NOTE: SHEET 42

A A- LEVELS OF MH1 FOR EACH PLOTS ARE PROPOSED LEVELS A


WITH STAGE 1 & STAGE 2 HOUSE CONNECTIONS .PROPOSED HOUSE
CONNECTION PROFILES ARE ALSO ATTACHED ALONG WITH THIS
SHOP DRAWINGS.

B- THIS SHOP DRAWING IS FOR PROPOSED FS LINE AND HOUSE


CONNECTIONS RELATED TO IT ALONG LATEST ROAD LAYOUT OF
E542

KEY PLAN
GENERAL NOTES:

B B

“ ”

“ ”

C C

LEGEND:
820

820

D D

00 09JUN22 SUBMIT FOR APPROVAL SR PE MT


E E
Rev. Date Revision Details Drawn Chkd. Appd.

Design Consultant : Supervision Consultant :


RESERVOIR-6 RESERVOIR-1 RESERVOIR-2 HYDER CONSULTING
Middle East Limited
25MIG P.O. Box 1854
25MIG 25MIG Doha, Qatar
Tel: +974 4424 5000
Fax: +974 4424 5001 P.O. Box 18108, Doha Qatar, F
F www.hyderconsulting.com C-Ring Road at Al-Mana Intersection,
Doha , Qatar
Tel: (974) 4626400, Fax:(974)4626500
web: http://www.keoic.com
email: info@keoic.com

Main Contractor :

Qatar Building Co.


P.O. Box: 1985, Doha, Qatar
Tel: (+974) 44625555/44625556
Fax: (+974) 44625522/44625544
Website: www.qbc.qa

Project Name:

ROADS & INFRASTRUCTURE


IN AL EBB & LEABAIB,
PACKAGE 02
G G

Project Code:
IA 2019 C 053 G
Status:
SHOP DRAWING
Drawing Title:

FOUL SEWER
LAYOUT PLAN
ROAD E542 (Part 2)
Sheet 42
H Drawn:
SACHITTRA,R
Checked:
PRAKASH, E H

Designed: Approved:
- M.TALEB
Date: Scale:
OCTOBER 2020 1:1000 on A1
Drawing Number: Revision:

DN099-P02-QBC-SH-FS-1342 00