PRECOMMISSIONING CHECK LIST/TEST PROTOCOL


TITLE FOR ELECTRICAL EQUIPMENTS

CUSTOMER VARDHMAN - 8 MW TG SET

SITE

CONTRACT NO

Name Signature Date Remarks

Prepared by

Checked by

Released by
Page Dept :
PRE COMMISSIONING TEST PROTOCOL
1 I24

EQUIPMENT MOTOR - AUXILIARY OIL PUMP DOC NO

LOCATION LUBE OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

SYSTEM SUB SYSTEM EQUIPMENT

1) Name Plate Details :


Make Type Serial No

Voltage Current Frequency

Capacity PF Phase
Type of
Type of connection
enclosure

2) Check for ECC : As per erection check list

3) Insulation Resistance Test :


Actual Value
R - Earth Y - Earth B - Earth R - Earth Y - Earth B - Earth

4) Winding Resistance Measurement : Ambient Temperature :


Actual Value
R-Y Y-B B-R R-Y Y-B B-R

5) Starting Current :
Actual Value
R Y B R Y B

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL
2 I24

EQUIPMENT MOTOR - AUXILIARY OIL PUMP DOC NO

LOCATION LUBE OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

6) No Load Current :
Actual Value
R Y B R Y B

7) Full Load Current :


Actual Value
R Y B R Y B

8) Vibration Measurement : [For Motors above 100 KW]


No Load Full Load
Reference Actual Reference Actual
Non Driving End Bearing
Driving End Bearing
Motor Body

9) Bearing Temperature Measurement for HT Motors :


No Load Full Load
Reference Actual Reference Actual
Initial DE
NDE
After 30 Min DE
NDE

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL
3 I24

EQUIPMENT MOTOR - AUXILIARY OIL PUMP DOC NO

LOCATION LUBE OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

10 ) Instruments used for Testing

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on
Remarks :

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL
1 I24

EQUIPMENT MOTOR - OIL VAPOUR EXTRACTOR FAN DOC NO

LOCATION LUBE OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

SYSTEM SUB SYSTEM EQUIPMENT

1) Name Plate Details :


Make Type Serial No

Voltage Current Frequency

Capacity PF Phase
Type of
Type of connection
enclosure

2) Check for ECC : As per erection check list

3) Insulation Resistance Test :


Actual Value
R - Earth Y - Earth B - Earth R - Earth Y - Earth B - Earth

4) Winding Resistance Measurement : Ambient Temperature :


Actual Value
R-Y Y-B B-R R-Y Y-B B-R

5) Starting Current :
Actual Value
R Y B R Y B

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 2 I24

EQUIPMENT MOTOR - OIL VAPOUR EXTRACTOR FAN DOC NO

LOCATION LUBE OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

6) No Load Current :
Actual Value
R Y B R Y B

7) Full Load Current :


Actual Value
R Y B R Y B

8) Vibration Measurement : [For Motors above 100 KW]


No Load Full Load
Reference Actual Reference Actual
Non Driving End Bearing
Driving End Bearing
Motor Body

9) Bearing Temperature Measurement for HT Motors :


No Load Full Load
Reference Actual Reference Actual
Initial DE
NDE
After 30 Min DE
NDE

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 3 I24

EQUIPMENT MOTOR - OIL VAPOUR EXTRACTOR FAN DOC NO

LOCATION LUBE OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

10 ) Instruments used for Testing

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on
Remarks :

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
` Page Dept :
PRE COMMISSIONING TEST PROTOCOL 1 I24

EQUIPMENT MOTOR - BARRING GEAR DOC NO

LOCATION LUBE OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

SYSTEM SUB SYSTEM EQUIPMENT

1) Name Plate Details :


Type Serial No
Make
Current Frequency
Voltage
PF Phase
Capacity

Type of
Type of connection
enclosure

2) Check for ECC : As per erection check list

3) Insulation Resistance Test :


Actual Value
R - Earth Y - Earth B - Earth R - Earth Y - Earth B - Earth

4) Winding Resistance Measurement : Ambient Temperature :


Actual Value
R-Y Y-B B-R R-Y Y-B B-R

5) Starting Current :
Actual Value
R Y B R Y B

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 2 I24

EQUIPMENT MOTOR - BARRING GEAR DOC NO

LOCATION LUBE OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

6) No Load Current :
Actual Value
R Y B R Y B

7) Full Load Current :


Actual Value
R Y B R Y B

8) Vibration Measurement : [For Motors above 100 KW]


No Load Full Load
Reference Actual Reference Actual
Non Driving End Bearing
Driving End Bearing
Motor Body

9) Bearing Temperature Measurement for HT Motors :


No Load Full Load
Reference Actual Reference Actual
Initial DE
NDE
After 30 Min DE
NDE

