CONTRACTOR DAILY OVERTIME


REPORT
DATE : 2-Oct-22 Nasrullah Satria Stefan A.
No : 02/03/10/SPKL/MEI/22
Photo
No NIK Full Name Dept Fajar PIC Clock In Clock Out Job Description
Before After

Mr. 1. Repair ex Modul P037 NDLKC.


1 91100417 M. Dhiayuddin SP 1.2 Herianto 14:30 18:00 2. Repair ex Modul P123 BKP MCC 6 SP (on-progress)

1. M-B-1 trip over load, cleaning thickner


2. SR-36 amankan module starter guna cleaning screen oleh
2 91100443 Aldino Eka PM 3.7 Mr. Sartika 1:00 2:00 produksi
3. Awal shift monitoring sheet break PM7, dari awal shift kertas
putus. Masih mengatasi semprot broke size press penuh