.18
AS HANDRAIL SUPPORTED BY
FL W1 SK CL
SK CL
C58 + 14.1
0.45
C63 13.72
RISER - 250 MM
TREAD - 150 MM
11 2.00 0.43 3.25
11'
DOWN
2.01
2.24
0.68 2.00 0.66
1000 MM Ø galvanized iron
2.72 cover.
1.13
2.66
D1
SW6
85
79
78
77
76
90
89
88
87
86
84
83
82
80
91
81
12.22
12 12' 75 mm Ø galvanized iron
rung supported by 75mm Ø
21.43
C64 3.97
support rail.
4.91
1.72
1.72
SW7
10.72
1.00
13 13'
2.77
LIFT 2 MACHINE ROOM
3970 X 2770 4.50
0.49
0.90
0.90
D2
1.54
3.97
SW8
9.22
0.15
14 14' PLAN OF WATER TANK
0.38
75 mm Ø galvanized iron 4.43
rung supported by 75mm Ø
support rail.
100 mm Ø PVC
pipe as soil pipe.
100 mm Ø PVC pipe
as waste water pipe.
100 mm Ø PVC pipe
as storm water drain.
A 6.22
15 - 15'
100 mm Ø PVC pipe
as storm water drain.
100 mm Ø PVC pipe
as waste water pipe.
100mmØ PVC pipe as soil pipe. PROJECT: MARKET
8.96
100 mm Ø PVC
pipe as soil pipe.
CONTENT
3.22 RCC Coping. TERRACE FLOOR PLAN
16 16' OF SHEET:
18mm thick internal plaster. DATE 15/12/2021 CHECKED BY : Mrs. S. Lahot
1.72 DRAWN SHAH FAISAL
17 17' One brick thick parapet wall.
1.18
18 0.00 RCC slab. CONSTRUCTION COMPANY :
STRUCTURAL CONSULTANT :
N
END ELECTRICAL CONSULTANT :
START FACE PLUMBING CONSULTANT :
FACE 7.46 1.54 21.45 3.00
33.45
NAME OF ARCHITECT
END DETAIL AT PARAPET A SHAH FAISAL
START FACE SCALE 1:10 - THIRD YEAR B.ARCH
FACE A' B' C' D' E' F' G' H' I' J' K' L' M' N' O' P' Q' R' S' ROLL NO:- 18
PiCA, NEW PANVEL
5
(REVISION-0)