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 3 I24

EQUIPMENT MOTOR - BARRING GEAR DOC NO

LOCATION LUBE OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

10 ) Instruments used for Testing

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on
Remarks :

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
` Page Dept :
PRE COMMISSIONING TEST PROTOCOL 1 I24

EQUIPMENT MOTOR - CONDENSATE PUMP - 1 DOC NO

LOCATION CONDENSER SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

SYSTEM SUB SYSTEM EQUIPMENT

1) Name Plate Details :


Make Type Serial No

Voltage Current Frequency

Capacity PF Phase

Type of
Type of connection
enclosure

2) Check for ECC : As per erection check list

3) Insulation Resistance Test :


Actual Value
R - Earth Y - Earth B - Earth R - Earth Y - Earth B - Earth

4) Winding Resistance Measurement : Ambient Temperature :


Actual Value
R-Y Y-B B-R R-Y Y-B B-R

5) Starting Current :
Actual Value
R Y B R Y B

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 2 I24

EQUIPMENT MOTOR - CONDENSATE PUMP - 1 DOC NO

LOCATION CONDENSER SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

6) No Load Current :
Actual Value
R Y B R Y B

7) Full Load Current :


Actual Value
R Y B R Y B

8) Vibration Measurement : [For Motors above 100 KW]


No Load Full Load
Reference Actual Reference Actual
Non Driving End Bearing
Driving End Bearing
Motor Body

9) Bearing Temperature Measurement for HT Motors :


No Load Full Load
Reference Actual Reference Actual
Initial DE
NDE
After 30 Min DE
NDE

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 3 I24

EQUIPMENT MOTOR - CONDENSATE PUMP - 1 DOC NO

LOCATION CONDENSER SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

10 ) Instruments used for Testing

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on
Remarks :

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
` Page Dept :
PRE COMMISSIONING TEST PROTOCOL 1 I24

EQUIPMENT MOTOR - CONDENSATE PUMP - 2 DOC NO

LOCATION CONDENSER SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

SYSTEM SUB SYSTEM EQUIPMENT

1) Name Plate Details :


Make Type Serial No

Voltage Current Frequency

Capacity PF Phase
Type of
Type of connection
enclosure

2) Check for ECC : As per erection check list

3) Insulation Resistance Test :


Actual Value
R - Earth Y - Earth B - Earth R - Earth Y - Earth B - Earth

4) Winding Resistance Measurement : Ambient Temperature :


Actual Value
R-Y Y-B B-R R-Y Y-B B-R

5) Starting Current :
Actual Value
R Y B R Y B

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 2 I24

EQUIPMENT MOTOR - CONDENSATE PUMP - 2 DOC NO

LOCATION CONDENSER SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

6) No Load Current :
Actual Value
R Y B R Y B

7) Full Load Current :


Actual Value
R Y B R Y B

8) Vibration Measurement : [For Motors above 100 KW]


No Load Full Load
Reference Actual Reference Actual
Non Driving End Bearing
Driving End Bearing
Motor Body

9) Bearing Temperature Measurement for HT Motors :


No Load Full Load
Reference Actual Reference Actual
Initial DE
NDE
After 30 Min DE
NDE

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 3 I24

EQUIPMENT MOTOR - CONDENSATE PUMP - 2 DOC NO

LOCATION CONDENSER SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

10 ) Instruments used for Testing

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on
Remarks :

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
` Page Dept :
PRE COMMISSIONING TEST PROTOCOL 1 I24

EQUIPMENT MOTOR - CONTROL OIL PUMP - 1 DOC NO

LOCATION CONTROL OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

SYSTEM SUB SYSTEM EQUIPMENT

1) Name Plate Details :


Make Type Serial No

Voltage Current Frequency

Capacity PF Phase
Type of
Type of connection
enclosure

2) Check for ECC : As per erection check list

3) Insulation Resistance Test :


Actual Value
R - Earth Y - Earth B - Earth R - Earth Y - Earth B - Earth

4) Winding Resistance Measurement : Ambient Temperature :


Actual Value
R-Y Y-B B-R R-Y Y-B B-R

5) Starting Current :
Actual Value
R Y B R Y B

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 2 I24

EQUIPMENT MOTOR - CONTROL OIL PUMP - 1 DOC NO

LOCATION CONTROL OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

6) No Load Current :
Actual Value
R Y B R Y B

7) Full Load Current :


Actual Value
R Y B R Y B

8) Vibration Measurement : [For Motors above 100 KW]


No Load Full Load
Reference Actual Reference Actual
Non Driving End Bearing
Driving End Bearing
Motor Body

9) Bearing Temperature Measurement for HT Motors :


No Load Full Load
Reference Actual Reference Actual
Initial DE
NDE
After 30 Min DE
NDE

