This inspection checklist is for the installation of a water heater at Sidra Medical & Research Centre. The checklist ensures the material, location, installation, valves, grounding, wiring, piping, and other attributes of the water heater installation comply with approved drawings, submittals, specifications, applicable codes, and manufacturer's recommendations. Inspectors must check off each attribute as accept, reject, or not applicable before signing off on the inspection.
This inspection checklist is for the installation of a water heater at Sidra Medical & Research Centre. The checklist ensures the material, location, installation, valves, grounding, wiring, piping, and other attributes of the water heater installation comply with approved drawings, submittals, specifications, applicable codes, and manufacturer's recommendations. Inspectors must check off each attribute as accept, reject, or not applicable before signing off on the inspection.
This inspection checklist is for the installation of a water heater at Sidra Medical & Research Centre. The checklist ensures the material, location, installation, valves, grounding, wiring, piping, and other attributes of the water heater installation comply with approved drawings, submittals, specifications, applicable codes, and manufacturer's recommendations. Inspectors must check off each attribute as accept, reject, or not applicable before signing off on the inspection.
FOR INSTALLATION OF WATER HEATER Description of Work: Tag No. : Drawing Ref. No.: Location: System No.: Inspection Request No. : Contract No.: Project No: 625 INSPECTION ATTRIBUTES Item Description Accept Reject NA A) Installation 1. Material are approved as per material submittal 2. Location of installation is as per approved drawing 3. Water Heater install vertically and in Plumb. 4. All valves are as per approved drawings I submittal 5. Water heater and Electrical supply are properly grounded. Wiring and connections comply with 6. specification/applicable codes / manufacturer’s recommendation 7. All piping properly installed and free of leak 8. Check Level, alignment, straightness & vertically of piping 9. Piping slope is as per approved drawings/Plumbing Code 10. Others