You are on page 1of 1

***Review Note: (TYP.

for ALL GA drawing)


COMPANY could not perform to review this GA drawing in detail line by line,
DATE

so EPC Contractor is to ensure this Piping GA drawing has been extracted


from PDMS 3D Model which all piping routes, pipe support, in-line items,
elevation, dimension, etc. are matched/aligned with latest 3D model.
If any changed on 3D model design or mismatched with Iso dwg, Structure
DRAWING LIMIT dwg, Instrument Location Plan, Hook-up drawing, etc., EPC Contractor is fully
BY

responsibility to modify and update this GA drawing in accordingly.


DISCIPLINE

MATCHLINE CONTINUE ON BK91-1310-CPF-182-PIP-LAY-0002


DATE

DRAWING LIMIT

DOWN

DOWN
BY

N2

N5

N1
DISCIPLINE

MATCHLINE CONTINUE ON BK91-1310-CPF-182-PIP-LAY-0003

CLIENT:

CONTRACTOR:

PHASE:

DRAWING NO. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
PROJECT TITLE:

DRAWING TITLE:

STAGE DRAWING NO. SHT. REV.