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 3 I24

EQUIPMENT MOTOR - CONTROL OIL PUMP - 1 DOC NO

LOCATION CONTROL OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

10 ) Instruments used for Testing

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on
Remarks :

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
` Page Dept :
PRE COMMISSIONING TEST PROTOCOL 1 I24

EQUIPMENT MOTOR - CONTROL OIL PUMP - 2 DOC NO

LOCATION CONTROL OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

SYSTEM SUB SYSTEM EQUIPMENT

1) Name Plate Details :


Make Type Serial No

Voltage Current Frequency

Capacity PF Phase
Type of
Type of connection
enclosure

2) Check for ECC : As per erection check list

3) Insulation Resistance Test :


Actual Value
R - Earth Y - Earth B - Earth R - Earth Y - Earth B - Earth

4) Winding Resistance Measurement : Ambient Temperature :


Actual Value
R-Y Y-B B-R R-Y Y-B B-R

5) Starting Current :
Actual Value
R Y B R Y B

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 2 I24

EQUIPMENT MOTOR - CONTROL OIL PUMP - 2 DOC NO

LOCATION CONTROL OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

6) No Load Current :
Actual Value
R Y B R Y B

7) Full Load Current :


Actual Value
R Y B R Y B

8) Vibration Measurement : [For Motors above 100 KW]


No Load Full Load
Reference Actual Reference Actual
Non Driving End Bearing
Driving End Bearing
Motor Body

9) Bearing Temperature Measurement for HT Motors :


No Load Full Load
Reference Actual Reference Actual
Initial DE
NDE
After 30 Min DE
NDE

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 3 I24

EQUIPMENT MOTOR - CONTROL OIL PUMP - 2 DOC NO

LOCATION CONTROL OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

10 ) Instruments used for Testing

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on
Remarks :

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
` Page Dept :
PRE COMMISSIONING TEST PROTOCOL 1 I24

EQUIPMENT MOTOR - EMERGENCY OIL PUMP DOC NO

LOCATION LUBE OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

SYSTEM SUB SYSTEM EQUIPMENT

1) Name Plate Details :


Make Type Serial No

Armature Volt 110 Field Volt 110 RPM

Armature current Field current KW

Type of connection Shunt

2) Check for ECC : As per erection check list

3) Insulation Resistance Test :


Actual Value
Arm - Earth Field - Earth Arm - Field Arm - Earth Field - Earth Arm - Field

4) Winding Resistance Measurement : Ambient Temperature :


Actual Value
Armature Field Armature Field

5) Starting Current :
Actual Value
Arm Current Field Current Arm Current Field Current

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 2 I24

EQUIPMENT MOTOR - EMERGENCY OIL PUMP DOC NO

LOCATION LUBE OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

6) No Load Current :
Actual Value
Arm Current Field Current Arm Current Field Current

7) Full Load Current :


Actual Value
Arm Current Field Current Arm Current Field Current

8) Vibration Measurement : [For Motors above 100 KW]


No Load Full Load
Reference Actual Reference Actual
Non Driving End Bearing
Driving End Bearing
Motor Body

9) Bearing Temperature Measurement for HT Motors :


No Load Full Load
Reference Actual Reference Actual
Initial DE
NDE
After 30 Min DE
NDE

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 3 I24

EQUIPMENT MOTOR - EMERGENCY OIL PUMP DOC NO

LOCATION LUBE OIL SYSTEM FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

10 ) Instruments used for Testing

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on
Remarks :

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL
1 I24
Note:
EQUIPMENT LIGHTNING ARRESTOR DOC NO

LOCATION LA, SC, PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

FEEDER :-

1) Name plate details :

Serial No. R: Y: B:
Make
KKS No. R: Y: B:
Type

Rating
2) Check for ECC : As per erection check list

3) Insulation Resistance Check ( In Mega Ohms) :

R Y B Remarks

Between Top
Earth
terminal

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 2 I24

EQUIPMENT LIGHTNING ARRESTOR DOC NO

LOCATION LA, SC, PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

4 ) Instruments used for Testing

Name Megger
Serial No
Make
Rating
Calibrated on

Name Megger
Serial No
Make
Rating
Calibrated on

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL
1 I24

EQUIPMENT HT CABLE DOC NO

LOCATION GENERATOR TO LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

From - To Size

Cable No. Phasing


Check
1) High Voltage Test :- Ambient Temperature :-

Phases HV Test Duration IR before Leakage IR after HV Test


Voltage HV Test Current
R-Y,B,Earth

Y-R,B,Earth

B-R,Y,Earth

Precaution :- Check all safety measures are taken before carrying out HV Test.

