SOP No. 93
Rev. No: 00
Rev. Date: 30.11.12
Pages: 1 | 2
HT
Prior to starting any meggering work carry out pre-job planning and risk
assessment.
Obtain safe work and isolation permit before carrying out the job.
Ensure personnel performing the meggering are authorized to do the job & are
familiar with the manufacturer's operation and maintenance manual before
beginning the maintenance.
Clear and close off working area. During work ensure restricted area is identified
with warning signs and tape.
Operate the HT megger at stipulated voltage with both the probes open. The
reading should be infinity.
Operate the megger with both the leads shorted. The reading should be zero
(short)
Connect one lead to an earth point and other to another point on the frame. The
reading should be zero (short)
ELECT
SOP No. 93
Rev. No: 00
Rev. Date: 30.11.12
Pages: 2 | 2
Check the transformer HT winding resistance between all three phases using a
multimeter. Connect earth lead of the Megger to earth and the line lead to one
phase of the transformer. Switch on the Megger. Set the Megger at appropriate
voltage. Megger the transformer HT windings and record the 1 minute & 10 minute
Insulation Resistance values. Evaluate the PI value by dividing the 10 minute value
by the 1 minute value. Check whether it is within permissible limits, if not, take
necessary action.
Inspect the exterior of the transformer including cables for damage; inspect
terminals for tightness as well.
Grounding cable: Ensure the grounding cable is bolted securely to the base
equipment mounting surface.
Ensure that no tools are left inside the terminal box. Close the terminal cover.
Rack in the HT VCB, Insert the control plug. Close the HT VCB.
Load the transformer by closing the LT ACB as per standard procedure.
Record the IR & PI values in the register.