Task: CONSTRUCTION OF RCC TELECOM CHAMBER FOR TELECOM WORKS Risk Assessment No: HFC-0231-MST-010
Prepared by: Sajin Kumar Vijayan Reviewed by: HSE Committee Approved by: Mohammed Hennawy
Discharge of water to Collapse of Operatives 5 4 20 Provide and maintain temporary storage/ lagoon 5 1 5 PM
Personnel
Injury
Loss of
Surveyors.
Reputation
Site
Employee in Excavations deeper than 1.2 meters will be shored Site Engineer,
supervisor,
Excavations not vicinity to adequately (Angle or step shoring) Proper access and Construction
3.1 Engineers, 5 3 15 5 1 5
adequately shored. heavy egress should be provided. TBT to be provided and Manager
Inspectors,
equipment the fore to ensure strict compliance. Access and egress
Operatives
Cave in of
Public
excavations.
Serious/ fatal
injury
Personnel
Injury
Loss of
Reputation.
In case of an
emergency,
Previous drawings will be referred to identify the
too many
presence of underground services. The area will be
employees
Surveyors. scanned cat scanned by the engineer/ foreman before
may be buried
Site commencement of the manual excavations. The
as a result of Site Engineer,
Employees not able supervisor, results will be explained to the work force in the form
inadequate Construction
3.3 to enter or exit the Engineers, 5 3 15 of TBT and the record of the same will be maintained 5 1 5
access. Manager
excavation safely. Inspectors, in the site.
Employees
Operatives Providing a ladder makes access into and out of the
may also
Public excavation area easy and safe.
strain muscles
Supervisors to ensure employees are given safe and
to get into or
convenient access to excavations.
out of the
excavation
without safe
and
convenient
access.
3.4 Personnel Surveyors. 4 3 12 Previous drawings will be referred to identify the 4 1 4 Site Engineer,
Presence of
Injury Site presence of underground services. Construction
underground
Loss of supervisor, The area will be scanned cat scanned by the engineer/ Manager
services and the
Reputation Engineers, foreman before commencement of the manual
hand shovel
damaging the Inspectors, excavations. The results will be explained to the work
underground Operatives force in the form of TBT and the record of the same
services. Public will be maintained in the site.
Surveyors.
Site Be vigilant about the other contractor’s work
Other contractor’s Injury/Accide Site Engineer,
supervisor, Do not enter other contractor’s work limit. If required;
work nt Construction
3.5 Engineers, 5 3 15 seek the permission of concerned authorities. 5 1 5
Loss of Manager
Inspectors, Proper PPE
Reputation Project Manager
Operatives Tool Box talk
Public
Surveyors. All the members of the team shall be aware of the
Site existing underground services prior to start any
Personal Site Engineer,
supervisor, excavation.
Underground Injury Construction
3.6 Engineers, 5 3 15 Excavation shall be carried out manually and very 5 1 5
Services Loss of Manager
Inspectors, carefully
reputation
Operatives Work shall be carried out under close supervision
Public charge hand or Foreman.
Property Surveyors. Do not touch any Govt./Public property without prior
Damage Site permission from concerned authorities
Site Engineer,
supervisor, If any property is affected by the work inform
Construction
3.7 Adjacent Property Personnel Engineers, 5 3 15 foreman prior to start the job 5 1 5
Manager
Injury Inspectors, Foreman shall brief all the workers about the
Loss of Operatives surrounding properties
Reputation Public Tool Box Talk
Serious injury
Unauthorized Surveyors. Adequate signages will be displayed around the
people and Site excavation to warn the people for no entry and Danger
Site Engineer,
Unauthorized entry public supervisor, Excavations in Progress etc.
Construction
3.8 into the excavated entering the Engineers, 5 3 15 5 1 5
Manager
area. excavated area Inspectors, Adequate hard barrier will be placed around the
and falling in Operatives excavation.
to the Public
excavations.
3.9 Improper Personnel Site 4 3 12 Clean up unwanted materials after use. 4 1 4 Site Engineer,
Generating
waste steel &
domestic waste
lead
environment
Sudden releases
of load or Obtain TTC Lifting permit and fulfill all PTW requirement Site Engineer,
failure will lead Work force Lifting equipment and lifting gears must be certified and Construction
Unplanned lifting to fatality Consultant & crane operator and rigger must be competent manager,
5.1 operation of /serious injuries. employer 5 4 20 5 1 5
Overturning of Superintendent,
formwork
lifting Representatives Foremen
&equipment’s
equipment’s and visitors
HSE Officer
Fatigue/ Work force Provide adequate provision of first aid, emergency Foreman, Site
Adverse weather dizziness/heat Consultant & arrangements &welfare facilities to protect from bad Engineer,
5.5 condition and fatigue. stress/heat employer 5 5 25 weather, heat related illness. 5 1 5 Construction
stroke. Refreshments/job breaks for rest. manager,
Representatives
and visitors
6.0. Concrete Fatality or 5 3 15 5 1 5 Site Engineer,
pouring Knock down of men serious Work force HSE induction, Craft Trainings. Construction
by vehicle, personnel Consultant & Adequate communication of Method statement & Manager
plant/equipment injuries like cut employer Risk assessment to work force.
Slips, trips, falls injury, crush Representatives Adequate competent supervision.
while concreting. injury, eye and visitors Correct use of PPE (safety shoes, coverall, hand gloves,
injury, back safety goggles, helmets, full body safety harness, masks etc),
injury, fracture
etc. Internal Daily Toolbox talks.
Failure of pump
may fall over
the men will
lead serious
injuries/property
Collapse/failure of damage. Work force Check the third-party certification of concrete pump,
concrete pump Failure of skips Site Engineer,
Consultant & concrete pouring skips, lifting gear certifications&
/transit mixer. and falling over employer maintenance records. Construction
6.1 Hazard from using the men. Representatives
5 3 15 Use banks man/flag /rigger for guiding the loads/pump.
5 1 5
concrete pouring Manager
Collapse of and visitors
skips. shutters will
lead to Remove the waste concrete/ spilled concrete as early as
fatality/serious possible and dispose it properly
Collapse of shutters.
injury by
crushing,
trapping of men
inside the
shutters.
Chemical Exposure of Allergic Site Safe working practices should be followed. Site Engineer,
10. 4 3 12 4 1 4
Handling Hazardous reactions & supervisor, Proper storage of chemicals as per MSDS. Construction