RISK ASSESSMENT
METHOD STATEMENT FOR JET FUEL PIPING
Title: Risk Assessment: Method Statement for Installation of Jet Fuel Piping Page(s):1 of 15
Document No.: TAB-BAH-0003-MS-MC-00156 Rev. 01 Date:16-June-2021
Client: Contractor:
Contract No. C-108-01
RISK ASSESSMENT
METHOD STATEMENT FOR JET FUEL PIPING
RISK ASSESSMENT
METHOD STATEMENT FOR JET FUEL PIPING
Title: Risk Assessment: Method Statement for Installation of Jet Fuel Piping Page(s):3 of 15
Document No.: TAB-BAH-0003-MS-MC-00156 Rev. 01 Date:16-June-2021
Client: Contractor:
Contract No. C-108-01
RISK ASSESSMENT
METHOD STATEMENT FOR JET FUEL PIPING
Speeding.
Faulty vehicle.
Serious incident
All personnel to attend the site safety induction
Involving
workers/vehicles Qualified drivers only to be allowed on site.
Fatality/injury.
Damage to vehicles or
structures.
RISK ASSESSMENT
METHOD STATEMENT FOR JET FUEL PIPING
RISK ASSESSMENT
METHOD STATEMENT FOR JET FUEL PIPING
RISK ASSESSMENT
METHOD STATEMENT FOR JET FUEL PIPING
RISK ASSESSMENT
METHOD STATEMENT FOR JET FUEL PIPING
obstacles ,
Falling objects ,
Adverse Weather ,
hydraulic failure,
electrocution, person
fall from height,
Adverse climate
condition - heavy
wind, rain. Emergency
rescue.
Overhead / distant
structures
Overloading
RISK ASSESSMENT
METHOD STATEMENT FOR JET FUEL PIPING
Pre-plan your route when moving the torch set. Ensure the
Muscle strain and/or
route of travel is free of obstacles and slipping/tripping
sprain, skeletal injuries
hazards
to the neck and spine,
as well as other parts When not in use, acetylene tanks and oxygen tanks must
of the body, resulting be stored in a secured, upright position away from
from improper lifting flammables, sparks, or open flame, and 1910.252.
of material, and tools
9 Hot works 4 3 12 4 1 4 Low Y
Fire and explosion Store tanks indoors or in a dry shaded area. Do not store
resulting in severe in direct sunlight during very hot weather conditions.
burns, Contact with
sharp edges, particles Inspect the work are for flammable materials. Consider
in eyes, using a “Hot Works” permit program that requires a 30-
Very serious injury, minute safety watch. Ensure adequate fire extinguisher is
readily available.
including severe burns
Only use an approved striker to ignite the torch. Never
attempt to use a cigarette lighter, match, or open flame.
Title: Risk Assessment: Method Statement for Installation of Jet Fuel Piping Page(s):9 of 15
Document No.: TAB-BAH-0003-MS-MC-00156 Rev. 01 Date:16-June-2021
Client: Contractor:
Contract No. C-108-01
RISK ASSESSMENT
METHOD STATEMENT FOR JET FUEL PIPING
RISK ASSESSMENT
METHOD STATEMENT FOR JET FUEL PIPING
touching metal
Ensure good housekeeping always and removal of
materials after each day’s work
Should provide a proper lighting during working time
specially on working night time if required under the
Injury contract.
Inadequate lighting.
Provide suitable and sufficient lighting to carry out the
Lack of Concentration tasks. Use the client lux meter to check the luminosity-
Minimum lux required is 54 in general.
In-adequate Lighting at
working Area during Slips trips and falls.
11 Night Time Work 4 3 12 Control working hours. 4 1 4 Low Y
Sleeping on the site
Adequate breaks/rest period.
Fall from height.
Implement Heat stress programmed.
Injury to worker.
Do not forget that harness with double lanyard inspected
free of defects, wear and tears burns...Etc.
Title: Risk Assessment: Method Statement for Installation of Jet Fuel Piping Page(s):11 of 15
Document No.: TAB-BAH-0003-MS-MC-00156 Rev. 01 Date:16-June-2021
Client: Contractor:
Contract No. C-108-01
RISK ASSESSMENT
METHOD STATEMENT FOR JET FUEL PIPING
Title: Risk Assessment: Method Statement for Installation of Jet Fuel Piping Page(s):12 of 15
Document No.: TAB-BAH-0003-MS-MC-00156 Rev. 01 Date:16-June-2021
Client: Contractor:
Contract No. C-108-01
RISK ASSESSMENT
METHOD STATEMENT FOR JET FUEL PIPING
Title: Risk Assessment: Method Statement for Installation of Jet Fuel Piping Page(s):13 of 15
Document No.: TAB-BAH-0003-MS-MC-00156 Rev. 01 Date:16-June-2021
Client: Contractor:
Contract No. C-108-01
RISK ASSESSMENT
METHOD STATEMENT FOR JET FUEL PIPING
Title: Risk Assessment: Method Statement for Installation of Jet Fuel Piping Page(s):14 of 15
Document No.: TAB-BAH-0003-MS-MC-00156 Rev. 01 Date:16-June-2021
Client: Contractor:
Contract No. C-108-01
RISK ASSESSMENT
METHOD STATEMENT FOR JET FUEL PIPING
CLASSIFICATION OF CHART
Likelihood of Risk
Likelihood Description Rating
Unlikely Occurrence close to zero 1 Classification
May Happen Capable of taking Place 2
Likely Tend or Inclined to Occur 3 1–4 Attention Required- Low Risk
Very Likely High Inclination of Occurrence 4 5–9 Corrective Measures Required- Medium Risk
10 – 16 Corrective Action Required- High Risk
Certain Most Definitely Happen- Not “If but When” 5 20 – 25 Elimination of Hazard - Serious Risk
Severity of Risk
Severity Description Rating Likelihood
Minor Injury First-Aid on Site 1 1 2 3 4 5
Minor Injury Treatment Off Site 2 1 1 2 3 4 5
Up-to-3 days Injury Limited or no work for three days 3 2 2 4 6 8 10
Major Injury Reportable 4 Severity 3 3 6 9 12 15
Death 5 4 4 8 12 16 20
5 5 10 15 20 25
Title: Risk Assessment: Method Statement for Installation of Jet Fuel Piping Page(s):15 of 15
Document No.: TAB-BAH-0003-MS-MC-00156 Rev. 01 Date:16-June-2021