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
2 I24

EQUIPMENT HT CABLE DOC NO 0

LOCATION GENERATOR TO LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

2 ) Instruments used for Testing

Name Megger HV Test Kit Thermometer


Serial No
Make
Rating
Calibrated on

Name Megger
Serial No
Make
Rating
Calibrated on

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 1 I24

EQUIPMENT HT CABLE DOC NO

LOCATION LA,SC,PT & CT PANEL TO SW GEAR PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

From - To Size

Cable No. Phasing


Check
1) High Voltage Test :- Ambient Temperature :-

Phases HV Test Duration IR before Leakage IR after HV Test


Voltage HV Test Current
R-Y,B,Earth
Y-R,B,Earth

B-R,Y,Earth

Precaution :- Check all safety measures are taken before carrying out HV Test.

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 2 I24

EQUIPMENT HT CABLE DOC NO 0

LOCATION LA,SC,PT & CT PANEL TO SW GEAR PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

2 ) Instruments used for Testing

Name Megger HV Test Kit Thermometer


Serial No
Make
Rating
Calibrated on

Name Megger
Serial No
Make
Rating
Calibrated on

Name Signature Date Remarks


Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL
1 I24

EQUIPMENT NEUTRAL EARTH PIT DOC NO

LOCATION PLANT EARTHING AREA FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

Resistance in
Earth pit Location Type Remarks
ohms
1 Treated INDIVIDUAL

2 " INDIVIDUAL
COMBINED OF 1
"
and 2

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
12 I24

EQUIPMENT NEUTRAL EARTH PIT DOC NO 0

LOCATION PLANT EARTHING AREA FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

Instruments used for Testing

Name Earth Megger


Serial No
Make
Rating
Calibrated on

Name
Serial No
Make
Rating
Calibrated on

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL
1 I24
Note:
EQUIPMENT NEUTRAL ISOLATOR PANEL DOC NO

LOCATION FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE
FEEDER
Note :

1) Name plate details

Serial no. Make

KKS No. Type

Rated Voltage Rated Current Aux.Volt

Motor Voltage Motor Current Motor KW


2) Alignment check : Isolator is a part of NGR panel

3) Operation check : Manual Close

Manual Open

Electrical Close - Local

Electrical Open - Local

Electrical Close - Remote


Electrical check
Check for make and break of aux Electrical Open - Remote
switch contacts.
4) Interlock check : Electrical with scheme

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 2 I24

EQUIPMENT NEUTRAL ISOLATOR PANEL DOC NO 0

LOCATION 0 FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

5) Assembly of Resistance stack :


Resistance value(in ohms):
IR value(in Meg ohms) :

6) Motor Current :

Closing Current
Opening Current

7) Checks on DM Box :
Heater Circuit** Check functioning of equipment if provided.

Lamp Circuit**

Plug and Socket circuit**

Over load relay setting(If provided)

Rating of Contactors

Greasing of Motor

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
3 I24

EQUIPMENT NEUTRAL ISOLATOR PANEL DOC NO 0

LOCATION 0 FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

9 ) Instruments used for Testing

Name Megger Multimeter Tong Tester


Serial No
Make
Rating
Calibrated on

Name Megger Multimeter


Serial No
Make
Rating
Calibrated on

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
PRE COMMISSIONING TEST PROTOCOL Page Dept :
1 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO

LOCATION GENERATOR NEUTRAL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

FEEDER :

1) Name Plate Details :


Sl No. CTN - 1
Make
Tag No R: Y: B: Type

Core 1 2 3 4 5

Ratio 650/1 650/1

Burden VA
Application Protection AVR
ACC. Class PS PS

2) Check for ECC : As per erection check list

3) Winding Resistance Check (in ohms) : Ambient Temperature:-


Sec.Phase Core 1 Core 2 Core 3 Core 4 Core 5

B `

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer

PRE COMMISSIONING TEST PROTOCOL Page Dept :

2 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO 0

LOCATION GENERATOR NEUTRAL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

4) Insulation Resistance Check (in Mega Ohms)


R Y B Remarks
Primary to Earth

Primary to Core 1

Primary to Core 2

Primary to Core 3

Primary to Core 4

Primary to Core 5

Secondary Core 1 to Earth

Secondary Core 2 to Earth

Secondary Core 3 to Earth

Secondary Core 4 to Earth

Secondary Core 5 to Earth

Secondary Core 1 to Core 2

Secondary Core 1 to Core 3

Secondary Core 1 to Core 4

Secondary Core 1 to Core 5

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
3 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO 0

LOCATION GENERATOR NEUTRAL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

R Y B Remarks
Secondary Core 2 to Core 3

Secondary Core 2 to Core 4

Secondary Core 2 to Core 5

Secondary Core 3 to Core 4

Secondary Core 3 to Core 5

Secondary Core 4 to Core 5


5) Polarity Check

R Y B

Secondary Core 1
Applied +ve on
Secondary Core 2
Primary P1
Secondary Core 3
Measured secondary
S1 whether +ve or
Secondary Core 4
Negative with Meter by
Deflection method
Secondary Core 5

