Document No.

:
STERLING AND INSTALLATION CHECKLIST FOR
SW-SEPC-ICL-WMS-072 Rev-00
WILSON WEATHER MONITORING SYSTEM
PROJECT NAME & LOCATION:
CLIENT NAME:

Drawing / Specification No.:


Site Location / Area: Inspection Date:

OBSERVATIONS
SR. NO. CHECKS REMARKS
YES NO
Whether drawing, specification details for finalization of
1 Installation of Wind Sensor are checked?

2 Check for readiness of foundations

Check the level of Foundation for WMS System erection


3

Check any damage in UT 10 Tower to be erected


4

Confirm the height of the tower if 10 Feet as per the


5 draswing.
Check the Spike rod is installed at the top of the UT 10
6
and UT 30 Towers
Check the installation of Rain Gauge, Elbedometer, RH
7
Sensor are done Properly.
Check the Data Logger Panel has been installed and found
8 no damage.
Check the PV Module of 100 W is fixed and Connection
9 has been done.
Check the Battery is placed at right position and
10 connection is done.
Check the installation of Sun Tracker is done on right
11 Position.
Check necessary inputs are connected from Sun Tracker
12 and Elbedometer placed in nearest Tracker.
Check earthing of UT 10 and UT 30 is completed.
13

COMMENTS/REMARKS:

Contractor Sterling & Wilson


Checked & Witnessed By : Witnessed by :

Page 1 of 1