Professional Documents
Culture Documents
Sr. No.
Contents
Page
01
Scope of Work
02
Responsibility
03
Description of Work
2-7
04
05
Supervision Arrangements
06
Temporary Works To Be
Designed
And Installed
07
08
Environmental
Requirements
10
09
Security Arrangements
10
10
Specific Contractual
Arrangements
10
11
Reference Documents
10
12
Records To Be Produced
10
13
Attachments
11
Page 1 of 11
MS / F-001, Rev.01
Page 2 of 11
MS / F-001, Rev.01
MS / F-001, Rev.01
And Fittings
2.0 RESPONSIBILITY
2.1
2.2
The Sr. Project Engineer is responsible to carry out the work as per the
approved MS. He is also responsible to ensure adequate equipment for
mobilization works are in place prior to the starting of work.
2.3
QA/QC Engineer is responsible to ensure work has been done as per the
specification and drawings, inspections are done as per Quality Control
Procedure and the Inspection and Test plan , and all work are offered to
consultant for inspection.
2.4
The Safety Engineer is responsible to ensure that all safety precautions are
in place and that all personnel onsite are using the Personal Protective
Equipment (helmet, gloves, safety shoes, coveralls, eye protection etc.).He
must also ensure that all relevant permissions are available for the works.
MS / F-001, Rev.01
And Fittings
care shall be taken by the store keeper to ensure that all the material
are not damaged during transit.
3.1.4
Ensure that all pipe fitters and helpers are aware of the correct
The inside of all pipe, fittings shall be smooth, clean and free
from blisters, loose mill scale, sand and dirt prior to the installation.
3.1.10
the execution team shall ensure that the latest approved Shop
Page 4 of 11
MS / F-001, Rev.01
And Fittings
3.1.13
structural and MEP work for a fit for purpose installation. Any deviation
shall be intimated to the engineer for approval in Field Design Change
Request (FDCR)/Field Adjustment Form.
3.1.14
3.2
3.2.1.Before
installing any pipe work at high level, site engineer shall ensure
that all dirt, scale and other foreign material is removed from inside
the piping before fixing.
3.2.2.Ensure and confirm the Cut pipe ends shall be clean, square, and free
from distortion, burr and dent.
Ensure and confirm that the pipe ends are smooth and clean.
3.2.4.
All the pipes shall be joined with other pipes with approved
jointing material.
3.2.5.Pipes
threaded joints. Threaded pipes shall be joined with other pipes with
approved boss white and jute/ Teflon tape for small size pipes.
3.2.6.The pipes shall be tightened with pipe wrench to the required
tightening pressure protecting the outer surface of pipe from the
damage of wrench teeth.
3.2.7.
3.2.9 All joints shall be carefully reamed and jointing compound/ Tape
should be applied on male threads only.
Page 5 of 11
MS / F-001, Rev.01
And Fittings
3.2.10
material submittal.
3.2.11
grooved system.
3.2.12
3.2.13
3.2.15
coupling.
3.2.16
drawing. Reducing tee shall be joined with pipe where the branches
are taken from main line.
3.2.17
wherever the pipes are reduced with the main line as per drawing
requirement.
3.2.19
3.2.20
Check if the valve closes hard may due to debris lodged in the
sealing area.
Page 6 of 11
MS / F-001, Rev.01
And Fittings
3.2.21
3.3
3.3.1
and
supporting
details
and
sections
given
in
the
specification.
3.3.2
3.3.3
arrangements.
3.3.11 Horizontal and Vertical pipes shall be supported as per spacing
in the Pipe and Fittings specifications.
3.4
3.5.1
3.6
Drain Point
3.6.1
MS / F-001, Rev.01
And Fittings
The drain points shall be provided at low points for draining and
3.7
3.8
Hydro-Testing
3.8.1 Ensure that testing equipments / tools and water source are ready.
3.8.2 Pressure shall be applied to the system by means of a hand pump
drawing water from a water
MS / F-001, Rev.01
And Fittings
MS / F-001, Rev.01
And Fittings
3.10
MS / F-001, Rev.01
And Fittings
5.0
SUPERVISION ARRANGEMENTS
The supervision of these works will be under the direct control of the
Construction Manager assisted by the Project Engineer, Site Engineer and
Foreman with the back up from the Technical Engineer.
All Subcontractor works will be coordinated and controlled by the
Page 11 of 11
MS / F-001, Rev.01
And Fittings
6.0
TEMPORARY WORKS TO BE DESIGNED
INSTALLED
&
7.0
MS / F-001, Rev.01
And Fittings
8. ENVIRONMENTAL REQUIREMENTS
All remedial measures to control all the operations within the
environmental legal limits for information and
record.
9.
SECURITY ARRANGEMENTS
No additional security arrangements over and above those already in place
at the site, restricted access
to the job site and the maintaining of the boundary fence security guards
will be posted on all entrance
points being used by vehicles during the camping out of this item of work
to control and coordinate traffic
movements.
11.
REFERENCE DOCUMENTS
Contract Documents :
15310, 15060
Drawings
MS / F-001, Rev.01
And Fittings
12.
RECORDS TO BE PRODUCED
13.
ATTACHMENTS
The following documents are enclosed with this method statement:
a) Form I T PFF-003 - Inspection and Test Plan For Installation of
Fire Fighting Pipe & Fittings
b) QC Checklist for Installation of Fire Fighting Pipe Work and Fittings
c) Risk Assessment Form - Using Hand Tools (QC-RAF-01)
d) Risk Assessment Form Using Ladders & Step Ladders (QC-RAF02)
e) Risk Assessment Form Using Mobile Elevated Working Platforms
(QC-RAF-03)
f)
(QC-RAF-07)
Page 14 of 11
MS / F-001, Rev.01
And Fittings
j)
Page 15 of 11
Page 16 of 11
MS / F-001, Rev.01