Pre-Inspection regarding to HSE, security & operational is necessarily to be carried to ensue the tank lorry going fill fuel is fit for loading / unloading in all aspect. Tank Lorry Loading at Gantry
Tank lorries are
instructed to park in designated bay to load required product by filling through designated loading arms controlled by Flow meters. Trained staff were appointed there to handle loading facility Dip checking after filling
To ensure CO’s vision to provide product in right quantity in the industry and to local consumer, Manual dipping procedure is followed after filling of tank lorry against required quantity