You are on page 1of 1

1 2 3 4 5

GENERAL KEY PLAN:


N

QIBLA

A A
E - -

A SECTION
-

D
A A
- -

A SECTION
-

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NEOM. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM NEOM.
01 FOR REVIEW YAN W 19/08/2022
REV DESCRIPTION APP DATE
C PURPOSE OF ISSUE:
3D(CONSTRUCTION DESIGN STAGE)
CLIENT: PROJECT MANAGEMENT CONSULTANT:
\10-723713-4800000293-PCC-STR-DRG-512502_DWG.dwg

A A A A
- - - -

DESIGN CONSULTANT NAME & LOGO (s): CONTRACTOR NAME & LOGO (s):

A SECTION B SECTION C SECTION


- - -

B DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:


DRAWN: GUAN YL 19/08/2022
CHECKED: ZHU WC 19/08/2022 CHECKED:
APPROVED: YAN W 19/08/2022 APPROVED:
\

SCALE: N.T.S SHEET SIZE: A1


\

DISCIPLINE NAME:
INFRASTRUCTURE
\

TRANSMISSION PIPELINE
\3D

TYPICAL THRUST BLOCKS DETAILS


\

PROJECT NAME:

SPINE INFRASTRUCTURE TEMPORARY


\

WATER SUPPLY
E:\OneDrive\2021

MOUNTAIN SECTION
NEOM
A A SECTION
- KINGDOM OF SAUDI ARABIA
REGION ASSET CODE CONTRACT CODE
19/08/2022 5:21:08

DRAWING NUMBER
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

NEOM-NEN-PRC-010_TMP03_01.00

You might also like