You are on page 1of 1

SIDRA MEDICAL & RESEARCH CENTRE

INSPECTION CHECK LIST


FOR
INSTALLATION OF DUCTING INSULATION
Description of Work: Tag No. :
Drawing Ref. No.: Location:
System No.: Inspection Request No. :
Contract No.: Project No: 625
INSPECTION ATTRIBUTES
Item Description Accept Reject NA
1. Duct installation approved.
Air leak test of Installed duct are carried out and test witness
2.
by consultant / client
Air leak testing approved by consultant I client before
3.
proceeding for insulation
4. Duct were clean prior to insulation
5. Approved sealant used for installation of insulation
6. Approved sealant is not expired.
Sealant applied as per manufacturers recommended
7.
procedure
Application of approved insulation adhesive and installation
8.
of stuck up pins.
Appropriate insulation material is installed on ducting as per
9. approved shop drawing / specification I approved material
submittal.
10. Check thickness of insulation material installed on duct
11. Insulation firmly fixed I attached with duct
12. No voids I Gap between duct and insulation material.
13. Insulation lap joints are properly sealed with adhesive tape.
Insulation not squeezed or damage at channel, angle
14.
supports or other places
15. Others.

Remarks

ACCEPTED BY QK/QC MC/JV QC KEO/QP/QF QC


NAME:

SIGNATURE:

DATE:

QK-10-CL-00001 Rev 0