DUST EXTRACTOR MACHINE
GMP MODEL
Purchase Order No.: HPP/170291 DATED 11-03-04
E-Mail : cipmachad1@sancharnet.in
sales@cipmach.com
Table of Content
Section Description
No.
1.0 Title
2.0 Objective
3.0 Scope
4.0 Re – qualification criteria
5.0 Over view of equipments / description
6.0 Definition
7.0 Responsibilities
7.1 Quality Engineering
7.2 Quality Assurance
7.3 Quality Control
7.4 Purchase
7.5 Production
7.6 Engineering
8.0 Indented use of instrument
9.0 Acceptance Criteria
10.0 Reference
11.0 Installation Qualification
12.0 Standard Operating Procedure
13.0 Operation Qualification
14.0 Performance Qualification
15.0 Preventive Maintenance Schedule
16.0 Final Conduction and recommendations
Confidential
2.0 Objective : The objective of this protocol is to define the installation, operation and
performance Qualification requirement and qualifying criteria recommended from its Design
specification.
3.0 Scope : This qualification protocol is applicable to the Dust Extractor Machine.
The equipment is a self-contained unit for collection of dust from the tableting etc. machine.
6.0 Definition
Qualification: The process of ensuring that equipment is appropriate for its intended use. It consists
of the following:
7.0 Responsibilities:
8.0 Intended use of the Equipment: The Dust Extractor Machine shall be used for suction of dust.
a. Equipment shall be supplied and installed as per pre – determined specification Purchase Order.
b. Material of construction and finish surface of equipment shall be as per pre – determined
specification.
c. All Utilities connected with the equipment shall be as per requirement.
d. All components of the equipment shall work or function as defined.
e. Equipment shall perform for its intended use as specified.
10.0 Reference:
Summary:
The equipment shall be procured as per specification. Installation is carried out as per
manufacturers recommendations and user applicability. Supporting utilities will be connected.
Analysis / Evaluation:
The machine shall be installed at the location. Supporting utilities shall be connected and Used for
Functioning properly. Standard operating procedure shall be identified and listed. History card
shall be prepared for the equipment. The user shall verify all relevant critical document and
drawing.
Approval:
Production
Engineering Services
Quality Engineering
Quality Assurance
Confidential
13.1 Procedure: The equipment (Dust Extractor Machine) shall be checked for the following
parameters:
13.4 Training:
Following operating / maintenance personnel were trained by the vendor and authorized to operate
or carryout routine maintenance of the equipment.
Summary
The operation of the equipment DUST EXTRACTOR MACHINE is carried out as per standard
operating procedure.
The equipment performs within the assigned limits when operated as per approved standard
operating procedure.
Operating parameters that have a significant impact on the equipment ability to operate and
achieve the process are satisfactory and confirms to the acceptance criteria.
Location :
Approval:
Production
Engineering Services
Quality Engineering
Quality Assurance
Confidential
The simulation of the process was carried out by connection with the specific machine.
NAME OF TABLET:
1. APPERANCE :
2. ANAYALSIS
1 2 3
APPERANCE
ANAYALSIS
Based on the quality control results generated by simulating the process and its review, it can be
said that machine performs satisfactory and confirming to the acceptance criteria.