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer

PRE COMMISSIONING TEST PROTOCOL Page Dept :

4 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO 0

LOCATION GENERATOR NEUTRAL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE
6) Ratio Check
Phase CT Ratio Primary Current Secondary Current Measured
Injected Core 1 Core 2 Core 3 Core 4 Core 5
R

B
B
Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer

PRE COMMISSIONING TEST PROTOCOL Page Dept :

5 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO 0

LOCATION GENERATOR NEUTRAL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE
6) Magnetisation Characteristics
Phase CT Ratio Core 1 Core 2 Core 4 Core 5
Volt Milli Amp Volt Milli Amp Volt Milli Amp Volt Milli Amp

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer

PRE COMMISSIONING TEST PROTOCOL Page Dept :

6 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO 0

LOCATION GENERATOR NEUTRAL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

8 ) Instruments used for Testing

Primary
Name Megger Multimeter Tong Tester Thermometer
Injection Kit
Serial No
Make
Rating
Calibrated on

Name Megger Multimeter Tong Tester


Serial No
Make
Rating
Calibrated on

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
1 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

FEEDER :

1) Name Plate Details :


Sl No. CT - 1 Make

Tag No R: Y: B: Type

Core 1 2 3 4 5

Ratio 650/1 650/1

Burden VA 30
Application Protection AVR
ACC. Class PS 0.5

2) Check for ECC : As per erection check list

3) Winding Resistance Check (in ohms) : Ambient Temperature:-


Sec.Phase Core 1 Core 2 Core 3 Core 4 Core 5

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
2 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

4) Insulation Resistance Check (in Mega Ohms)


R Y B Remarks
Primary to Earth

Primary to Core 1

Primary to Core 2

Primary to Core 3

Primary to Core 4

Primary to Core 5

Secondary Core 1 to Earth

Secondary Core 2 to Earth

Secondary Core 3 to Earth

Secondary Core 4 to Earth

Secondary Core 5 to Earth

Secondary Core 1 to Core 2

Secondary Core 1 to Core 3

Secondary Core 1 to Core 4

Secondary Core 1 to Core 5

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
3 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

R Y B Remarks
Secondary Core 2 to Core 3

Secondary Core 2 to Core 4

Secondary Core 2 to Core 5

Secondary Core 3 to Core 4

Secondary Core 3 to Core 5

Secondary Core 4 to Core 5


5) Polarity Check

R Y B

Secondary Core 1
Applied +ve on
Secondary Core 2
Primary P1
Secondary Core 3
Measured secondary
S1 whether +ve or
Secondary Core 4
Negative with Meter by
Deflection method
Secondary Core 5

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
4 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE
6) Ratio Check
Phase CT Ratio Primary Current Secondary Current Measured
Injected Core 1 Core 2 Core 3 Core 4 Core 5
R

B
B
Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
5 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE
6) Magnetisation Characteristics
Phase CT Ratio Core 1 Core 2 Core 4 Core 5
Volt Milli Amp Volt Milli Amp Volt Milli Amp Volt Milli Amp

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
6 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

8 ) Instruments used for Testing

Primary
Name Megger Multimeter Tong Tester Thermometer
Injection Kit
Serial No
Make
Rating
Calibrated on

Name Megger Multimeter Tong Tester


Serial No
Make
Rating
Calibrated on

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
1 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

FEEDER :

1) Name Plate Details :


Sl No. CT - 2 Make

Tag No R: Y: B: Type

Core 1 2 3 4 5

Ratio 650/1 650/1

Burden VA 30 30
Application Spare Metering
ACC. Class 5P10 0.5

2) Check for ECC : As per erection check list

3) Winding Resistance Check (in ohms) : Ambient Temperature:-


Sec.Phase Core 1 Core 2 Core 3 Core 4 Core 5

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 2 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

4) Insulation Resistance Check (in Mega Ohms)


R Y B Remarks
Primary to Earth

Primary to Core 1

Primary to Core 2

Primary to Core 3

Primary to Core 4

Primary to Core 5

Secondary Core 1 to Earth

Secondary Core 2 to Earth

Secondary Core 3 to Earth

Secondary Core 4 to Earth

Secondary Core 5 to Earth

Secondary Core 1 to Core 2

Secondary Core 1 to Core 3

Secondary Core 1 to Core 4

Secondary Core 1 to Core 5

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 3 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

R Y B Remarks
Secondary Core 2 to Core 3

Secondary Core 2 to Core 4

Secondary Core 2 to Core 5

Secondary Core 3 to Core 4

Secondary Core 3 to Core 5

Secondary Core 4 to Core 5


5) Polarity Check

R Y B

Secondary Core 1
Applied +ve on
Secondary Core 2
Primary P1
Secondary Core 3
Measured secondary
S1 whether +ve or
Secondary Core 4
Negative with Meter by
Deflection method
Secondary Core 5

