SIDRA MEDICAL & RESEARCH CENTRE

INSPECTION CHECK LIST


FOR
INSTALLATION OF CLOSED CELL ELASTOMERIC
INSULATION FOR DOMESTIC COLD WATER, HOT WATER
AND RAIN WATER PIPING SYSTEM
Description of Work: Tag No. :
Drawing Ref. No.: Location:
System No.: Inspection Request No. :
Contract No.: Project No: 625
INSPECTION ATTRIBUTES
Item Description Accept Reject NA
1. Insulation materials are approved.
2. Check the required thickness of insulation material.
3. Check adhesive for insulating the joints are approved.
4. Check adhesive is not expired.
5. Self adhesive tape is approved
6. Installed piping is inspected and approved.
Water tightness test/ Hydrostatic pressure test of installed
7.
piping successful carried out and approved.
8. Shop drawings are approved
9. Piping cleaned prior to installing the insulation materials
10. Pre-glued Insulation Butt jointing done properly.
All butt joints sealed properly by self adhesive tape after
11.
36 hours of pre-glued Insulation jointing.
12. No air gap between insulation materials and adhesive tape
13. No piping section is left without installation of insulation
Exposed interior vertical piping protected from floor to 1.8
14. m above Finish Floor as per specification section 15060
clause 3.1 B. 4
15. Identification Tag installed on insulated piping
16. Work carried out in good workmanship
17. Others

Remarks

ACCEPTED BY QK/QC MC/JV QC KEO/QP/QF QC


NAME:
SIGNATURE:
DATE: