CLIENT:
UTILITIES FACILITIES (UF)
Controlled document: No part of this document may be printed or reproduced for external
purposes without the written permission of the management appointee of Science-Tech
Solutions Sdn Bhd
TABLE OF CONTENT
1.0 PURPOSE 1
2.0 SCOPE 1
5.0 CONSUMABLE 1
6.0 SAFETY 2
7.0 WORKFLOW 2
8.0 ATTACHMENT 3
a. Weld Map
b. WPS
A. This procedure provides guideline for execution leaking at the pipe section near
to its reinforcement pad.
2 Scope
The welding repair using by grinding stainless steel specification and used by GTAW
welding process at
LINE NO:400-WT-4820-70524-1S105DC-N
The following documents / references out lines the inspection requirements for piping
and shall be implemented as applicable to the project work:
Brand :TG-S316
Size :2.4
SFA No :A5.9
WPS No :STS/WPS/(M)/010
PQR No :STS/PQR/010
Process :GTAW/SMAW
6 Material
EFW 316L Stainless Steel A358 -16”Sch 10S (OD 406.4mm x 4.78t)
7 Preparation of work
a. Submit Welding Inspection Control Sheet (WICS) together with WPS,WQT &
Specific Repair Procedure to PRPC UF for review and approval.Welding work shall
be performed as per approved WPS by qualified welder and shall be monitored by
supervisor (before, during and after).
b. Prior to start work, all required permit shall be applied and all piping/line that
connect to the equipment shall be suitably blank-off, isolated by spades, reverse
spectacle blind,ventilation and etc
c. The equipment to be inspected should be cleaned to remove any dirt, grease, oil
etc.
e. Grinding Disc / wire brush must be a suitable type to the material of equipment
repair.( segregation on storage of stainless steel wire brush and disc )
j. 3rd Stage - weld up to 3mm or 2 layers and apply the DPI on the weld surface to
ensure there is no defect on the weld surface and continue welding up to 6mm or
3 layer for completed weld.
k. After welding completed apply the DPI for The welded surface shall be dressed
smoothly by grinding. CLIENT representative shall witness and review MPT/DPT
activity to confirm that there are no other defects present at equipment repaired.
8 Safety
9 Work flow
10 Acceptance Criteria
a. Visual inspection and evaluation shall be as UW-42 or UW-38 (ASME Section VIII,
Div.
b. Dye Penetration Testing Appendix 8. (ASME Section VIII, Div.)
11 Attachment