This document is a checklist for inspecting the site readiness for installing vitrified clay pipes. It lists attributes like ensuring access to the work area, that the area is safe, clean, and dry. It also checks that pipe routes are marked according to approved drawings and will not interfere with other building systems. The checklist is used to accept or reject the site conditions and includes spaces for remarks and signatures to document the inspection results.
Original Description:
Original Title
2.13 QK-CL-09-00001-Site Readiness Check List for Vitrified Clay Pipes Installation
This document is a checklist for inspecting the site readiness for installing vitrified clay pipes. It lists attributes like ensuring access to the work area, that the area is safe, clean, and dry. It also checks that pipe routes are marked according to approved drawings and will not interfere with other building systems. The checklist is used to accept or reject the site conditions and includes spaces for remarks and signatures to document the inspection results.
This document is a checklist for inspecting the site readiness for installing vitrified clay pipes. It lists attributes like ensuring access to the work area, that the area is safe, clean, and dry. It also checks that pipe routes are marked according to approved drawings and will not interfere with other building systems. The checklist is used to accept or reject the site conditions and includes spaces for remarks and signatures to document the inspection results.
FOR SITE READYNESS CHECK LIST FOR VITRIFIED CLAY PIPES INSTALLATION Description of Work: Tag No. : Drawing Ref. No.: Location: System No.: Inspection Request No. : Contract No.: Project No: 625 INSPECTION ATTRIBUTES Item Description Accept Reject NA 1. There is access to work 2. Area is safe for working 3. Area is clean and dry if not then clean and dry the area 4. Reference level / Grid are marked Pipe route marked as per approved shop drawing and 5. MEP co- Cordinated drawing Ensure any MEP services are not installed on the piping 6. route Check other MEP services are not obstructing with clay 7. pipe elevation route etc. 8. Other