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 4 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE
6) Ratio Check
Phase CT Ratio Primary Current Secondary Current Measured
Injected Core 1 Core 2 Core 3 Core 4 Core 5
R

B
B
Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 5 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE
6) Magnetisation Characteristics
Phase CT Ratio Core 1 Core 2 Core 4 Core 5
Volt Milli Amp Volt Milli Amp Volt Milli Amp Volt Milli Amp

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 6 I24

EQUIPMENT CURRENT TRANSFORMERS DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

8 ) Instruments used for Testing

Primary
Name Megger Multimeter Tong Tester Thermometer
Injection Kit
Serial No
Make
Rating
Calibrated on

Name Megger Multimeter Tong Tester


Serial No
Make
Rating
Calibrated on

Name Signature Date Remarks

Tester

Comm. Engineer

Consultant

Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL
1 I24

EQUIPMENT POTENTIAL TRANSFORMER DOC NO

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

FEEDER :

1) Name Plate Details :


Sl No. PT - 1 Make

KKS No. R: Y: B: Type

Core 1 2 3

Ratio 11000/110 11000/110


Application Protection AVR
Burden VA 50 50

ACC. Class 3P 0.5

2) Check for ECC : As per erection check list

3) Winding Resistance Check (in ohms) : Ambient Temperature :-


Sec.Phase Core 1 Core 2 Core 3

Name Signature Date Remarks

Tester
Comm.
Engineer

Consultant

Customer
Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
2 I24

EQUIPMENT POTENTIAL TRANSFORMER DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

4) Insulation Resistance Check ( in Mega Ohms)


R Y B Remarks
Primary to Earth

Primary to Secondary Core 1

Primary to Secondary Core 2

Primary to Secondary Core 3

Secondary Core 1 to Earth

Secondary Core 2 to Earth

Secondary Core 3 to Earth

Sec Core 1 to Sec Core 2

Sec Core 1 to Sec Core 3

Sec Core 2 to Sec Core 3


5) Polariry Check

R Y B
Secondary Core 1

Secondary Core 2

Secondary Core 3

Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant

Customer
Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
3 I24

EQUIPMENT POTENTIAL TRANSFORMER DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

6) Ratio check

Phase PT Ratio Pri.Injected Volt Secondary Voltage Measured


Core 1 Core 2 Core 3
R

7) Check open Delta Voltage (not applicable)

Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant

Customer
Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
4 I24

EQUIPMENT POTENTIAL TRANSFORMER DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

8 ) Instruments used for Testing

Name Megger Multimeter Thermometer


Serial No
Make
Rating
Calibrated on

Name Megger Multimeter


Serial No
Make
Rating
Calibrated on

Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 1 I24

EQUIPMENT POTENTIAL TRANSFORMER DOC NO

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

FEEDER :

1) Name Plate Details :


Sl No. PT - 2 Make

KKS No. R: Y: B: Type

Core 1 2 3

Ratio 11000/110 11000/110


Application Spare Metering
Burden VA 50 50

ACC. Class 3P 0.5

2) Check for ECC : As per erection check list

3) Winding Resistance Check (in ohms) : Ambient Temperature :-


Sec.Phase Core 1 Core 2 Core 3

Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 2 I24

EQUIPMENT POTENTIAL TRANSFORMER DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

4) Insulation Resistance Check ( in Mega Ohms)


R Y B Remarks
Primary to Earth

Primary to Secondary Core 1

Primary to Secondary Core 2

Primary to Secondary Core 3

Secondary Core 1 to Earth

Secondary Core 2 to Earth

Secondary Core 3 to Earth

Sec Core 1 to Sec Core 2

Sec Core 1 to Sec Core 3

Sec Core 2 to Sec Core 3


5) Polariry Check

R Y B
Secondary Core 1

Secondary Core 2

Secondary Core 3

Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 3 I24

EQUIPMENT POTENTIAL TRANSFORMER DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

6) Ratio check

Phase PT Ratio Pri.Injected Volt Secondary Voltage Measured


Core 1 Core 2 Core 3
R

7) Check open Delta Voltage (not applicable)

Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 4 I24

EQUIPMENT POTENTIAL TRANSFORMER DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

8 ) Instruments used for Testing

Name Megger Multimeter Thermometer


Serial No
Make
Rating
Calibrated on

Name Megger Multimeter


Serial No
Make
Rating
Calibrated on

Name Signature Date Remarks

Tester
Comm.
Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 1 I24

EQUIPMENT EXCITATION TRANSFORMER DOC NO

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

FEEDER :

