You are on page 1of 2

Document No.

:
STERLING AND INSTALLATION CHECKLIST FOR
SW-SEPC-ICL-PLC-068A, Rev: 00
WILSON PLC PANEL
PROJECT NAME & LOCATION:

Drawing / Specification No.:


Site Location / Area: Inspection Date:

OBSERVATIONS
SR. NO. CHECKS REMARKS
YES NO
Check PLC Panel & Make as per approved drawings /
1
specifications
2 Check for physical damage of equipment
Panel installed at correct location & identified with
3
labels as per drawings/SLD
4 Check proper grouting & coupling of panel
Check for correct position & alignment of PLC panel as
5
per SLD/drawings
Cables installed should be of correct type and routed in
6
correct section as per drawing / SLD
Check the cable bending radius strictly as per
8
Specifications (Avoid sharp cable bends)
Cables protected & secured from physical damage and
9
at all sharp edges
Busbars, Cable terminations tightened as per
11 manufacturer torque specifications (Using Nut-bolt &
spring washers)
Electrical connections/terminations should be clearly
12
marked as per SLD/drawing
Cables correctly labeled as per drawing/specifications
14
Check for the adequate clearance in between busbars
15
as per drawing/Panel layout
Check for partition provided between the panel
16
compartments
17 Check for the continuity of the cables
Check the hume pipe bends used are uniform & free
20
from kinks
Check that proper pipe fittings used (i.e. Rain Tight at
21
wet locations) and adequately tightened
Check that hume pipe ends are closed & sealed as per
22
specifications
Enclosure should be sealed to cover any openings or
23
leaks observed
24 Enclosure cleaned out & vacuumed
25 Touch up painting applied if required
26 Labels installed on enclosure as per drawing
Panel earthing done as per approved earthing layout
27

Page 1 of 2
Document No.:
STERLING AND INSTALLATION CHECKLIST FOR
SW-SEPC-ICL-PLC-068A, Rev: 00
WILSON PLC PANEL
PROJECT NAME & LOCATION:

Drawing / Specification No.:


Site Location / Area: Inspection Date:

OBSERVATIONS
SR. NO. CHECKS REMARKS
YES NO
COMMENTS/REMARKS:

Checked By Subcontractor: Witnessed By S&W:


(Date & Sign) (Date & Sign)

Page 2 of 2