PROBLEM
---
SOLUTION
---
Sub Total II 11
Total Man Power 15
Material Unit Qty Tools Unit Qty Tool Unit Qty
Oxygen Cylinder Unit 1 Cutter Grinding Set 1 Apar Unit 1
Gas Cylinder Unit 1 Cutting Torch set 1
Wrench set 1
Welding Machine Set 1
Forklift Unit 1
Rai Note :
Referensi (Drawing/Information) : Weather Bright Cloudy
n Some soleplate is ready for grouting
Morning ✔
Midday ✔
Afternoon ✔
Night
Prepared By, Approved By,
2. Setting
3. Installing
MASTER SCHEDULE (07-11-23)
PROJECT : Installation Equipment Machine Cutter Fujimaki
P/O No. : -
VENDOR : PT. ERATAMA DAYA KONSTRUKSI
October 2023 until December 2023
PROGRESS Oct-23 Nov-23 Dec-23
NO DESCRIPTION QTY UNIT Weight
ACTIVITIES (%) W01 W02 W03 W04 W05 W06 W07 W08 W09 W10 W11 W12 W12
2-8 9-15 16-22 23-28 30-5 6-12 13-19 20-26 27-03 4-10 11-17 18-24 25-31
1,0
1 Installation
1 lot 0,256 Actual 31,15 0,014 0,014 0,014 0,014 0,016 0,007
1.1 Installation All Equipment Machine Cutter Fujimaki
Plan 25,00 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032
1 lot 0,009 Actual 90,00 0,001 0,001 0,001 0,001 0,002 0,002
1.2 Dismantle and Installation Rail Track 2 Unit
Plan 70,00 0,001 0,001 0,001 0,001 0,001 0,001 0,001 0,001
1 lot 0,060 Actual 59,41 0,005 0,005 0,005 0,005 0,010 0,004
1.4 Allignment Sole Plate C/w Report
Plan 75,00 0,007 0,007 0,007 0,007 0,007 0,007 0,007 0,007
Relocate Broke Trik C/w Installation Ductiong Blower 1 lot 0,281 Actual 33,00 0,019 0,019 0,019 0,019 0,019 -
1.11
Cutter Plan 47,50 0,028 0,028 0,028 0,028 0,021 0,021 0,021 0,021 0,021 0,021 0,021 0,021
1 lot 0,045 Actual 46,15 0,003 0,003 0,003 0,003 0,003 0,003
1.12 Safety & Scaffolding
Plan 46,15 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003 0,003
1 lot 0,162 Actual 50,00 0,013 0,013 0,013 0,013 0,013 0,013
1.13 Tool Set
Plan 50,00 0,013 0,013 0,013 0,013 0,013 0,013 0,013 0,013 0,013 0,013 0,013 0,013
CUM. PLAN 5,33 10,67 16,00 21,34 30,50 39,66 48,82 57,98 66,90 75,83 84,75 97,95 100,00
VARIANCE 0,29 0,57 0,86 1,66 -0,77 -6,90 -48,82 -57,98 -66,90 -75,83 -84,75 -97,95 -100,0
Diperiksa Oleh,
PT. ERATAMA DAYA KONSTRUKSI