1) Name Plate Details :


Sl No. PT -3 Make

KKS No. R: Y: B: Type

Core 1 2 3

Ratio 11000/200
Application AVR EXCITATION
Burden VA

ACC. Class

2) Check for ECC : As per erection check list

3) Winding Resistance Check (in ohms) : Ambient Temperature :-


Sec.Phase Core 1

PRIMARY

SECONDARY

Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 2 I24

EQUIPMENT POTENTIAL TRANSFORMER DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

4) Insulation Resistance Check ( in Mega Ohms)


R Y B Remarks
Primary to Earth

Primary to Secondary Core 1

Primary to Secondary Core 2

Primary to Secondary Core 3

Secondary Core 1 to Earth

Secondary Core 2 to Earth

Secondary Core 3 to Earth

Sec Core 1 to Sec Core 2

Sec Core 1 to Sec Core 3

Sec Core 2 to Sec Core 3


5) Polariry Check

R Y B
Secondary Core 1

Secondary Core 2

Secondary Core 3

Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 3 I24

EQUIPMENT POTENTIAL TRANSFORMER DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

6) Ratio check

Secondary Voltage Measured


Phase PT Ratio Pri.Injected Volt
Core 1 Core 2 Core 3
R

7) Check open Delta Voltage (not applicable)

Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 4 I24

EQUIPMENT POTENTIAL TRANSFORMER DOC NO 0

LOCATION LA,SC,PT & CT PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

8 ) Instruments used for Testing

Name Megger Multimeter Thermometer


Serial No
Make
Rating
Calibrated on

Name Megger Multimeter


Serial No
Make
Rating
Calibrated on

Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant

Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL
1 I24

EQUIPMENT AUXILIARY RELAY DOC NO

LOCATION RELAY, METERING & SYN PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

FEEDER :

1) Name Plate Details

Serial No. Make

KKS No. Type

Rated Volt Rated Current Aux. Volt

2) General Checks :
Result Remarks
2.1 Ensure the relay is free from dust

2.2 Check all moving parts are free to move NA

2.3 Check no damage to internal parts

2.4 Check for correct labeling in Relay panels

2.5 Check for tightness of Relay terminals


connections
2.6 Check for DC supplies and CT/PT connections
are of correct polarity
2.7 Check Relay target is free to operate

2.8 Check for right breaker tripping and right


alarm/annunciation NA
2.9 IR values between all terminals to body

2.10 IR values between current/volt terminals to NA


DC terminals
Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant
Comm.
Engineer
Consultant

Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
2 I24

EQUIPMENT AUXILIARY RELAY DOC NO 0

LOCATION RELAY, METERING & SYN PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE
3) Secondary Injection Test

Phase Link Setting Pick up Drop off Remarks

Name Signature Date Remarks

Tester
Tester
Comm.
Engineer

Consultant

Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
3 I24

EQUIPMENT AUXILIARY RELAY DOC NO 0

LOCATION RELAY, METERING & SYN PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

4 ) Instruments used for Testing

Secondary
Name Megger Multimeter
Injection Kit
Serial No
Make
Rating
Calibrated on Not Reqd.

Name Megger Multimeter


Serial No
Make
Rating
Calibrated on

Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant

Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 1 I24
EQUIPMENT AUXILIARY RELAY DOC NO

LOCATION RELAY, METERING & SYN PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

FEEDER :

1) Name Plate Details

Serial No. Make

KKS No. Type

Rated Volt Rated Current Aux. Volt

2) General Checks :
Result Remarks
2.1 Ensure the relay is free from dust

2.2 Check all moving parts are free to move NA

2.3 Check no damage to internal parts

2.4 Check for correct labeling in Relay panels

2.5 Check for tightness of Relay terminals


connections
2.6 Check for DC supplies and CT/PT connections
are of correct polarity
2.7 Check Relay target is free to operate

2.8 Check for right breaker tripping and right


alarm/annunciation NA
2.9 IR values between all terminals to body

2.10 IR values between current/volt terminals to NA


DC terminals
Name Signature Date Remarks

Tester
Comm.
Engineer

Consultant

Customer
Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 2 I24

EQUIPMENT AUXILIARY RELAY DOC NO 0

LOCATION RELAY, METERING & SYN PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE
3) Secondary Injection Test

Phase Link Setting Pick up Drop off Remarks

Name Signature Date Remarks

Tester
Comm.
Engineer

Consultant
Comm.
Engineer
Consultant

Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL 3 I24

EQUIPMENT AUXILIARY RELAY DOC NO 0

LOCATION RELAY, METERING & SYN PANEL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

4 ) Instruments used for Testing

Secondary
Name Megger Multimeter
Injection Kit
Serial No
Make
Rating
Calibrated on Not Reqd.

Name Megger Multimeter


Serial No
Make
Rating
Calibrated on

Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant

Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCOL
1 I24

EQUIPMENT AC GENERATOR DOC NO

LOCATION TG HALL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

SYSTEM SUB SYSTEM EQUIPMENT

1) Name Plate Details :


Make TDPS Type Serial No

Voltage 11000 Current Frequency 50

Capacity (KW) 8000 PF 0.8 Phase 3


Type of
Y Type of enclosure KKS No
connection

2) Check for ECC :

3) Insulation Resistance Test :


Reference Value Actual Value
R - Y,B,Earth Y -R,B, Earth B -R,Y, Earth R - Y,B,Earth Y -R,B, Earth B -R,Y, Earth

4) Winding Resistance Measurement : Ambient Temperature :


Reference Value Actual Value
U1-U2 V1-V2 W1-W2 U1-U3 V1-V3 W1-W3

5) Rotor Resistance :
Reference Value Actual Value
Value in ohms REMARK Value in ohms REMARK

Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant
Comm.
Engineer
Consultant

Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
2 I24

EQUIPMENT AC GENERATOR DOC NO 0

LOCATION TG HALL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

6)Rotor IR Value :
Reference Value Actual Value
Value in Meg ohms Remark Value in Meg ohms Remark

7) Exciter Field Resistance :


Reference Value Actual Value
Value in ohms Remark Value in ohms Remark

8) Exciter Field IR Value :


Reference Value Reference Value
Value in Meg ohms Remark Value in Meg ohms Remark

9) Generator PI Value :
Reference Value at Value at
PI = 10 minute/ 1 minute
1 Minute 10 Minutes
R,Y,B - Earth

10) Check of Accessories : Result


a) Diode check
b) Water leakage Detector
c) Local Gauges
d) Junction Box Connections
e) Main and Neutral Terminal
f) Space heater operation
g) RTDs
h) Slip ring connection to REF relay
I) Shaft earthing through brush
Name Signature Date Remarks

Tester

Comm.
Engineer
Consultant

Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCOL
3 I24

EQUIPMENT AC GENERATOR DOC NO 0

LOCATION TG HALL FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

10 ) Instruments used for Testing

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on

Name Megger Multimeter Tong Tester Vibrometer Thermometer


Serial No
Make
Rating
Calibrated on
Remarks :

Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant

Customer
Customer
emarks
emarks

emarks
Page Dept :
PRE COMMISSIONING TEST PROTOCAL
1 I24

EQUIPMENT GENERATOR DIFFERENTIAL STBILITY TEST DOC NO 0

LOCATION FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

Primary Current Secondary Current Measured


Phase CT Ratio
injected Metering Protn Diff Ph Diff Neu AVR
R

Y
B
Name Signature Date Remarks

Erector

Erection
Engineer
Consultant

Customer
Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCAL
2 I24

EQUIPMENT GENERATOR DIFFERENTIAL STBILITY TEST DOC NO 0

LOCATION FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

CHECKS CARRIED OUT : RESULT REMARKS

1) Stabilisinrg Resisters set in recommended Value

2) Operation of Differential Relay during Reverse Polarity

3) Operation of Differential Relay during Correct Polarity

4) Differential CT set for Correct Polarity

5) Operation of Overcurrent/Earth fault Relay

6) Operation of Negative phase Sequence Relay

Name Signature Date Remarks

Erector

Erection
Engineer
Consultant

Customer
Page Dept :
PRE COMMISSIONING TEST PROTOCAL
1 I24

EQUIPMENT HT SUPPLY BACK CHARGE TEST DOC NO 0

LOCATION FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE DATE

Primary Voltage Secondary volt Measured


Phase PT Ratio
injected Metering Protn AVR Exctn PT Remark
R-N

Y-N

B-N

R-Y

Y-B

B-R

PHASE SEQUENCE

R-N

Y-N

B-N

R-Y

Y-B

B-R

PHASE SEQUENCE

Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant

Customer
Customer

Page Dept :
PRE COMMISSIONING TEST PROTOCAL
2 I24

EQUIPMENT HT SUPPLY BACK CHARGE TEST DOC NO 0

LOCATION FILE NO

CUSTOMER VARDHMAN - 8 MW TG SET REPORT NO

SITE 0 DATE

CHECKS CARRIED OUT : RESULT REMARKS

1) All the PTs are in RYB sequence

2) Voltage Between the same phase of different PT is zero

3) Voltage measured at Meters

4) Voltage measured at Relays

5) Voltage measured at AVR

6) Voltage at Synchronizing Circuit

7) Operation of Check sync.Relay

8) Position of Synchroscope falling at 12'o clock

9) Operation of Auto Synchroniser

10) Settings of Auto Synchroniser

Name Signature Date Remarks

Tester
Comm.
Engineer
Consultant

Customer